HomeMy WebLinkAbout0108907-Building (raze garage)OSHKOSH
ON THE WATER
.lob .Address 20 W 12TH AVE
Designer
Category
CITY OF OSHKOSH No
BUILDING PERMIT - APPLICATION AND RECORD
Owner RICHARD AWILKINS Create Date
Contractor OWNER
162 - Wrecking Residential Accessory Structures Plan
108907
06/24/2004
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature RENTAL/LATE PERMIT/Razed the existing detached garage. Code compliant off street parking or a garage for the required parking spaces
of Work is required prior to allowing occupancy of this dwelling. All materials including the slab are required to be removed.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$500.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$20.00 Park Dedication $0.00
Date 06/24/2004 Final/O.P. 00/00/0000
Parcel Id # 0303190000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2340 GENEVA ST OSHKOSH WI 54901 - 1804 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.