Loading...
HomeMy WebLinkAbout0108838 B(~ CITY OF OSHKOSH OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 221-225 S WESTFIELD ST Owner MARYA KEMPS Designer Contractor KEMPS CONSTRUCTION INC Category 140 - Interior Remodeling No 108838 Create Date 06/15/2004 Plan Type 10 Building ~ Sign ~ Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature DUPLEX/Gutting the lower levels of the bi-level duplex due to water/sewer damage. Removing all walls, insulation, drywall. Re-framing this of Work area (walls will remain in the same location), new insulation and drywall. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $20,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $124.00 Park Dedication $0.00 Date 06/22/2004 Final/O.P. 00/00/0000 Parcel Id # 0615150000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 221 S WESTFIELD ST OSHKOSH WI 54902 - 0000 Telephone Number 233-4002 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.