Loading...
HomeMy WebLinkAbout23-06 CO #1 (FINAL) LaLonde Contractors 12-11-23TO: LALONDE CONTRACTORS CHANGE ORDER #1 (FINAL) 1609 LINCOLN AVENUE WAUKESHA, WI 53186 Your present contract with the City of Oshkosh, Contract No. 23-06, awarded February 14, 2023, is hereby amended and changed as follows: NET INCREASE TO SECTION I: $288,799.48 NET INCREASE TO CONTRACT $288,799.48 SECTION I TOTALS BID TOTAL $1,483,076.90 $1,483,076.90 CO #1 $288,799.48 $288,799.48 CONTRACT TOTAL $1,771,876.38 $1,771,876.38 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: DECEMBER 11, 2023 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ DocuSign Envelope ID: F1E91D2E-10EF-4113-AD19-78443D3DE8BF CONTRACT 23-06 CHANGE ORDER #1 (FINAL) 23-06 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1011 Clearing; complete as specified Inch Diameter 8.00 0.00 -8.00 $20.00 ($160.00) 1021 Grubbing; complete as specified Inch Diameter 8.00 0.00 -8.00 $10.00 ($80.00) 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 70,750.00 122,078.54 51328.54 $1.70 $87,258.52 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 950.00 657.60 -292.40 $93.00 ($27,193.20) 1309 7" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 750.00 0.00 -750.00 $95.00 ($71,250.00) 1318 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 700.00 424.46 -275.54 $93.00 ($25,625.22) 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 500.00 241.70 -258.30 $95.00 ($24,538.50) 1328 9" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 350.00 46.77 -303.23 $97.00 ($29,413.31) 1329 9" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 100.00 0.00 -100.00 $104.00 ($10,400.00) Page 2 of 4 DocuSign Envelope ID: F1E91D2E-10EF-4113-AD19-78443D3DE8BF CONTRACT 23-06 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1360 Adjust manholes and inlets; complete as specified Each 10.00 2.00 -8.00 $450.00 ($3,600.00) 1370 Turf restoration; complete as specified Square Yards 300.00 234.27 -65.73 $8.00 ($525.84) 1372 Restore gravel driveway/apron; complete as specified Square Yards 150.00 0.00 -150.00 $15.00 ($2,250.00) 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 100.00 0.00 -100.00 $1.64 ($164.00) 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 100.00 0.00 -100.00 $1.84 ($184.00) 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 100.00 0.00 -100.00 $1.99 ($199.00) 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 250.00 14.81 -235.19 $15.00 ($3,527.85) 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 250.00 0.00 -250.00 $20.00 ($5,000.00) 1428 18" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 250.00 258.85 8.85 $74.00 $654.90 1438 24" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 250.00 144.20 -105.80 $78.00 ($8,252.40) 1448 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 500.00 581.70 81.70 $80.00 $6,536.00 1460 Sidewalk curb; complete as specified Linear Feet 250.00 32.10 -217.90 $56.00 ($12,202.40) 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 50,000.00 89,384.48 39384.48 $8.60 $338,706.52 Page 3 of 4 DocuSign Envelope ID: F1E91D2E-10EF-4113-AD19-78443D3DE8BF CONTRACT 23-06 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1502 4" concrete sidewalk with 3" CABC and grading; water dept. locations; complete as specified Square Feet 4,850.00 1,201.08 -3,648.92 $9.95 ($36,306.75) 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 25,000.00 42,127.51 17127.51 $10.00 $171,275.10 1512 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; water dept. locations; complete as specified Square Feet 1,750.00 877.80 -872.20 $13.25 ($11,556.65) 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,500.00 1,865.47 365.47 $14.50 $5,299.32 1540 Curb ramp detectable warning field (natural/non- painted); complete as specified Square Feet 750.00 442.00 -308.00 $35.00 ($10,780.00) 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 1,500.00 0.00 -1,500.00 $2.15 ($3,225.00) 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 8,000.00 9,924.00 1924.00 $8.60 $16,546.40 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 500.00 0.00 -500.00 $15.00 ($7,500.00) 1700 Sawing existing pavement; complete as specified Linear Feet 2,045.00 281.40 -1,763.60 $4.52 ($7,971.47) 1720 Profile saw cut concrete curb; complete as specified Linear Feet 150.00 0.00 -150.00 $25.00 ($3,750.00) 1800 Base aggregate dense; 3/4"; complete as specified Tons 200.00 0.00 -200.00 $22.67 ($4,534.00) 1915 5" asphaltic surface MT with 6" CABC and grading; complete as specified Square Yards 250.00 0.00 -250.00 $82.66 ($20,665.00) 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 250.00 160.03 -89.97 $73.61 ($6,622.69) SECTION I (BID ITEMS 1011 - 1916) - SUBTOTAL: $626,276.76 ($337,477.28) NET INCREASE TO SECTION I: $288,799.48 $288,799.48NET INCREASE TO CONTRACT: Page 4 of 4 DocuSign Envelope ID: F1E91D2E-10EF-4113-AD19-78443D3DE8BF