Loading...
HomeMy WebLinkAbout0108691-Building (foundation only)OSHKOSH ON THE WATER .lob Address 4585 SHAMBEAU DR Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JAY J/JENNIFER R SCHRAUFNAGEL Contractor K D GEHRT CONSTRUCTION LLC Category 112 - Foundation Permit Single Family No 108691 Create Date 06/09/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning R-1 Class of Const: Size Irrg Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature NSFR/EARLY START/Footing and Foundation Only. Work shall not procede above the foundation. A seperate permit is required for for any of Work building above the foundation. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $10,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $149.00 Park Dedication $0.00 Date 06/14/2004 Final/O.P. 00/00/0000 Parcel Id # 1560100400 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 983 DEERFIELD CT MENASHA WI 54952 - 0000 Telephone Number 920-725-2774 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.