HomeMy WebLinkAbout0108875-Building (foundation) � CITY OF OSHKOSH No 108875
� NED
OSHKOSH BUILDING PERMIT -APPLICATION AND RE D�,
. ON THE WATER �1 �1'
Job Address 1132 W 5TH AVE Owner MICHAEL E/SHELL BLAU �te Date O6/23/2004
Designer Contractor SURE-DRY-BASEMENT SYSTEMS INC
Category 141 -Exterior Remodeling Plan
Type � Building � Sign ' � Canopy � Fence � Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. �� Projection
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete 0 Floating Slab Pier 0 Other
� Concrete Block � Post Treated Wood -----
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
- -- - __ --- — — — --__.
Use/Nature SFR/Excavating 31'along the west foundation wall,installing new draintile,stone,and sump pump. A total of 20 grip tite wall anchors i
of Work W��I be installed.
�
� i
� i
�
I
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $13,965.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00
_ __ --- - ;�
Issued By: � Date 06/23/2004 Final/O.P. 00/00/0000
L_J Permit Voided', Parcel Id#0608250000
_ __—_
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
Signature� �gQR,,e,�� Date (� 2,3 0
T � AgenUOwner
Address 230 N DIVISION APPLETON WI 54911 - 4609 Telephone Number 920-830-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready. :