Loading...
HomeMy WebLinkAbout0108832 PCITY OF OSHKOSH 108832 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address2772 OREGON STOwnerOshkosh Truck Credit UnionCreate Date06/21/2004 ContractorATOMIC PLUMBINGCategoryPlan 440 - Industrial-Interior Bathtub0Shower0Ejector/Grind1Dip Well0F Prep Sink0Gar Drain0 Whirlpool0Floor Drain1Water Softner0Drink Ftn1Serv Sink10 Soda Disp Lavatory20Local Waste0Wait. St.0Shamp Sink00 Lndry TrayCoffee Maker Toilet20Clothes Wshr0Ice Chest0Flr/Wst Sink0 0 Lndry Stndp Int Grease Trap Res. Sink11Bidet0Exam Sink0Catch Basin0 Disposal0 Ext Grease Trap Bar Sink100Wash Ftn0 Beer Tap0Sculry Sink Dishwasher RPZ Valve0 Water Heater110Urinal0 Sump PumpDent. Oper.0Hand Sink 0 Eye Wash Statn Site Drain000Standp Rec1 Classrm SinkLab Sink0Plaster Sink Roof Drain000Ice Maker0 Breakrm SinkSterilizer0Surgeons Sink Use/Nature NEW OFFICE of Work SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 $0.00Permit Voided Valuation$8,600.00Plan ApprovalPermit Fees$98.00 Issued ByDate06/21/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressPO BOX 388RIPONWI54971-0000Telephone Number748-5359 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.