HomeMy WebLinkAbout2004-Building (alterations)OSHKOSH
ON THE WATER
.lob.Address 375WESTBROOK DR
Designer
Category 111 - Single Family Addition
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner
Contractor GARRY H DECKER & CO LLC
No 108792
Create Date 05/14/2004
Plan
Type IO Building {~ Sign {~ Canopy {~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
CONDO ALTERATIONS TO PERMIT # 107397 / LATE PERMIT/Constructing a 15'x20' rear sunroom addition with a walkout basement. The
attached garage is also 1.5' wider than the original plan submittal. There will be a bedroom finished in the basement and a 15'xl 8' deck will be
constructed off the sunroom. A patio will be installed under this deck area due to walkout basement.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$1.00 Plan Approval $75.00 Permit Fee Paid
Permit Voided
$14.00 Park Dedication $0.00
Date 08/18/2004 Final/O.P. 00/00/0000
Parcel Id # 1616580000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1113 OREGON ST OSHKOSH WI 54902 - 6484 Telephone Number 235-8035
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.