HomeMy WebLinkAbout22-13 CO #1 (Final)_2-13-24TO: PTS CONTRACTORS CHANGE ORDER #1 (FINAL) 4075 EATON ROAD GREEN BAY, WI 54311 Your present contract with the City of Oshkosh, Contract No. 22-13, awarded March 22, 2022, is hereby amended and changed as follows: ($173,739.50) $53,282.77 ($120,456.73) SECTION I TOTALS BID TOTAL $938,660.00 $938,660.00 CO #1 ($120,456.73)($120,456.73) CONTRACT TOTAL $818,203.27 $818,203.27 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: FEBRUARY 13, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ NET DECREASE TO SECTION I: NET INCREASE TO ADDITIONAL WORK: NET DECREASE TO CONTRACT: DocuSign Envelope ID: D5D96264-8E1E-40F3-B389-D7266C6AFAF9 CONTRACT 22-13 CHANGE ORDER #1 (FINAL) 22-13 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $52,921.30 1100 Removing pavement; complete as specified Square Yards 5,765.00 4,439.50 -1,325.50 $1.15 ($1,524.33) 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 1,476.00 1,226.00 -250.00 $0.65 ($162.50) 1200 Unclassified excavation; complete as specified Cubic Yards 380.00 258.00 -122.00 $19.80 ($2,415.60) 1205 Unclassified excavation (sidewalk); complete as specified Cubic Yards 270.00 517.00 247.00 $29.50 $7,286.50 1230 Ground stabilization fabric; complete as specified Square Yards 1,145.00 0.00 -1,145.00 $2.05 ($2,347.25) 1328 9" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 5,023.00 3,766.89 -1,256.11 $59.15 ($74,298.91) 1329 9" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 272.00 255.83 -16.17 $89.65 ($1,449.64) 1360 Adjust manholes and inlets; complete as specified Each 11.00 8.00 -3.00 $310.00 ($930.00) 1370 Turf restoration; complete as specified Square Yards 891.00 1,932.17 1041.17 $8.25 $8,589.65 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 6,870.00 6,335.00 -535.00 $6.75 ($3,611.25) 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 701.00 1,142.00 441.00 $7.20 $3,175.20 1540 Curb ramp detectable warning field (natural/non- painted); complete as specified Square Feet 40.00 40.00 $41.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 108.00 60.00 -48.00 $3.10 ($148.80) Page 2 of 7 DocuSign Envelope ID: D5D96264-8E1E-40F3-B389-D7266C6AFAF9 CONTRACT 22-13 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 16.00 42.00 26.00 $10.30 $267.80 1570 Turf restoration (sidewalk); complete as specified Square Yards 1,524.00 1,524.00 $8.25 1650 Locate existing property monuments; complete as specified Each 7.00 5.00 -2.00 $155.00 ($310.00) 1652 Replace existing property monuments; complete as specified Each 7.00 2.00 -5.00 $51.00 ($255.00) 1700 Sawing existing pavement; complete as specified Linear Feet 4,627.00 3,915.00 -712.00 $2.00 ($1,424.00) 1800 Base aggregate dense; 3/4"; complete as specified Tons 15.00 20.48 5.48 $61.75 $338.39 1801 Base aggregate dense; 1- 1/4"; complete as specified Tons 261.00 0.00 -261.00 $12.35 ($3,223.35) 1810 Breaker run; complete as specified Tons 684.00 0.00 -684.00 $12.35 ($8,447.40) 1900 Tack coat; complete as specified Gallons 33.00 0.00 -33.00 $2.60 ($85.80) 1906 4" asphaltic pavement LT with 10" CABC and grading; complete as specified Square Yards 470.00 494.33 24.33 $41.60 $1,012.14 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 960.00 750.00 -210.00 $1.20 ($252.00) 1975 Pavement markings; epoxy; 4" (yellow); complete as specified Linear Feet 3,700.00 3,693.00 -7.00 $1.20 ($8.40) 1977 Pavement markings; cross- walk epoxy; 6" (white); complete as specified Linear Feet 88.00 245.00 157.00 $8.50 $1,334.50 1978 Pavement markings; stop-line epoxy; 18" (white); complete as specified Linear Feet 22.00 54.00 32.00 $13.00 $416.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 80.00 80.00 $60.00 2200 Furnish and install standard storm sewer manhole (2' diameter); complete as specified Vertical Feet 3.90 3.41 -0.49 $535.00 ($262.15) 2506 Furnish; install; maintain; and remove Type D inlet protection; complete as specified Each 19.00 12.00 -7.00 $72.00 ($504.00) 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 0.00 -2.00 $1.00 ($2.00) Page 3 of 7 DocuSign Envelope ID: D5D96264-8E1E-40F3-B389-D7266C6AFAF9 CONTRACT 22-13 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 227.00 0.00 -227.00 $3.00 ($681.00) 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 591.00 122.00 -469.00 $70.00 ($32,830.00) 3008 Furnish and install 18" sanitary sewer (relay); complete as specified Linear Feet 1,617.00 1,551.00 -66.00 $145.00 ($9,570.00) 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 124.94 89.20 -35.74 $255.00 ($9,113.70) 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 11.00 7.00 -4.00 $565.00 ($2,260.00) 3208 Furnish and install 18" x 4" sanitary sewer factory wyes or tees; complete as specified Each 2.00 0.00 -2.00 $210.00 ($420.00) 3218 Furnish and install 18" x 6" sanitary sewer factory wyes or tees; complete as specified Each 2.00 1.00 -1.00 $230.00 ($230.00) 3230 Furnish and install 4" sanitary sewer laterals (new); complete as specified Linear Feet 46.00 0.00 -46.00 $100.00 ($4,600.00) 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 15.00 3.00 -12.00 $115.00 ($1,380.00) 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 5.00 1.00 -4.00 $38.00 ($152.00) 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 4.00 2.00 -2.00 $1,140.00 ($2,280.00) 3308 Furnish and install connection to existing 18" sanitary sewer mains; complete as specified Each 2.00 1.00 -1.00 $3,035.00 ($3,035.00) 3700 Closed circuit televising; complete as specified Linear Feet 2,205.00 1,673.00 -532.00 $1.80 ($957.60) 3801 Abandon 6" sanitary sewer; complete as specified Linear Feet 149.00 31.00 -118.00 $29.00 ($3,422.00) 3802 Abandon 8" sanitary sewer; complete as specified Linear Feet 90.00 27.00 -63.00 $16.00 ($1,008.00) 3810 Abandon 18" sanitary sewer; complete as specified Linear Feet 584.00 0.00 -584.00 $11.00 ($6,424.00) Page 4 of 7 DocuSign Envelope ID: D5D96264-8E1E-40F3-B389-D7266C6AFAF9 CONTRACT 22-13 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3854 Remove sanitary sewer; complete as specified Linear Feet 30.00 0.00 -30.00 $41.00 ($1,230.00) 3860 Abandon 4" sanitary sewer; complete as specified Linear Feet 31.00 0.00 -31.00 $47.00 ($1,457.00) 4021 Furnish and install new 6" ductile iron water main with polywrap and TR Flex restrained joints; complete as specified Linear Feet 9.00 8.50 -0.50 $132.00 ($66.00) 4023 Furnish and install new 8" ductile iron water main with polywrap and TR Flex restrained joints; complete as specified Linear Feet 300.00 294.00 -6.00 $103.00 ($618.00) 4044 Furnish and install 1-1/2" water service (new); complete as specified Linear Feet 82.00 0.00 -82.00 $111.00 ($9,102.00) 4051 Furnish and install 1-1/2" corporation and stop box; complete as specified Each 3.00 0.00 -3.00 $1,220.00 ($3,660.00) 4055 Furnish and install water service clay dams; complete as specified Each 3.00 3.00 $28.00 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 1.00 1.00 $635.00 4255 Furnish and install 8" water main cap; complete as specified Each 1.00 1.00 $245.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 1.00 1.00 $1,695.00 4500 Furnish and install hydrant; complete as specified Each 1.00 1.00 $5,145.00 4950 Water main utility line opening (ULO); complete as specified Each 1.00 0.00 -1.00 $1.00 ($1.00) SECTION I (BID ITEMS 1011 - 4990) - SUBTOTAL: $22,420.18 ($196,159.68) NET DECREASE TO SECTION I: ($173,739.50) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-1500 Jim Fischer revised pricing; 4" concrete sidewalk with 3" CABC and grading; complete as specified Each 0.00 6,335.00 6335.00 $0.82 $5,194.70 ADDITIONAL WORK REQUIRED CO #1 Page 5 of 7 DocuSign Envelope ID: D5D96264-8E1E-40F3-B389-D7266C6AFAF9 CONTRACT 22-13 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-1510 Jim Fischer revised pricing; 6" concrete sidewalk /driveway/ramp with 3" CABC and grading; complete as specified Each 0.00 1,142.00 1142.00 $0.85 $970.70 1-1540 Jim Fischer revised pricing; curb ramp detectable warning field (natural/non-painted); complete as specified Each 0.00 40.00 40.00 $1.00 $40.00 1-1550 No. 4 reinforcing rods - deformed; expoxy-coated; complete as specified Each 0.00 16.00 16.00 $0.15 $2.40 1-1560 Jim Fischer revised pricing; drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 0.00 42.00 42.00 $0.00 $0.00 1-4042 Furnish and install 1" water service (new); complete as specified Linear Feet 0.00 77.00 77.00 $89.00 $6,853.00 1-4048 Furnish and install 1" corporation and stop box; complete as specified Each 0.00 3.00 3.00 $630.00 $1,890.00 1-30000 Remove and dispose 23 loads of wood chips; complete as specified Lump Sum 0.00 1.00 1.00 $4,600.00 $4,600.00 1-30001 Trucking wood chips; complete as specified Each 0.00 23.00 23.00 $120.00 $2,760.00 1-30002 Loader and operator to handle chips; complete as specified Lump Sum 0.00 1.00 1.00 $384.00 $384.00 1-30003 PTS labor adjustment for 2023; complete as specified Lump Sum 0.00 1.00 1.00 $3,784.00 $3,784.00 1-30004 Stone price adjustment for 2023; complete as specified Ton 0.00 8,537.50 8537.50 $0.85 $7,256.88 1-30005 Dispose of manhole bases that were no longer needed due to plan changes; complete as specified Lump Sum 0.00 1.00 1.00 $3,564.91 $3,564.91 1-30006 NEA labor adjustments for 2023; complete as specified Lump Sum 0.00 1.00 1.00 $1,035.00 $1,035.00 1-30007 Vinton extra material and labor costs for 2023 construction; complete as specified Square Yards 0.00 4,022.72 4022.72 $2.17 $8,729.30 1-30008 Place wood chips; revised from $5758.12 to $2962.88 after first meeting; complete as specified Lump Sum 0.00 1.00 1.00 $2,962.88 $2,962.88 Page 6 of 7 DocuSign Envelope ID: D5D96264-8E1E-40F3-B389-D7266C6AFAF9 CONTRACT 22-13 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-40000 8" watermain connection item; complete as specified Lump Sum 0.00 1.00 1.00 $3,255.00 $3,255.00 $53,282.77 $0.00 $53,282.77 ($173,739.50) $53,282.77 ($120,456.73)NET DECREASE TO CONTRACT: ADD'L WORK (BID ITEMS 1-1500 - 1- 40000) - SUBTOTAL: NET INCREASE TO ADD'L WORK: NET DECREASE TO SECTION I: NET INCREASE TO ADDITIONAL WORK: Page 7 of 7 DocuSign Envelope ID: D5D96264-8E1E-40F3-B389-D7266C6AFAF9