Loading...
HomeMy WebLinkAbout0108761-Building (siding)OSHKOSH ON THE WATER .lob ,Address 1430 W 9TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MELVIN/CAROL DISCHER LIFE EST Contractor SALZER SIDING Category 141 - Exterior Remodeling No 108761 Create Date 06/15/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Replacing wood siding on the house with vinyl, soffit and fascia wrap windows. No structural work. Seckar Electric is responsible for the of Work electrical work. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $8,600.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $68.00 Park Dedication $0.00 Date 06/16/2004 Final/O.P. 00/00/0000 Parcel Id # 0608600200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 825 OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.