HomeMy WebLinkAbout0108810-BuildingOSHKOSH
ON THE WATER
.lob.Address 403 E NEW YORKAVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner DAVID M/ROXANNE LEMIEUX
Contractor OWNER
Category 140 - Interior Remodeling
No 108810
Create Date 06/21/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature CONVERSION TO SINGLE FAMILY/Installing partion walls and a loft area to create a single family home. All loads are required to properly
of Work lransfer to the foundation.
HVAC Contractor ANDRESEN SHEET METAL Plumbing Contractor KOCH PLUMBING
Electric Contractor CUMINGS ELECTRIC INC
Fees: Valuation $14,000.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00
Issued By: Date 06/21/2004 Final/O.P. 00/00/0000
Permit Voided
Parcel Id # 1008570000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 702 DOVE ST
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.