Loading...
HomeMy WebLinkAbout0108974-Plumbing (water heater)OSHKOSH ON THE WATER .lob Address 1430 ELMWOOD AVE Contractor M P KELLY Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner HEART OF THE HOME OF WISCONSIN LLC Category 411 - Residential-Water Heaters No 108974 Create Date 06/28/2004 Plan 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 0 WaterSoftner 0 Drink Ftn 0 ServSink 0 Soda Disp 0 0 Local Waste 0 Wait. St. 0 ShampSink 0 Coffee Maker 0 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work REPLACED NG WTR HTR Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $768.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided Issued By Parcel Id # 1202260000 Date 06/28/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.