Loading...
HomeMy WebLinkAboutButte Des Morts AttachementsUS H W Y 4 1 W SNELL RD W FERNAU AVE L A K E B U T T E D E S M O R T S D R A L G O M A B L V D H W Y 4 5 27584 G1-GENERAL DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY FIL E L O C A T I O N : S:\ P R O J E C T S \ 2 7 0 0 0 P R O J \ 2 7 5 0 0 - 2 7 5 9 9 \ 2 7 5 8 4 L A K E B U T T E D E S M O R T S D E V E L O P M E - O S H K O S H W I \ 2 7 5 8 4 P R O D U C T I O N F I L E S \ 2 7 5 8 4 C I V I L 3 D \ P R O D U C T I O N D W G S \ P H A S E 2 - 6 S I P \ 2 7 5 8 4 G 1 - G E N E R A L . D W G LAKE BUTTE DES MORTES DEVELOPEMENT (PHASE 2-6) OSHKOSH, WISCONSIN PROJECT INDEX: OWNER: RED EARTH LLC 1310 WEST WISCONSIN STREET SPARTA, WI 54654 PH: 262.623.8348 PROJECT ADDRESS / LOCATION: SECTION 6 / TOWNSHIP 118N / RANGE 16 E WINNEBAGO TWP OSHKOSH, WISCONSIN PROJECT MANAGER: EMAIL: KRIS.ROPPE@ISGINC.COM RED EARTH LLC ISG PROJECT # 22-27584 PHASE 2 THRU 6 B.M. ELEVATION=761.61 IRON BAR IN CURB EAST SIDE LAKE BUTTE DES MORTES DRIVE APPROX. 140' NORTH OLIVER AVE INTERSECTION MANAGING OFFICE: DIGGERS HOTLINE Dial or (800)242-8511 www.DiggersHotline.com SPECIFICATIONS REFERENCE ALL CONSTRUCTION SHALL COMPLY WITH THE CITY OF OSHKOSH STANDARD SPECIFICATIONS, CURRENT EDITION, WISDOT STANDARD SPECIFICATIONS, 2023 EDITION, WISDOT CONSTRUCTION AND MATERIALS MANUAL, CURRENT EDITION, WISCONSIN DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICES STATE PLUMBING CODE, CURRENT EDITION, AND STANDARD SPECIFICATION FOR SEWER & WATER CONSTRUCTION IN WISCONSIN, 6th EDITION, UNLESS DIRECTED OTHERWISE. PROJECT DATUM HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), 2011 ADJUSTMENT (NAD83(2011)) ON THE WINNEBAGO COUNTY COORDINATE SYSTEM, IN U.S. SURVEY FEET. PROJECT GENERAL NOTES TOPOGRAPHIC SURVEY THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS OF DATA COLLECTED IN SEPTEMBER 2022 BY ISG. LEGEND EXISTING CITY LIMITS ACCESS CONTROL SECTION LINE QUARTER SECTION LINE RIGHT OF WAY LINE PROPERTY / LOTLINE EASEMENT LINE CULVERT WATER EDGEW WET WETLAND BOUNDARY WETLAND / MARSH WATER FENCE LINEXXXX UT STORM SEWER SANITARY SEWER> SANITARY SEWER FORCEMAIN<II CONTOUR (MAJOR) I UNDERGROUND TELEPHONE OVERHEAD ELECTRICOE UNDERGROUND ELECTRICUE UNDERGROUND TVUTV GASG FBO UNDERGROUND FIBER OPTIC CONTOUR (MINOR) DECIDUOUS TREE CONIFEROUS TREE TREE LINE MANHOLE/STRUCTURE CATCH BASIN HYDRANT CURB STOP VALVE UTILITY PEDESTAL / CABINET POWER POLE 990 989 PROPOSED CULVERT STORM SEWER SANITARY SEWER> WATERII OVERHEAD ELECTRICOE UNDERGROUND ELECTRICUE UNDERGROUND TVUTV GASG CONTOUR MANHOLE (STORM, SANITARY) CATCH BASIN HYDRANT VALVE EASEMENT RIGHT OF WAY >> >> >> >> STORM SEWER (PIPE WIDTH) 1015 LOT LINE SANITARY SEWER (PIPE WIDTH) OVERHEAD UTILITYOHL UNDERGROUND UTILITY UTL 0 SCALE IN FEET 1000 2000 ABBREVIATIONS: LOCATION MAP N S W E AC ACRE ADA AMERICANS WITH DISABILITIES ACT ADD ADDENDUM AFF ABOVE FINISHED FLOOR AGG AGGREGATE APPROXAPPROXIMATE ARCH ARCHITECT, ARCHITECTURAL BFE BASEMENT FLOOR ELEVATION BIT BITUMINOUS CAD COMPUTER-AIDED DESIGN CB CATCH BASIN CFS CUBIC FEET PER SECOND CF CUBIC FOOT CI CAST IRON CIP CAST IRON PIPE CIPC CAST IN PLACE CONCRETE CJ CONTROL JOINT CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEANOUT CONC CONCRETE CONST CONSTRUCTION CONT CONTINUOUS CY CUBIC YARD C&G CURB AND GUTTER DEMO DEMOLITION DIA DIAMETER DIM DIMENSION DS DOWNSPOUT EA EACH ELEC ELECTRICAL ELEV ELEVATION EOF EMERGENCY OVERFLOWEQEQUAL EX EXISTING FDC FIRE DEPARTMENT CONNECTION FDN FOUNDATION FES FLARED END SECTION FFE FINISHED FLOOR ELEVATION FPM FEET PER MINUTE FPS FEET PER SECOND FT FOOT, FEET FTG FOOTING GA GAUGE GAL GALLON GALV GALVANIZED GC GENERAL CONTRACTOR GFE GARAGE FLOOR ELEVATION GL GUTTER LINE GPM GALLONS PER MINUTE GV GATE VALVE HDPE HIGH DENSITY POLYETHYLENE HD HEAVY DUTY HH HANDHOLE HORIZ HORIZONTAL HR HOUR HWL HIGH WATER LEVEL HWY HIGHWAY HYD HYDRANT I INVERT ID INSIDE DIAMETER IN INCH INV INVERT IP IRON PIPE IPS IRON PIPE SIZE J-BOX JUNCTION BOX JT JOINT LF LINEAR FEET LIN LINEAR LPS LOW PRESSURE STEAM LS LUMP SUM LSO LOWEST STRUCTURAL OPENING MAX MAXIMUM MB MAIL BOX MECH MECHANICAL MH MANHOLE MIN MINIMUM MISC MISCELLANEOUS NO NUMBER NTS NOT TO SCALE NWL NORMAL WATER LEVEL OC ON CENTER OCEW ON CENTER EACH WAY OH OVERHEAD OHD OVERHEAD DOOR OZ OUNCE PED PEDESTAL, PEDESTRIAN PERF PERFORATED PL PROPERTY LINE PP POLYPROPYLENE PSI POUNDS PER SQUARE INCH PVC POLYVINYL CHLORIDE PVMT PAVEMENT QTY QUANTITY R RIM RAD RADIUS RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN REBAR REINFORCING BAR REM REMOVE ROW RIGHT OF WAY R/W RIGHT OF WAY SAN SANITARY SCH SCHEDULE SF SQUARE FOOT SPEC SPECIFICATION SQ SQUARE STA STATION SY SQUARE YARD T/C TOP OF CURB TEL TELEPHONE TEMP TEMPORARY THRU THROUGH TNFH TOP NUT OF FIRE HYDRANT TRANS TRANSFORMER TV TELEVISION T/W TOP OF WALL TYP TYPICAL UT UTILITY, UNDERGROUNDTELEPHONEVCPVITRIFIED CLAY PIPE W/O WITHOUT W/WITH YD YARD YR YEAR 1.ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS, AND CLARIFICATIONS ISSUED BY ARCHITECT/ENGINEER. 2.CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND COMPLETE COORDINATION OF ALL WORK. 3.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4.FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 5.DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 6.ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED, AND CONDITIONED ACCORDING TO MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 7.ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION. 8.THE LOCATION AND TYPE OF ALL EXISTING UTILITIES SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN. 9.THE CONTRACTOR IS TO CONTACT "DIGGERS HOTLINE" FOR UTILITY LOCATIONS A MINIMUM OF 3 BUSINESS DAYS PRIOR TO ANY EXCAVATION / CONSTRUCTION (811 OR 1-800-242-8511). - 01/22/2024 22-27584 G1-10 TITLE SHEET AND GENERAL INFORMATION ---- ---- G1-10 G1-10 SIP SUBMITTAL PLAN SET OSHKOSH WISCONSIN 201 MAIN STREET SUITE 1020 LA CROSSE, WI 54601 PHONE: 608.789.2034 LA CROSSE OFFICE TITLE SHEET AND GENERAL INFORMATION LMM /JRS LMM / JRS KBR / JRS LAKE BUTTE DES MORTS DEVELOPEMENT (PHASE 2-6) RED EARTH LLC PHASE 1 CIVIL SHEET INDEX Sheet Number Sheet Title G1-10 TITLE SHEET AND GENERAL INFORMATION G1-20 OVERALL SITE PHASING PLAN C0-20 - C0-29 TYPICAL STREET SECTION AND DETAILS C0-30 - C0-31 UTILITY SCHEDULES C1-10 - C1-40 EROSION CONTROL NOTES AND PLANS C2-10 EXISTING SITE AND REMOVAL PLAN (OVERALL) C3-10 -C3-15 SITE PLAN PLANS C3-20 - C3-25 SITE UTILITY PLAN (OVERALL) C3-30 HYDRANT COVERAGE PLAN C3-40 - C3-44 PLANNED STREET AND UTILITY CONSTRUCTION C3-50 - C3-53 UTILITY PROFILES C4-10 - C4-24 OVERALL GRADING PLAN (PHASE 2-6) C5-10 -C5-15 SITE RESTORATION PLAN C5-20 -C5-25BPLANTING PLANS C5-30 PLANTING DETAILS AND NOTES E6-10 - E6-16 SITE PHOTOMETRIC PLANS 75 ' R . O . W . G r a n t f o r G a s L i n e P u r p o s e s (p e r f i e l d m a r k i n g s b y u t i l i t y ) WET WET WE T WE T WET W E T WET WET WET WET WET WET WET WE T WE T WE T WET WE T W E T WE T FP100 F P 1 0 0 FP100 FP100 FP 1 0 0 F P 1 0 0 F P 1 0 0 FP 1 0 0 FP 1 0 0 FP 1 0 0 FP 1 0 0 FP100 FP 1 0 0 FP100 FP1 0 0 FP100 FP100 FP100 FP100 FP 1 0 0 FP100 FP100 FP100 FP 5 0 0 FP5 0 0 FP 5 0 0 FP 5 0 0 FP 5 0 0 FP 5 0 0 F P 5 0 0 F P 5 0 0 FP 5 0 0 FP 5 0 0 FP 5 0 0 FP5 0 0 CLUBHOUSE POOL DECK X X ELEC . M E T E R S GAS M E T E R S GAS M E T E R S ELEC . M E T E R S 40 UNIT BUILDING 32 UNDERGROUND STALLS4 STORY 40 UNIT BUILDING32 UNDERGROUND STALLS 4 STORY 4X 4X 4X 4X GM GM BLAIR BOULEVARD 13 7 6 8 7 8 7 4 4 4 UNIT TO W N H O U S E 4 UNIT TO W N H O U S E 4 UNIT TO W N H O U S E 4 UNIT TO W N H O U S E 4 UNIT TO W N H O U S E 4 UNIT TOWNHOUSE 4 U N I T T O W N H O U S E 7 7 WET WET WE T WE T WET W E T WET WET WET WET WET WET WET WE T WE T WE T WET WE T W E T WE T 4X 4X 4X 4X 4X 4X 4X 4X 82 U N I T B U I L D I N G 78 U N D E R G R O U N D S T A L L S 4 S T O R Y 82 U N I T B U I L D I N G 78 U N D E R G R O U N D S T A L L S 4 S T O R Y 82 UNIT BUILDING 78 UNDERGROUND STALLS4 STORY 82 UNIT BUILDING 78 UNDERGROUND STALLS 4 STORY 82 U N I T B U I L D I N G 78 U N D E R G R O U N D S T A L L S 4 S T O R Y 4X 4 X 4 X 4X 4X 8 29 14 28 4 UN I T T O W N H O U S E 8 8 4 48 4 11 8 6 78 OL I V I A R O A D OL I V E R A V E N U E BLAIR B O U L E V A R D BASIN A BASIN C BASIN B BASIN D BASIN E LAKE BUTTE DE S M O R T S D R 27584 G1-PHASING DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY FIL E L O C A T I O N : S:\ P R O J E C T S \ 2 7 0 0 0 P R O J \ 2 7 5 0 0 - 2 7 5 9 9 \ 2 7 5 8 4 L A K E B U T T E D E S M O R T S D E V E L O P M E - O S H K O S H W I \ 2 7 5 8 4 P R O D U C T I O N F I L E S \ 2 7 5 8 4 C I V I L 3 D \ P R O D U C T I O N D W G S \ P H A S E 2 - 6 S I P \ 2 7 5 8 4 G 1 - P H A S I N G . D W G G1-20 - 01/22/2024 22-27584 G1-20 OVERALL SITE PHASING PLAN ---- ---- G1-20 OSHKOSH WISCONSIN OVERALL SITE PHASING PLAN 0 SCALE IN FEET 80 160 LMM /JRS LMM / JRS KBR / JRS LAKE BUTTE DES MORTS DEVELOPEMENT (PHASE 2-6) RED EARTH LLC PHASE ONE PHASE TWO PHASE THREE PHASE FOUR PHASE FIVE PHASE SIX PROPOSED PROPER T Y L I N E , T Y P SITE SUMMARY PHASE 2-6 ROW PHASE 2 PHASE 3 PHASE 4 PHASE 5 PHASE 6 SITE/LOT AREA:95,454 SF (2.2 AC)522,320 SF (12.0 AC)790,152 SF (18.1 AC)359,652 SF (8.3 AC)787,907 SF (18.1 AC)396,057 SF (9.1 AC) BUILDING AREA:0 SF (0.0 AC)31,245 SF (0.7 AC)31,245 SF (0.7 AC)40,271 SF (0.9 AC)52,685 SF (1.2 AC)31,245 SF (0.7 AC) PROPOSED IMPERVIOUS:73,796 SF (1.7 AC)44,536 SF (1.0 AC)44,573 SF (1.0 AC)70,420 SF (1.6 AC)74,497 SF (1.7 AC)49,515 SF (1.1 AC)