Loading...
HomeMy WebLinkAboutItem II PLAN COMMISSION STAFF REPORT MARCH 5, 2024 ITEM II: PRELIMINARY PLAT FOR THE CREATION OF AN 8-LOT MULTI-FAMILY RESIDENTIAL SUBDIVISION AT THE WEST 3400-3500 BLOCKS OF LAKE BUTTE DES MORTS DRIVE (LAKE BUTTE DES MORTS DEVELOPMENT) GENERAL INFORMATION Applicant: Claire Roth - ISG, Inc. Owner: Red Earth, LLC Action Requested: The applicant is requesting approval of a preliminary plat containing 8 multi-family residential lots and street dedications identified as Lake Butte des Morts Development. Applicable Ordinance Provisions: Requirements governing platting are located within Article XIII, Subdivisions; Sections 30-441 through 30-446 of the Zoning Ordinance. Property Location and Background Information: The area of this request includes several undeveloped/unplatted parcels totaling 66.9 acres generally located west of Lake Butte des Morts Drive. The property is zoned Neighborhood Mixed Use with Planned Development Overlay (NMU-PD). Red Earth LLC received General Development Plan (GDP) approval by the Common Council on April 11, 2023 (Resolution 23-173) for a 6-phase, 522-unit multi-family residential development. Phase 1 will split 4.76 acres of land including two right-of-way connections to Lake Butte des Morts Drive via Certified Survey Map (Item I). The Lake Butte des Morts Development Plat which surrounds Phase 1 subdivides the area into an additional eight lots and creates a looped public road right-of-way for Phases 2 through 6. A Specific Implementation Plan (SIP) request for Phases 2 through 6 has also been submitted for review (Item III). Subject Site – Proposed Plat and CSM Page 1 Item II – Preliminary Plat – Lake Butte des Morts Development The Comprehensive Plan’s land use recommendation for the site is Mixed Use which is consistent with the proposed multi-family development. The area is surrounded by vacant/undeveloped land to the north and south, U.S. Highway 45 to the east and Lake Butte des Morts and the WIOUWASH State Recreation Trail to the west. There are also several single-family uses southwest of the subject site, west of the trail. Subject Site Existing Land Use Zoning Undeveloped/Agricultural Neighborhood Mixed Use with Planned Development Overlay (NMU-PD) Recognized Neighborhood Organizations None Adjacent Land Use and Zoning Existing Uses Zoning North Undeveloped/Agricultural Single Family Residential-5 (SR-5) South Undeveloped/Agricultural General Business District (B-3, Town of Oshkosh) East US Highway 45 NA West Single Family Residential General Agriculture District (A-2, Town of Oshkosh) Comprehensive Plan Land Use Recommendation Land Use 2040 Land Use Recommendation Mixed-Use ANALYSIS The proposed lot sizes range greatly from 1.2 acres (Lot 8) to 17.0 acres (Lot 2). All of the proposed lots exceed the minimum area and dimensional requirements of the NMU Zoning District in regard to width (40 feet minimum), depth (100 feet minimum) and area (1,200 square feet per dwelling unit minimum). The proposed 442 dwelling units for Phases 2 through 6 on the 64.7-acre area (after deduction of the right-of-way) results in a unit density of approximately 6.8 units per acre (one unit per 6,373 square feet) which is considered low. Lots 1 through 5 are impacted by wetlands covering much of the Lots’ areas. The wetland areas have been mapped and are included on the preliminary plat. Proposed Preliminary Plat Page 2 Item II – Preliminary Plat – Lake Butte des Morts Development The wetland areas will not be disturbed during development. The plat will extend the 60-foot rights-of-way of both Oliver Avenue and Olivia Road westerly. A loop will be created with a north-south segment to be named Blair Boulevard. This will provide public access to all phases of the proposed development. The total length of the dedication is approximately 1,600 feet or 0.3 miles. City Police and Fire Departments have reviewed the preliminary plat and have not indicated any issues. Both departments do not anticipate problems servicing the proposed development. The Oshkosh Area School District has been notified of the proposed subdivision and has not responded with concerns about being able to accommodate a potential increase in student population. Engineering & Storm Water The Department of Public Works has reviewed availability of City utilities to serve the development and reported that City water and sanitary are available from Lake Butte des Morts Drive. Storm water management will be located within the developable area of the site, outside of any mapped wetlands. Civil plans including water, grading and drainage, sanitary sewer, paving, storm water, terrace tree, and street lighting will be submitted with the final plat. The developer has been working with City Staff to start preliminary design of civil plans and ensure they meet code requirements. Parkland Dedication The Subdivision Regulations require land dedication in the amount of 900 square feet per each dwelling unit developed within the plat created by the plat. This equates to 397,800 square feet (9.13 acres) of land dedication based on the proposed 442 units. The Common Council may, in- lieu-of land dedication, accept parkland fees in the amount of $165 per dwelling unit at final plat acceptance for a total of $72,930. An additional $13,200 can be collected with the mapping of Phase I created by Certified Survey Map. Additional parkland fees of $165 per unit would be collected at building permit issuance as each phase develops. The Park’s Comprehensive Outdoor Recreation Plan does recommend a community park northwest of USH 45. However, these parks are generally sized at 15 to 30 acres. Planning staff had discussions with the Parks Director and determined it would be best if the City accepted fees in-lieu of in this case to allow the City to pool money and purchase an adequate-sized tract of land in this area. This recommendation was presented to the Advisory Parks Board at their February 12, 2024 meeting. The Board concurred with this assessment and will make a recommendation to the Common Council to accept fees in-lieu of in place of land dedication. Page 3 Item II – Preliminary Plat – Lake Butte des Morts Development FINDINGS/RECOMMENDATIONS/CONDITIONS In its review and recommendation to the Common Council on an application for a Preliminary Plat, staff recommends the Plan Commission consider findings based on Subdivision Policies established by Chapter 30-442(M)(3): (a) To preserve and enhance existing cities and villages, and encourage compact balanced growth shared by, and in association with, all the region's cities and villages. (b) To encourage the development of balanced compact communities in Winnebago County with appropriate commercial, public services, industrial, employment, residential, and open space land uses, meeting the needs of present and future residents of those communities. (c) To direct new growth to those areas capable of providing a full range of urban services and facilities. (d) To prevent scattered and noncontiguous development without discouraging new and desirable development. (e) To ensure that new development will not be detrimental to the physical, social, and economic wellbeing of residents of the City or the County. (f) To ensure that new development will be organized and timed so as to permit urban services and facilities to be provided as economically and efficiently as possible. (g) To discourage new developments in those areas that are premature in terms of planning and timing for the provision of adequate public services and facilities. Staff recommends approval of the 8-lot Preliminary Plat, Lake Butte des Morts Development as proposed. Page 4 Staff ______ Date Rec’d ______ City of Oshkosh Application Subdivision & Certified Survey Map **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Fax: ( ) __________________ Other Contact # or Email: _______________________ Status of Petitioner (Please Check):  Owner  Representative  Tenant  Prospective Buyer Petitioner’s Signature (required): _______________________________________________________________ Date: ____________ OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Fax: ( ) __________________ Other Contact # or Email: _______________________ Ownership Status (Please Check):  Individual  Trust  Partnership  Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner’s Signature: ___________________________________________________________________ Date: ____________ SUBDIVISION INFORMATION (Please Check):  Residential  Commercial/Industrial  Other Approvals Requested (Please Check):  Preliminary Subdivision Plat*  Final Subdivision Plat  Certified Survey Map *If preliminary plat, is the entire area owned or controlled by subdivider included? Yes____ No____ Location of Proposed Project: _________________________________________________________________________________ Zoning Classification: _________________________________________________________________________________________ Reason for Division: __________________________________________________________________________________________ Proposed Number of Lots: _________________ Proposed Lot Sizes: Min. ___________ Max. ____________ Average ___________ Acres in Parcel(s): ____________________________________________________________________________________________ Proposed Project Type (include use of buildings and property): ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Current Use of Property (include existing structures): ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 PHONE: (920) 236-5059 7900 International Dr, Suite 550 Bloomington MN 55425 952 426-0699 Claire.Roth@ISGInc.com Claire Roth - ISG Inc. (on behalf of owner)01/22/2024 01/22/2024 Red Earth LLC. (Contact: Jacob Buswell) 1310 West Wisconsin St Sparta WI 54656 262 623-8348 jake.buswell@allamericandoitcenter.com 01/22/2024 Agricultural / vacant Multi-family residential development with the option to move to mixed use in future through the addition of commercial space. 8 Lake Butte Des Morts Drive Neighborhood Mixed Use District with Planned Development Overlay (NMU-PD) Development of multi-family housing development to include approximately 350 - 400 apartments, 20 townhomes, a clubhouse and several additional amenities DocuSign Envelope ID: 23447A38-982E-4B5D-BB1A-C6CCD3BF5475 1/18/2024 1.16 AC 16.98 AC 8.19 AC 65.55 acres total. Refer to plans for respective lot sizes. Page 5 2 Significant Natural Amenities (slope, vegetation, large tree stands, etc.): ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Floodplains, navigable streams, wetlands, and Other Development Restrictions: ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Variances- List and explain any requested variances from the Subdivision Regulations: ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ **Please note that a meeting notice will be mailed to all abutting property owners regarding your request. SUBMITTAL REQUIREMENTS – Must accompany the application to be complete.  Basic Materials  Completed Application  Legal Description of Site  Twenty-Six (26) full size paper prints of the preliminary or final plat prepared in accordance with City Subdivision Regulations  One copy of the subdivision plat reduced to 8 ½” x 11”  One copy of the Certified Survey Map  Digital Copy of Preliminary Plat, Final Plat, or CSM in Autocad 2000 format (plans may be e-mailed to the Planning Office)  Plat Data  Title  Legal description and general location of property  Date, scale and north arrow  Names and addresses of the owner, subdivider, and land surveyor preparing the plat  Entire area contiguous to the proposed plat owned or controlled by the subdivider shall be included on the preliminary plat  Exterior boundaries  Contours  Water elevations  Location, rights-of-way widths and names  Location and names of any adjacent subdivisions  Type, width and elevation of existing street pavements within the plat or adjacent thereto  Location, size, and invert elevation of existing infrastructure items such as sewers, manholes, power poles, etc.  Locations of all existing property boundary lines  Dimensions of all lots with proposed lot and block numbers  Location and dimensions of any sites to be reserved or dedicated for parks, trails, playgrounds, drainage ways, or other public use, or which are to be used for group housing, shopping centers, church sites, or other non-public uses not requiring lotting  Approximate radii of all curves  Corporate limit lines  Any proposed lake and/or stream access  Any proposed lake and stream including the notice of application for Dept. of Natural Resources’ approval, when applicable  Location of environmentally sensitive areas (wetlands, floodplains, navigable streams, etc.) For further information see Section 30-72 of City of Oshkosh Subdivision Regulations for Submittal Requirements  Application fees are due at time of submittal. Make check payable to City of Oshkosh.  Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City’s website at https://www.ci.oshkosh.wi.us/CommunityDevelopment/ N/A Wetlands and floodplain are present on site around the existing farmland and are depicted on the plat. Existing site use is agricultural, constituted of tillable acreage with the remainder being existing wetland. DocuSign Envelope ID: 23447A38-982E-4B5D-BB1A-C6CCD3BF5475 Page 6 JANUARY 22, 2024 Mark Lyons Planning Services Manager – Community Development 215 Church Ave Oshkosh, WI 54901 mlyons@ci.oshkosh.wi.us 7900 International Drive + Suite 550 + Bloomington, MN 55425 952.426.0699 + ISGInc.com Architecture + Engineering + Environmental + Planning RE: SIP & PRELIM PLAT PROJECT NARRATIVE LAKE BUTTE DE S MORTS DEVELOPMENT PHASES 2 – 6 - OSHKOSH, WI Mark, Thank you for reviewing the following Specific Implementation Plan (SIP) and Preliminary Plat narrative for phases 2 – 6 of the Lake Butte Des Morts development. The site location is currently zoned NMU-PD. Surrounding area to the east and to the south consists of the Interstate 41/U.S. Highway 45 interchange, Lake Butte des Morts to the west and vacant tracts of land to the north. The only nearby development is lakefront residential housing to the southwest. PROJECT DESCRIPTION In 2023, a GDP was granted for Phases 1 – 6 of the Lake Butte des Morts development and an SIP was granted for phase 1 of the development at the west 3400 block of Lake Butte des Morts Drive which included two 40-unit apartments and a clubhouse. This SIP and Preliminary Plat request is specific to the remaining phases of the development, Phases 2 – 6. This will include five additional 82-unit apartment buildings, and eight 4-unit townhomes, totaling to 442 additional units. Phases 2 – 6 total to 65.55 acres of land and have a proposed unit density of 6.7 units/acre. Additionally, the project will consist of a 2.19 acres of Public Right-of-Way containing a City street looping through the development, providing public water and sanitary mains for the proposed building services. An anticipated phasing plan is included with the site plan submittal. It is anticipated that phases 2-6 will be constructed over the next 12-15 years. Due to the unique makeup of buildings and proposed density, the site was rezoned to include a Planned Development to minimize the need for conditional uses and variances required within a typical residential zoning district (MR-36) such as minimum lot area, impervious surface ratio, setbacks, building height, and number of units per building. The PDD also allows future flexibility for the development. The proposed SIP for phases 2 – 6 is consistent with the approved GDP and does not differ between the requirements of the approved GDP. Parking Both underground and exterior parking will be provided on site. The site proposes 645 total stalls including 390 parking spaces located underground in the 82 unit buildings, 191 spaces in designated parking lots, and 64 Townhome garage parking; the total proposed parking count is 645 stalls. This equates to a proposed 1.46 stalls/unit and meets the requirements of the City parking code (466 stalls required). Additional parking was included with Phase I to be used by the entire development and overflow parking will be allowed on one side of the City street. Density, Intensity, and Bulk Regulations The project will be subdivided into different lots corresponding to each phase. The proposed minimum lot size is 1.16 acres (Lot 8), maximum size is 16.68 acres (Lot 2), and the average lot size is 8.19 acres. The lots corresponding to each phase are indicated in the table below, along with the lot sizes. Phase / Lot Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Lot 1 Lot 2 Lot 8 Lot 3 Lot 7 Lot 4 Lot 6 Lot 5 Lot Area (acres) 11.99 16.98 1.16 6.49 1.76 15.97 2.12 9.09 Page 7 Page 2 of 4 952.426.0699 + ISGInc.com Information on the areas of all development lots, building coverage, and landscaping surface area ratio of all land uses is included in the attached plan sets. As the site is developed there may need to be flexibility on the order of phases and have each building on a separate lot to meet the needs of the development. Anticipated phasing plan is included with the submitted site plans for reference. Landscaping, Site Drainage, and Connectivity The overall landscape plan offers many different features including shade, color, structure, and screening. A traditional low maintenance planting plan consisting of native deciduous and evergreen plantings that will compliment architectural features and enhance new spaces has been developed and included. Native trees will be interspersed throughout the site to create a shaded canopy for residents and increase the tree canopy density of the site. Less yard trees than required within the Oshkosh landscape code have been proposed. Refer to code tables on subsequent landscape plan sheets. Due to the square footage of the 82 unit buildings the required yard landscaping exceeds the functional constraints of the site. The required quantity of trees would detract from the designed aesthetics and reduce visibility across the site. Also, due to the edges of the buildable area being frequently wet and sloped this detracts from placement of further landscape elements. Site drainage and grading will consider overall site features (existing and proposed) ensuring all elements work together to create an effective drainage plan. All stormwater is to be seeded with native seed mixes adding to enhance the overall aesthetic of the site. Additional areas of native seeding will also be provided to provide water quality improvements, wildlife habitat including wildflowers for pollinators. A network of sidewalks will offer many values including connectivity and exercise opportunities throughout the site. A connection to the existing Wiouwash Trail will be made at the southwest end of the proposed development. Separate lake access and Kayak storage will offer residents the opportunity to take advantage of Lake Butte Des Morts. A sidewalk is currently not available to connect to along Lake Butte Des Morts Drive, but site grading will take into consideration the possibility of one being added at a future date. Site amenities throughout the development include open lawn space and trails, several fenced dog parks, a pickleball/basketball court, grilling area, fire features, outdoor pool, and clubhouse. Equipment and Signage There will not be any outdoor storage and refuse disposal areas, as these are contained within each building. The exterior mechanical systems will be determined during the design-build process for the respective systems and cannot be located at this time. It is intended to design them into the buildings, so they blend in or are screened with landscaping. A signage plan has not been included with the submission. Currently, the plan sets show a monument sign. As this is a primarily residential development, minimal additional signage is anticipated, aside from address numbers on the buildings. Development Themes and Aesthetics The overall aesthetic of the site is to incorporate traditional architectural elements with an integrated landscape plan, as noted above. Images of the proposed buildings are included on the following pages and renderings are also attached to this submission. Agreements, Bylaws, Covenants The project will require a developer’s agreement between Red Earth LLC and the City of Oshkosh. The property will be owned and maintained by Red Earth LLC following completion of the construction. Additional bylaws and covenants can be provided by Red Earth LLC at a later date. Page 8 Page 3 of 4 952.426.0699 + ISGInc.com Please contact me at 952.426.0699 or via email at Claire.Roth@ISGInc.com with any questions or if there is any additional information we can provide in support of this project. Sincerely Claire Roth Development Services Coordinator Claire.Roth@ISGInc.com Page 9 Page 4 of 4 952.426.0699 + ISGInc.com Page 10 GFO G G G G G BENCHMARK=3/4" I r o n B a r 761.61 << << <<OHL OHL OHL OHL OHL OHL G G G G G G OHLG G G OHL OHL OH L Access Righ t s (per Doc. N o . 3 3 4 7 5 5 ) Transm i s s i o n L i n e E a s e m e n t (per Do c . N o . 3 5 7 0 4 7 ) G G G 75' R.O. W . G r a n t f o r G a s L i n e P u r p o s e s (per Vol . 8 4 1 , P g . 1 1 9 ) 75' R.O. W . G r a n t f o r Gas Lin e P u r p o s e s (per fiel d m a r k i n g s b y u t i l i t y ) T/ C = 7 5 6 . 6 2 EX C B I= 7 5 1 . 1 7 ( 1 2 " R C P ) N I= 7 5 1 . 1 7 ( 1 2 " R C P ) E I= 7 5 1 . 1 2 ( 1 2 " R C P ) W I= 7 5 0 . 0 2 S U M P T/ C = 7 5 6 . 6 1 EX C B I= 7 5 1 . 3 6 ( 1 2 " R C P ) S I= 7 5 0 . 3 1 S U M P T/ C = 7 6 1 . 0 2 EX C B I= 7 5 5 . 5 2 ( 1 2 " R C P ) E I= 7 5 5 . 5 2 ( 1 2 " R C P ) W I= 7 5 4 . 6 2 ( " ) S U M P T/C = 7 6 0 . 4 5 EX C B I= 7 5 4 . 8 5 ( 1 2 " R C P ) E I= 7 5 3 . 9 5 S U M P T/ C = 7 5 9 . 1 2 EX C B I= 7 5 3 . 6 3 ( 1 2 " R C P ) E I= 7 5 2 . 6 3 S U M P T/ C = 7 5 8 . 2 9 EX C B I= 7 5 2 . 5 9 ( 1 2 " R C P ) N I= 7 5 1 . 7 9 ( " ) S U M P T/ C = 7 5 8 . 3 1 EX C B I= 7 5 2 . 6 1 ( 1 2 " R C P ) S I= 7 5 2 . 4 6 ( 1 2 " R C P ) E I= 7 5 1 . 2 1 ( " ) S U M P T/ C = 7 5 9 . 2 6 EX C B I= 7 4 9 . 8 6 ( 2 4 " R C P ) S I= 7 4 9 . 7 6 ( 2 4 " R C P ) N W I=749. 5 8 I= 7 5 5 . 0 2 I= 7 5 2 . 3 3 I= 7 5 0 . 6 4 T/ C = 7 5 9 . 7 5 EX C B I= 7 5 3 . 5 5 ( 1 2 " R C P ) W T/C = 7 6 1 . 6 2 EX C B I= 7 5 5 . 9 8 ( 1 2 " R C P ) E I= 7 5 4 . 5 8 S U M P I= 7 5 1 . 3 1 S26° 5 7 ' 1 2 " E 2 1 8 9 . 3 2 S1° 15' 19"E 870.80 S8 9 ° 2 6 ' 2 0 " W 1 1 7 3 . 6 9 10 6 . 8 7 N6 ° 1 8 ' 4 3 " W N16° 11 ' 2 9 " W 5 3 5 . 6 6 14 7 . 3 4 N1 5 ° 2 1 ' 3 7 " W L=402.67R=758.51 Δ=30°25'00" C=397.96N09°19'08"E TI=N24°31'38"ETO=N5°53'22"W N2 9 ° 4 8 ' 4 1 " E 25 7 . 6 8 L= 3 0 . 0 3 R = 1 0 6 4 . 9 3 Δ= 1 ° 3 6 ' 5 7 " C= 3 0 . 0 3 N 2 7 ° 2 6 ' 4 9 " E TI = S 2 6 ° 3 8 ' 2 1 " W T O = S 2 8 ° 1 5 ' 1 7 " W S 7 4 ° 1 8 ' 4 9 " W 7 1 9 . 5 5 427.6 9 S55 ° 5 8 ' 5 5 " E 1 1 4 2 . 8 3 L 1 0 L 4 L5 L 6 L7L 8L9 443.9 8 S15°41'1 1 " E 1 0 8 9 . 6 9 42 5 . 6 8 1317. 6 5 59.34 S8 9 ° 2 6 ' 2 0 " W 1 4 6 5 . 5 1 S8 9 ° 4 5 ' 2 4 " W 40 . 6 7 N L i n e - N W 1 / 4 S C o r n e r Se c . 3 4 , T w p . 1 9 , R g e . 1 6 Fo u n d S p i k e Wi n n e b a g o C o u n t y , W I N C o r n e r Se c . 3 , T w p . 1 8 , R g e . 1 6 Fo u n d S p i k e Wi n n e b a g o C o u n t y , W I N L i n e - N W 1 / 4 P. O . B . NW C o r n e r Se c . 3 , T w p . 1 8 , R g e . 1 6 Co m p u t e d P o s i t i o n Wi n n e b a g o C o u n t y , W I W'rly Line - L a k e Butte De s M o r t s D r L 1 2 4 5 3 2 1 8 7 6 SE E S H E E T 2 F O R D E T A I L N14° 29' 4 5 " W 349.23 N 8 1 ° 5 9 ' 4 3 " E 4 8 5 . 0 2 SE E S H E E T 2 FO R D I M E N S I O N S P. O . B . W Line - NW 1/4-NW 1/4 NE'rly L i n e - W i n n e b a g o C o u n t y R e c r e a t i o n a l T r a i l W' r l y L i n e - L a k e Bu t t e D e s M o r t s D r SE M o s t C o r n e r CS M L3 L11 SE E S H E E T 2 FO R D I M E N S I O N S Co r p o r a t e L i m i t s - T o w n / C i t y o f O s h k o s h Co r p o r a t e L i m i t s To w n / C i t y o f O s h k o s h WE T W E T WET WET WET WET WE T W E T S 7 4 ° 1 8 ' 4 9 " W 5 7 2 . 1 0 10 2 . 6 3 S1 5 ° 4 1 ' 1 1 " E Ed g e o f W e t A r e a CU R V E T A B L E CU R V E # C1 C2 C3 C4 C5 C6 C7 C8 C9 C1 0 C1 1 C1 2 C1 3 C1 4 C1 5 C1 6 LE N G T H 37 . 5 1 ' 28 . 8 7 ' 47 . 6 9 ' 39 . 4 9 ' 22 4 . 6 9 ' 3. 8 5 ' 22 0 . 8 5 ' 12 0 . 9 9 ' 39 . 4 0 ' 29 . 9 5 ' 10 2 . 1 0 ' 54 . 9 8 ' 54 . 9 8 ' 10 2 . 1 0 ' 80 . 8 5 ' 21 . 2 5 ' RA D I U S 25 . 0 0 ' 23 0 . 0 0 ' 22 0 . 0 0 ' 25 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' 70 . 0 0 ' 25 0 . 0 0 ' 19 0 . 0 0 ' 13 0 . 0 0 ' 70 . 0 0 ' 70 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' DE L T A 85 ° 5 7 ' 5 0 " 7° 1 1 ' 3 5 " 12 ° 2 5 ' 1 0 " 90 ° 3 0 ' 1 8 " 99 ° 0 1 ' 4 9 " 1° 4 1 ' 4 3 " 97 ° 2 0 ' 0 6 " 99 ° 0 1 ' 4 9 " 9° 0 1 ' 4 9 " 9° 0 1 ' 4 9 " 45 ° 0 0 ' 0 0 " 45 ° 0 0 ' 0 0 " 45 ° 0 0 ' 0 0 " 45 ° 0 0 ' 0 0 " 35 ° 3 8 ' 0 5 " 9° 2 1 ' 5 5 " CH O R D B E A R I N G N5 7 ° 2 8 ' 4 0 " W S8 3 ° 0 8 ' 1 2 " W S8 0 ° 3 1 ' 2 4 " W N2 9 ° 0 3 ' 4 0 " E N5 6 ° 1 0 ' 1 6 " W S7 5 ° 0 9 ' 4 1 " W S5 5 ° 1 9 ' 2 4 " E N5 6 ° 1 0 ' 1 6 " W N1 1 ° 1 0 ' 1 6 " W N1 1 ° 1 0 ' 1 6 " W S6 ° 4 8 ' 4 9 " W S6 ° 4 8 ' 4 9 " W N5 1 ° 4 8 ' 4 9 " E S5 1 ° 4 8 ' 4 9 " W S4 7 ° 0 7 ' 5 2 " W S6 9 ° 3 7 ' 5 2 " W CH O R D L E N G T H 34 . 0 9 ' 28 . 8 6 ' 47 . 5 9 ' 35 . 5 1 ' 19 7 . 7 5 ' 3. 8 5 ' 19 5 . 2 3 ' 10 6 . 4 8 ' 39 . 3 6 ' 29 . 9 1 ' 99 . 5 0 ' 53 . 5 8 ' 53 . 5 8 ' 99 . 5 0 ' 79 . 5 6 ' 21 . 2 3 ' TA N G E N T I N N1 4 ° 2 9 ' 4 5 " W S7 9 ° 3 2 ' 2 5 " W S8 6 ° 4 3 ' 5 9 " W N1 6 ° 1 1 ' 2 9 " W N7 4 ° 1 8 ' 4 9 " E N7 4 ° 1 8 ' 4 9 " E S6 ° 3 9 ' 2 1 " E S7 4 ° 1 8 ' 4 9 " W N6 ° 3 9 ' 2 1 " W S6 ° 3 9 ' 2 1 " E S2 9 ° 1 8 ' 4 9 " W N2 9 ° 1 8 ' 4 9 " E N2 9 ° 1 8 ' 4 9 " E S7 4 ° 1 8 ' 4 9 " W S6 4 ° 5 6 ' 5 5 " W S7 4 ° 1 8 ' 4 9 " W TA N G E N T O U T S7 9 ° 3 2 ' 2 5 " W S8 6 ° 4 3 ' 5 9 " W S7 4 ° 1 8 ' 4 9 " W N7 4 ° 1 8 ' 4 9 " E S6 ° 3 9 ' 2 1 " E N7 6 ° 0 0 ' 3 3 " E N7 6 ° 0 0 ' 3 3 " E N6 ° 3 9 ' 2 1 " W N1 5 ° 4 1 ' 1 1 " W S1 5 ° 4 1 ' 1 1 " E S1 5 ° 4 1 ' 1 1 " E N1 5 ° 4 1 ' 1 1 " W N7 4 ° 1 8 ' 4 9 " E S2 9 ° 1 8 ' 4 9 " W S2 9 ° 1 8 ' 4 9 " W S6 4 ° 5 6 ' 5 5 " W LI N E T A B L E LI N E # L1 L2 L3 L4 L5 L6 L7 L8 L9 L1 0 L1 1 L1 2 LE N G T H 13 . 4 4 6. 2 9 26 5 . 4 0 60 . 2 2 50 . 1 1 13 0 . 7 5 16 5 . 0 8 61 . 0 0 27 7 . 0 0 14 5 . 6 3 22 7 . 5 8 12 5 . 6 3 DI R E C T I O N S8 6 ° 4 3 ' 5 9 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W N7 4 ° 1 8 ' 4 9 " E N1 5 ° 4 1 ' 1 1 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W N7 4 ° 1 8 ' 4 9 " E 27 5 8 4 P P L A T DA T E RE V I S I O N S C H E D U L E DE S C R I P T I O N BY SH E E T TI T L E PR O J E C T WI T H O U T P R I O R W R I T T E N C O N S E N T . IN C . A N D M A Y N O T B E U S E D , C O P I E D O R D U P L I C A T E D TH I S D O C U M E N T I S T H E P R O P E R T Y O F I & S G R O U P , PR O J E C T N O . FI L E N A M E DE S I G N E D B Y OR I G I N A L I S S U E D A T E DR A W N B Y CL I E N T P R O J E C T N O . RE V I E W E D B Y FILE LOCATION: S:\PROJECTS\27000 PROJ\27500-27599\27584 LAKE BUTTE DES MORTS DEVELOPME-OSHKOSH WI\27584 PRODUCTION FILES\27584 CIVIL 3D\SURVEY PRODUCTION DWGS\27584 PPLAT.DWG ## 22 - 2 7 5 8 4 ## # # # ## # # # # # # # # # ### ### # # # # # # # # # # # # # # # ### # # OS H K O S H WI S C O N S I N PR E L I M I N A R Y PL A T 0 SC A L E I N F E E T 20 0 40 0 JR O LA K E B U T T E D E S MO R T S DE V E L O P M E N T SE C . 3 , T W P . 1 8 N , R G E . 1 6 E VI C I N I T Y M A P (N O T T O S C A L E ) Wi n n e b a g o C o u n t y , W i s c o n s i n NW 1/4 SE 1/4 S W 1 / 4 NE 1/4 Lake Butte D e s M o r t s D r 3 "L A K E B U T T E D E S M O R T S D E V E L O P M E N T " Lo c a t e d i n t h e N W 1 / 4 o f t h e N W 1 / 4 a n d t h e S E 1 / 4 o f t h e N W 1 / 4 a n d t h e S W 1 / 4 o f t h e N W 1 / 4 a n d t h e N E 1 / 4 o f t h e S W 1 / 4 a n d t h e N W 1 / 4 o f t h e S W 1 / 4 o f S e c t i o n 3 , To w n s h i p 1 8 N o r t h , R a n g e 1 6 E a s t , C i t y o f O s h k o s h , W i n n e b a g o C o u n t y , W i s c o n s i n . LA N D D E S C R I P T I O N Th a t p a r t o f t h e N o r t h w e s t Q u a r t e r o f t h e N o r t h w e s t Q u a r t e r a n d t h e S o u t h w e s t Q u a r t e r o f t h e N o r t h w e s t Q u a r t e r a n d t h e S o u t h e a s t Q u a r t e r o f t h e No r t h w e s t Q u a r t e r a n d t h e N o r t h w e s t Q u a r t e r o f t h e S o u t h w e s t Q u a r t e r a n d t h e N o r t h e a s t Q u a r t e r o f t h e S o u t h w e s t Q u a r t e r o f S e c t i o n 3 , T o w n s h i p 1 8 No r t h , R a n g e 1 6 E a s t , C i t y o f O s h k o s h , W i n n e b a g o C o u n t y , W i s c o n s i n , d e s c r i b e d a s f o l l o w s : Co m m e n c i n g a t t h e n o r t h c o r n e r o f s a i d S e c t i o n 3 ; t h e n c e S o u t h 8 9 d e g r e e s 4 5 m i n u t e s 2 4 s e c o n d s W e s t , a s s u m e d b e a r i n g , o n t h e n o r t h l i n e of s a i d N o r t h w e s t Q u a r t e r , 4 0 . 6 7 f e e t t o t h e s o u t h c o r n e r o f S e c t i o n 3 4 , T o w n s h i p 1 9 N o r t h , R a n g e 1 6 W e s t ; t h e n c e c o n t i n u i n g o n s a i d n o r t h l i n e So u t h 8 9 d e g r e e s 2 6 m i n u t e s 2 0 s e c o n d s W e s t , 1 4 6 5 . 5 1 f e e t t o t h e w e s t e r l y l i n e o f L a k e B u t t e D e s M o r t s D r i v e , s a i d p o i n t b e i n g t h e p o i n t o f be g i n n i n g ; t h e n c e c o n t i n u i n g o n s a i d n o r t h l i n e S o u t h 8 9 d e g r e e s 2 6 m i n u t e s 2 0 s e c o n d s W e s t , 1 1 7 3 . 6 9 f e e t t o t h e n o r t h w e s t c o r n e r o f s a i d Se c t i o n 3 ; t h e n c e S o u t h 0 1 d e g r e e s 1 5 m i n u t e s 1 9 s e c o n d s E a s t o n t h e w e s t l i n e o f s a i d N o r t h w e s t Q u a r t e r o f t h e N o r t h w e s t Q u a r t e r , 8 7 0 . 8 0 fe e t t o t h e n o r t h e a s t e r l y l i n e o f W i n n e b a g o C o u n t y R e c r e a t i o n a l T r a i l ; t h e n c e S o u t h 2 6 d e g r e e s 5 7 m i n u e t s 1 2 s e c o n d s E a s t o n s a i d no r t h e a s t e r l y l i n e , 2 1 8 9 . 3 2 f e e t ; t h e n c e N o r t h 8 1 d e g r e e s 5 9 m i n u t e s 4 3 s e c o n d s E a s t , 4 8 5 . 0 2 f e e t t o t h e w e s t e r l y l i n e o f L a k e B u t t e D e s M o r t s Dr i v e ; t h e n c e n o r t h e a s t e r l y a n d n o r t h e r l y o n s a i d w e s t e r l y l i n e o n t h e f o l l o w i n g 5 c o u r s e s ; 1 ) t h e n c e n o r t h e a s t e r l y 3 0 . 0 3 f e e t a l o n g a no n - t a n g e n t i a l c u r v e , c o n c a v e t o t h e s o u t h e a s t , h a v i n g a r a d i u s o f 1 0 6 4 . 9 3 f e e t , a c e n t r a l a n g l e o f 0 1 d e g r e e s 3 6 m i n u t e s 5 7 s e c o n d s , a n d a ch o r d b e a r i n g a n d d i s t a n c e o f N o r t h 2 7 d e g r e e s 2 6 m i n u t e s 4 9 s e c o n d s E a s t , 3 0 . 0 3 f e e t ; 2 ) t h e n c e N o r t h 2 9 d e g r e e s 4 8 m i n u t e s 4 1 s e c o n d s Ea s t , 2 5 7 . 6 8 f e e t ; 3 ) t h e n c e n o r t h e r l y 4 0 2 . 6 7 f e e t o n a n o n - t a n g e n t i a l c u r v e , c o n c a v e t o t h e w e s t , h a v i n g a r a d i u s o f 7 5 8 . 5 1 f e e t , a c e n t r a l a n g l e of 3 0 d e g r e e s 2 5 m i n u t e s 0 0 s e c o n d s , a n d a c h o r d b e a r i n g a n d d i s t a n c e o f N o r t h 0 9 d e g r e e s 1 9 m i n u t e s 0 8 s e c o n d s E a s t , 3 9 7 . 9 6 f e e t ; 4 ) th e n c e N o r t h 1 5 d e g r e e s 2 1 m i n u t e s 3 7 s e c o n d s W e s t , 1 4 7 . 3 4 f e e t ; 5 ) t h e n c e N o r t h 1 4 d e g r e e s 2 9 m i n u t e s 4 5 s e c o n d s W e s t , 3 4 9 . 2 3 f e e t t o t h e so u t h e a s t e r n m o s t c o r n e r o f C e r t i f i e d S u r v e y M a p N u m b e r _ _ _ _ _ r e c o r d e d a s D o c u m e n t N u m b e r _ _ _ _ _ _ ; t h e n c e w e s t e r l y a n d n o r t h e r l y a l o n g sa i d C e r t i f i e d S u r v e y M a p o n t h e f o l l o w i n g 1 6 c o u r s e s ; 1 ) t h e n c e w e s t e r l y 3 7 . 5 1 f e e t o n a n o n - t a n g e n t i a l c u r v e , c o n c a v e t o t h e s o u t h , h a v i n g a ra d i u s o f 2 5 . 0 0 f e e t , a c e n t r a l a n g l e o f 8 5 d e g r e e s 5 7 m i n u t e s 5 0 s e c o n d s , a n d a c h o r d b e a r i n g a n d d i s t a n c e o f N o r t h 5 7 d e g r e e s 2 8 m i n u t e s 4 0 se c o n d s W e s t , 3 4 . 0 9 f e e t ; 2 ) t h e n c e w e s t e r l y 2 8 . 8 7 f e e t o n a n o n - t a n g e n t i a l c u r v e , c o n c a v e t o t h e n o r t h , h a v i n g a r a d i u s o f 2 3 0 . 0 0 f e e t , a ce n t r a l a n g l e o f 0 7 d e g r e e s 1 1 m i n u t e s 3 5 s e c o n d s , a n d a c h o r d b e a r i n g a n d d i s t a n c e o f S o u t h 8 3 d e g r e e s 0 8 m i n u t e s 1 2 s e c o n d s W e s t , 2 8 . 8 6 fe e t ; 3 ) t h e n c e S o u t h 8 6 d e g r e e s 4 3 m i n u t e s 5 9 s e c o n d s W e s t , 1 3 . 4 4 f e e t ; 4 ) t h e n c e w e s t e r l y 4 7 . 6 9 f e e t o n a t a n g e n t i a l c u r v e , c o n c a v e t o t h e so u t h , h a v i n g a r a d i u s o f 2 2 0 . 0 0 f e e t , a c e n t r a l a n g l e o f 1 2 d e g r e e s 2 5 m i n u t e s 1 0 s e c o n d s , a n d a c h o r d b e a r i n g a n d d i s t a n c e o f S o u t h 8 0 de g r e e s 3 1 m i n u t e s 2 4 s e c o n d s W e s t , 4 7 . 5 9 f e e t ; 5 ) t h e n c e S o u t h 7 4 d e g r e e s 1 8 m i n u t e s 4 9 s e c o n d s W e s t , 6 . 2 9 f e e t ; 6 ) t h e n c e N o r t h 1 5 de g r e e s 4 1 m i n u t e s 1 1 s e c o n d s W e s t , 2 6 5 . 4 0 f e e t ; 7 ) t h e n c e S o u t h 7 4 d e g r e e s 1 8 m i n u t e s 4 9 s e c o n d s W e s t , 6 0 . 2 2 f e e t ; 8 ) t h e n c e N o r t h 1 5 de g r e e s 4 1 m i n u t e s 1 1 s e c o n d s W e s t , 5 0 . 1 1 f e e t ; 9 ) t h e n c e S o u t h 7 4 d e g r e e s 1 8 m i n u t e s 4 9 s e c o n d s W e s t , 1 3 0 . 7 5 f e e t ; 1 0 ) t h e n c e N o r t h 1 5 de g r e e s 4 1 m i n u t e s 1 1 s e c o n d s W e s t , 1 6 5 . 0 8 f e e t ; 1 1 ) t h e n c e N o r t h 7 4 d e g r e e s 1 8 m i n u t e s 4 9 s e c o n d s E a s t , 6 1 . 0 0 f e e t ; 1 2 ) t h e n c e N o r t h 1 5 de g r e e s 4 1 m i n u t e s 1 1 s e c o n d s W e s t , 2 7 7 . 0 0 f e e t ; 1 3 ) t h e n c e N o r t h 7 4 d e g r e e s 1 8 m i n u t e s 4 9 s e c o n d s E a s t , 1 4 5 . 6 3 f e e t ; 1 4 ) t h e n c e N o r t h 1 5 de g r e e s 4 1 m i n u t e s 1 1 s e c o n d s W e s t , 2 2 7 . 5 8 f e e t ; 1 5 ) t h e n c e N o r t h 7 4 d e g r e e s 1 8 m i n u t e s 4 9 s e c o n d s E a s t , 1 2 5 . 6 3 f e e t ; 1 6 ) t h e n c e no r t h e a s t e r l y 3 9 . 4 9 f e e t o n a n o n - t a n g e n t i a l c u r v e , c o n c a v e t o t h e n o r t h w e s t , h a v i n g a r a d i u s o f 2 5 . 0 0 f e e t , a c e n t r a l a n g l e o f 9 0 d e g r e e s 3 0 mi n u t e s 1 8 s e c o n d s , a n d a c h o r d b e a r i n g a n d d i s t a n c e o f N o r t h 2 9 d e g r e e s 0 3 m i n u t e s 4 0 s e c o n d s E a s t , 3 5 . 5 1 f e e t t o s a i d w e s t e r l y l i n e o f L a k e Bu t t e D e s M o r t s D r i v e ; t h e n c e N o r t h 1 6 d e g r e e s 1 1 m i n u t e s 2 9 s e c o n d s W e s t o n s a i d w e s t e r l y l i n e , 5 3 5 . 6 6 f e e t ; t h e n c e N o r t h 0 6 d e g r e e s 1 8 mi n u t e s 4 3 s e c o n d s W e s t o n s a i d w e s t e r l y l i n e , 1 0 6 . 8 7 f e e t t o t h e p o i n t o f b e g i n n i n g . OB J E C T I N G A U T H O R I T I E S : De p a r t m e n t o f A d m i n i s t r a t i o n AP P R O V I N G A U T H O R I T I E S : Ci t y o f O s h k o s h OW N E R S / D E V E L O P E R S : Re d E a r t h , L L C SU R V E Y O R : IS G 20 1 M a i n S t r e e t , S t e . 1 0 2 0 La C r o s s e , W I 5 4 6 0 1 (6 0 8 ) - 7 8 9 - 2 0 3 4 EX I S T I N G P R O P E R T Y : (P e r C i t y o f O s h k o s h G I S W e b s i t e ) ZO N E D : NM U - P D ( N e i g h b o r h o o d M i x e d U s e P l a n n e d D e v e l o p m e n t ) BE A R I N G N O T E : Th e o r i e n t a t i o n o f t h i s b e a r i n g s y s t e m i s b a s e d o n t h e n o r t h l i n e o f t h e NW 1 / 4 o f S e c . 3 , T w p . 1 8 N , R g e . 8 1 6 E . S a i d l i n e b e a r s N o r t h 8 9 d e g r e e s 2 6 m i n u t e s 2 0 s e c o n d s E a s t . 20 2 4 - 0 1 - 0 5 1 O F 2 Page 11 C7 G FO G G G << << << << << << << << << << << << O H L OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL G G G G G G G G G G G G G G OHL OHL G G G G G G S15°41'1 1 " E 1 5 4 . 5 4 C 1 4 62. 4 6 S2 9 ° 1 8 ' 4 9 " W C11 C 1 6 N7 4 ° 1 8 ' 4 9 " E 2 0 9 . 4 6 L 1 0 1 7 8 . 0 0 C 1 6 S 7 4 ° 1 8 ' 4 9 " W 3 1 7 . 6 3 C8 N06°39'21"W 482.2 2 C9 101.12 L 4 L5 L 6 L7L 8L9 N 7 4 ° 1 8 ' 4 9 " E 2 0 9 . 4 6 1 6 8 . 8 4 C 1 3 C5 110.49 N06°39'21"W 482 . 2 2 C10 38.48 C12 S15°41'1 1 " E 1 5 4 . 5 4 S 7 4 ° 1 8 ' 4 9 " W 3 1 7 . 6 3 C6 116.06 C 1 5 N 7 4 ° 1 8 ' 4 9 " E 1 7 8 . 0 0 S7 4 ° 1 8 ' 4 9 " W 2 9 8 . 8 1 371.73 L 2 C3 L1 C2 C1 L 1 2 1 2 3 4 5 6 7 8 53.42 305.51 176.71 L3 N15°41'11 " W 2 0 5 . 4 0 C4 L11 N15°41'1 1 " W 1 6 7 . 5 8 62. 4 6 N2 9 ° 1 8 ' 4 9 " E 37' Concrete R o a d WET WE T WET WET WET WET WET WET WET WET WET CU R V E T A B L E CU R V E # C1 C2 C3 C4 C5 C6 C7 C8 C9 C1 0 C1 1 C1 2 C1 3 C1 4 C1 5 C1 6 LE N G T H 37 . 5 1 ' 28 . 8 7 ' 47 . 6 9 ' 39 . 4 9 ' 22 4 . 6 9 ' 3. 8 5 ' 22 0 . 8 5 ' 12 0 . 9 9 ' 39 . 4 0 ' 29 . 9 5 ' 10 2 . 1 0 ' 54 . 9 8 ' 54 . 9 8 ' 10 2 . 1 0 ' 80 . 8 5 ' 21 . 2 5 ' RA D I U S 25 . 0 0 ' 23 0 . 0 0 ' 22 0 . 0 0 ' 25 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' 70 . 0 0 ' 25 0 . 0 0 ' 19 0 . 0 0 ' 13 0 . 0 0 ' 70 . 0 0 ' 70 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' 13 0 . 0 0 ' DE L T A 85 ° 5 7 ' 5 0 " 7° 1 1 ' 3 5 " 12 ° 2 5 ' 1 0 " 90 ° 3 0 ' 1 8 " 99 ° 0 1 ' 4 9 " 1° 4 1 ' 4 3 " 97 ° 2 0 ' 0 6 " 99 ° 0 1 ' 4 9 " 9° 0 1 ' 4 9 " 9° 0 1 ' 4 9 " 45 ° 0 0 ' 0 0 " 45 ° 0 0 ' 0 0 " 45 ° 0 0 ' 0 0 " 45 ° 0 0 ' 0 0 " 35 ° 3 8 ' 0 5 " 9° 2 1 ' 5 5 " CH O R D B E A R I N G N5 7 ° 2 8 ' 4 0 " W S8 3 ° 0 8 ' 1 2 " W S8 0 ° 3 1 ' 2 4 " W N2 9 ° 0 3 ' 4 0 " E N5 6 ° 1 0 ' 1 6 " W S7 5 ° 0 9 ' 4 1 " W S5 5 ° 1 9 ' 2 4 " E N5 6 ° 1 0 ' 1 6 " W N1 1 ° 1 0 ' 1 6 " W N1 1 ° 1 0 ' 1 6 " W S6 ° 4 8 ' 4 9 " W S6 ° 4 8 ' 4 9 " W N5 1 ° 4 8 ' 4 9 " E S5 1 ° 4 8 ' 4 9 " W S4 7 ° 0 7 ' 5 2 " W S6 9 ° 3 7 ' 5 2 " W CH O R D L E N G T H 34 . 0 9 ' 28 . 8 6 ' 47 . 5 9 ' 35 . 5 1 ' 19 7 . 7 5 ' 3. 8 5 ' 19 5 . 2 3 ' 10 6 . 4 8 ' 39 . 3 6 ' 29 . 9 1 ' 99 . 5 0 ' 53 . 5 8 ' 53 . 5 8 ' 99 . 5 0 ' 79 . 5 6 ' 21 . 2 3 ' TA N G E N T I N N1 4 ° 2 9 ' 4 5 " W S7 9 ° 3 2 ' 2 5 " W S8 6 ° 4 3 ' 5 9 " W N1 6 ° 1 1 ' 2 9 " W N7 4 ° 1 8 ' 4 9 " E N7 4 ° 1 8 ' 4 9 " E S6 ° 3 9 ' 2 1 " E S7 4 ° 1 8 ' 4 9 " W N6 ° 3 9 ' 2 1 " W S6 ° 3 9 ' 2 1 " E S2 9 ° 1 8 ' 4 9 " W N2 9 ° 1 8 ' 4 9 " E N2 9 ° 1 8 ' 4 9 " E S7 4 ° 1 8 ' 4 9 " W S6 4 ° 5 6 ' 5 5 " W S7 4 ° 1 8 ' 4 9 " W TA N G E N T O U T S7 9 ° 3 2 ' 2 5 " W S8 6 ° 4 3 ' 5 9 " W S7 4 ° 1 8 ' 4 9 " W N7 4 ° 1 8 ' 4 9 " E S6 ° 3 9 ' 2 1 " E N7 6 ° 0 0 ' 3 3 " E N7 6 ° 0 0 ' 3 3 " E N6 ° 3 9 ' 2 1 " W N1 5 ° 4 1 ' 1 1 " W S1 5 ° 4 1 ' 1 1 " E S1 5 ° 4 1 ' 1 1 " E N1 5 ° 4 1 ' 1 1 " W N7 4 ° 1 8 ' 4 9 " E S2 9 ° 1 8 ' 4 9 " W S2 9 ° 1 8 ' 4 9 " W S6 4 ° 5 6 ' 5 5 " W LI N E T A B L E LI N E # L1 L2 L3 L4 L5 L6 L7 L8 L9 L1 0 L1 1 L1 2 LE N G T H 13 . 4 4 6. 2 9 26 5 . 4 0 60 . 2 2 50 . 1 1 13 0 . 7 5 16 5 . 0 8 61 . 0 0 27 7 . 0 0 14 5 . 6 3 22 7 . 5 8 12 5 . 6 3 DI R E C T I O N S8 6 ° 4 3 ' 5 9 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W N7 4 ° 1 8 ' 4 9 " E N1 5 ° 4 1 ' 1 1 " W S7 4 ° 1 8 ' 4 9 " W N1 5 ° 4 1 ' 1 1 " W N7 4 ° 1 8 ' 4 9 " E 27 5 8 4 P P L A T DA T E RE V I S I O N S C H E D U L E DE S C R I P T I O N BY SH E E T TI T L E PR O J E C T WI T H O U T P R I O R W R I T T E N C O N S E N T . IN C . A N D M A Y N O T B E U S E D , C O P I E D O R D U P L I C A T E D TH I S D O C U M E N T I S T H E P R O P E R T Y O F I & S G R O U P , PR O J E C T N O . FI L E N A M E DE S I G N E D B Y OR I G I N A L I S S U E D A T E DR A W N B Y CL I E N T P R O J E C T N O . RE V I E W E D B Y FILE LOCATION: S:\PROJECTS\27000 PROJ\27500-27599\27584 LAKE BUTTE DES MORTS DEVELOPME-OSHKOSH WI\27584 PRODUCTION FILES\27584 CIVIL 3D\SURVEY PRODUCTION DWGS\27584 PPLAT.DWG 2 O F 2 22 - 2 7 5 8 4 ## # # # ## # # # # # # # # # ### ### # # # # # # # # # # # # # # # ### # # OS H K O S H WI S C O N S I N PR E L I M I N A R Y PL A T 0 SC A L E I N F E E T 60 12 0 JR O LA K E B U T T E D E S MO R T S DE V E L O P M E N T SE C . 3 , T W P . 1 8 N , R G E . 1 6 E VI C I N I T Y M A P (N O T T O S C A L E ) Wi n n e b a g o C o u n t y , W i s c o n s i n NW 1/4 SE 1/4 S W 1 / 4 NE 1/4 Lake Butte D e s M o r t s D r 3 "L A K E B U T T E D E S M O R T S D E V E L O P M E N T " Lo c a t e d i n t h e N W 1 / 4 o f t h e N W 1 / 4 a n d t h e S E 1 / 4 o f t h e N W 1 / 4 a n d t h e S W 1 / 4 o f t h e N W 1 / 4 a n d t h e N E 1 / 4 o f t h e S W 1 / 4 a n d t h e N W 1 / 4 o f t h e S W 1 / 4 o f S e c t i o n 3 , To w n s h i p 1 8 N o r t h , R a n g e 1 6 E a s t , C i t y o f O s h k o s h , W i n n e b a g o C o u n t y , W i s c o n s i n . 20 2 4 - 0 1 - 0 5 Page 12 Page 13 Page 14 Page 15