Loading...
HomeMy WebLinkAbout0108854-Building (siding)OSHKOSH ON THE WATER .lob.Address 1125 GARFIELD ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JENNIFERKKESO Contractor BOB GRIFFIN CARPENTRY Category 141 - Exterior Remodeling No 108854 Create Date 06/23/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Installing vinyl siding on the house and garage, installing 1/2" foam under the siding, and installing 7 replacement windows (same size and of Work location). Seckar Elec is doing the electrical work. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $13,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $89.00 Park Dedication $0.00 Date 06/23/2004 Final/O.P. 00/00/0000 Parcel Id # 0503050000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1955 SKYRANCH AVE OSHKOSH WI 54904 - 0000 Telephone Number 235-4153 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.