HomeMy WebLinkAbout0108696 POSHKOSH
ON THE WATER
.lob Address 1174 HIGH AVE
Contractor AG MECHANICAL
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 2
Site Drain 0
Roof Drain 0
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ALL AMERICAN INVESTMENTS LLC
Category 441 - Industrial-Water Heaters
No 108696
Create Date 06/15/2004
Plan
Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
8 UNIT APT BLDG
REPLACE NG WTR HTRS DUE TO WATER DAMAGE 1-40 GAL 1-50 GAL
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $800.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Parcel Id #
0507170000
Date 06/15/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1939 CTY RD GG NEENAH WI 54956 - 0000 Telephone Number
920-751-0884
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.