Loading...
HomeMy WebLinkAbout2004-Building (alterations)OSHKOSH ON THE WATER .lob.Address 375WESTBROOK DR Designer Category 111 - Single Family Addition CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner Contractor GARRY H DECKER & CO LLC No 108792 Create Date 05/14/2004 Plan Type IO Building {~ Sign {~ Canopy {~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work CONDO ALTERATIONS TO PERMIT # 107397 / LATE PERMIT/Constructing a 15'x20' rear sunroom addition with a walkout basement. The attached garage is also 1.5' wider than the original plan submittal. There will be a bedroom finished in the basement and a 15'xl 8' deck will be constructed off the sunroom. A patio will be installed under this deck area due to walkout basement. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1.00 Plan Approval $75.00 Permit Fee Paid Permit Voided $14.00 Park Dedication $0.00 Date 08/18/2004 Final/O.P. 00/00/0000 Parcel Id # 1616580000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1113 OREGON ST OSHKOSH WI 54902 - 6484 Telephone Number 235-8035 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.