Loading...
HomeMy WebLinkAbout23-05 CO #1_2-8-24TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER #1 P.O. BOX 137 TWO RIVERS, WI 54241 Your present contract with the City of Oshkosh, Contract No. 23-05, awarded April 25, 2023, is hereby amended and changed as follows: NET INCREASE TO SECTION I: $12,331.69 NET INCREASE TO ADDITIONAL WORK:$3,360.00 NET INCREASE TO CONTRACT $15,691.69 SECTION I TOTALS BID TOTAL $331,569.18 $331,569.18 CO #1 $15,691.69 $15,691.69 CONTRACT TOTAL $347,260.87 $347,260.87 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: FEBRUARY 8, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ DocuSign Envelope ID: 4941530C-8DD1-48DB-A591-910C5CF27BFA CONTRACT 23-05 CHANGE ORDER #1 23-05 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1010 Clearing; complete as specified Stations 6.00 6.00 $350.00 1011 Clearing; complete as specified Inch Diameter 36.00 36.00 $25.00 1020 Grubbing; complete as specified Stations 6.00 6.00 $350.00 1021 Grubbing; complete as specified Inch Diameter 36.00 36.00 $20.00 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $23,500.00 1200 Unclassified excavation; complete as specified Cubic Yards 1,850.00 1,584.27 -265.73 $27.20 ($7,227.86) 1202 Strip and stockpile topsoil; complete as specified Lump Sum 1.00 1.00 $2,500.00 1210 Borrow excavation; complete as specified Cubic Yards 35.00 0.00 -35.00 $0.01 ($0.35) 1220 Excavation special (paving); complete as specified Tons 150.00 329.57 179.57 $0.01 $1.80 1370 Turf restoration; complete as specified Square Yards 5,250.00 9,153.60 3903.60 $10.19 $39,777.68 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 375.00 333.38 -41.62 $13.05 ($543.14) 1441 30" curb and gutter; plain; 7"; with 5" CABC and grading; complete as specified Linear Feet 375.00 333.38 -41.62 $32.50 ($1,352.65) 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 2,750.00 2,720.39 -29.61 $7.65 ($226.52) 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 325.00 352.30 27.30 $8.55 $233.42 1540 Curb ramp detectable warning field (natural/ non-painted); complete as specified Square Feet 20.00 20.00 $40.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 450.00 0.00 -450.00 $0.01 ($4.50) 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 450.00 0.00 -450.00 $0.01 ($4.50) 1590 Up-charge for late cold weather concrete sidewalk; complete as specified Cubic Yards 10.00 0.00 -10.00 $0.01 ($0.10) Page 2 of 4 DocuSign Envelope ID: 4941530C-8DD1-48DB-A591-910C5CF27BFA CONTRACT 23-05 CHANGE ORDER #1 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1650 Locate existing property monuments; complete as specified Each 4.00 12.00 8.00 $250.00 $2,000.00 1652 Replace existing property monuments; complete as specified Each 4.00 4.00 $50.00 1801 Base aggregate dense; 1- 1/4"; complete as specified Tons 1,050.00 1,470.00 420.00 $16.70 $7,014.00 1802 Base aggregate dense; 3"; complete as specified Tons 1,200.00 819.00 -381.00 $11.93 ($4,545.33) 1900 Tack coat; complete as specified Gallons 215.00 30.00 -185.00 $3.64 ($673.40) 1901 HMA Pavement LT; complete as specified Tons 775.00 703.04 -71.96 $89.08 ($6,410.20) 1903 HMA cold weather paving; complete as specified Tons 115.00 36.11 -78.89 $97.67 ($7,705.19) 1960 Prepare foundation for asphaltic paving; complete as specified Lump Sum 1.00 1.00 $11,392.80 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 575.00 476.67 -98.33 $6.50 ($639.15) 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 2.00 2.00 $150.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 85.00 0.00 -85.00 $0.01 ($0.85) 2004 Furnish and install 12" RCP Class III storm sewer; complete as specified Linear Feet 30.00 25.00 -5.00 $82.00 ($410.00) 2140 Furnish and install 12" RCP Class III apron endwall with joint ties; complete as specified Each 2.00 2.00 $1,420.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 10.00 6.00 -4.00 $108.28 ($433.12) 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 10.00 6.00 -4.00 $12.02 ($48.08) 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 3.00 2.00 -1.00 $0.01 ($0.01) 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 3,500.00 3,325.06 -174.94 $2.12 ($370.87) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 10.00 8.00 -2.00 $15.60 ($31.20) Page 3 of 4 DocuSign Envelope ID: 4941530C-8DD1-48DB-A591-910C5CF27BFA CONTRACT 23-05 CHANGE ORDER #1 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 700.00 0.00 -700.00 $5.13 ($3,591.00) 2522 Furnish; install; maintain; and remove ditch check; complete as specified Each 15.00 6.00 -9.00 $163.22 ($1,468.98) 2638 Furnish and install turf reinforcement mat system; complete as specified Square Yards 430.00 430.00 $6.10 2648 Furnish and install medium rip-rap with filter fabric; complete as specified Square Yards 15.00 12.84 -2.16 $73.20 ($158.11) 2914 Storm sewer utility line opening (ULO); complete as specified Each 1.00 0.00 -1.00 $850.00 ($850.00) 2950 Excavation special (storm); complete as specified Tons 10.00 0.00 -10.00 $0.01 ($0.10) SECTION I (BID ITEMS 1010 - 2950) - SUBTOTAL: $49,026.90 ($36,695.21) NET INCREASE TO SECTION I: $12,331.69 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10001 Petroleum tank cleaning and disposal; complete as specified. Each 0.00 1.00 1.00 $3,360.00 $3,360.00 $3,360.00 $0.00 $3,360.00 NET INCREASE TO SECTION I:$12,331.69 $3,360.00 NET INCREASE TO CONTRACT:$15,691.69 ADDITIONAL WORK REQUIRED: CO #1 NET INCREASE TO ADDITIONAL WORK: NET INCREASE: ADDITIONAL WORK REQUIRED: CO #1 SUBTOTAL: Page 4 of 4 DocuSign Envelope ID: 4941530C-8DD1-48DB-A591-910C5CF27BFA