Loading...
HomeMy WebLinkAbout0108640-Plumbing (repair sanitary sewer lateral)OSHKOSH ON THE WATER .lob Address 1005 E NEW YORKAVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner HOWARD C M JONES/GABRIELE EHRES Category 401 - Residential-Exterior (laterals) No 108640 Create Date 11/06/2003 Plan Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Whirlpool 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 0 Lndry Tray 0 LocalWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Toilet 0 Lndry Stndp 0 ClothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature RELAY SANITARY SEWER LATERAL FROM SIDEWALK TO HOUSE of Work Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 Relay 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $1,500.00 Plan Approval $0.00 Permit Fees $25.00 ~ Permit Voided Issued By Parcel Id # 1109890000 Date 06/11/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.