Loading...
HomeMy WebLinkAbout0108907-Building (raze garage)OSHKOSH ON THE WATER .lob .Address 20 W 12TH AVE Designer Category CITY OF OSHKOSH No BUILDING PERMIT - APPLICATION AND RECORD Owner RICHARD AWILKINS Create Date Contractor OWNER 162 - Wrecking Residential Accessory Structures Plan 108907 06/24/2004 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature RENTAL/LATE PERMIT/Razed the existing detached garage. Code compliant off street parking or a garage for the required parking spaces of Work is required prior to allowing occupancy of this dwelling. All materials including the slab are required to be removed. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $500.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 06/24/2004 Final/O.P. 00/00/0000 Parcel Id # 0303190000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2340 GENEVA ST OSHKOSH WI 54901 - 1804 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.