Loading...
HomeMy WebLinkAboutAmendment No. 3/DOT & StrandAMENDMENT NO. 3 TO THE CONTRACT BETWEEN CITY OF OSHKOSH AND THE WISCONSIN DEPARTMENT OF TRANSPORTATION AND STRAND ASSOCIATES, INC. FOR Project ID 4994-00-83 Sawyer Street, City of Oshkosh (Rush Avenue - Sawyer Creek) Local Street Winnebago County Project ID 4994-01-05 Sawyer Street Bridge and Approaches, City of Oshkosh (Sawyer Creek) Local Street Winnebago County Project ID 4994-00-85 Oakwood Road, City of Oshkosh (Village Lane - 9th Avenue) Local Street Winnebago County Project 1D 4994-00-99 Oakwood Road Bridge and Approaches, City of Oshkosh (Sawyer Creek) Local Street Winnebago County The CONTRACT made and entered into by and between the City of Oshkosh and the Wisconsin Department of Transportation and Strand Associates, Inc., dated February 28, 2b'007 is hereby amended as set forth on the following six (6) pages. This CONTRACT is amended to provide plans for: Bridge Rehabilitation and Approaches for Structure P-70-0707 on Sawyer St. in the City of Oshkosh for Project ID 4994-01-05. ~IA Y:a eo\O 5SDATA'~Sai\051--100\059\434\wRD~Amendme2t 3.do¢ ID. 4994-00-83, 4994-00-85, 4994-00-99 Page i of 6 IN WITNESS WHEREOF, the parties hereto have caused this AMENDMENT to be executed and approved on the date written by their author/zed officers or representatives. Approved for the CITY OF OSHKOSH Approved for the firm of STRAND ASSOCIATES, 1NC. BY: Richard A. Wollangk Date City Manager BY: Roger H. Huchthansen, P.E. Secretary Date BY: Penny S. V~lf- Deputy Cie Clerk Date hereby certif,/that the necessary provisions have been made to pay the liability which will accrue under this contract. City Comptroller Approved for the STATE OF WISCONSIN, Department of Transportation BY: Name Date APPROVED OSHKOSH, W~CO~SlN F~lAY:aeo\G:kgDATA~i~Sa~O51--lOO\O$9\434\WP~Dk&mendment 3.doc ID. 4994-00-83, 4994-00-85, 4994-00-99 Page 2 of 6 AMENDMENT NO. 3 A. SCOPE OF SERVICES Senfces under this Amendment include: (1) Road and Structure plans for P-70-0707 under project ID 4994-01-05. (2) Incorporate the City's plans and specifications for sanitary sewer and watermain into the PS&E package for ID 4994-00-83. B. PUBLIC INVOLVEMENT Section VI.E. 1 .a is revised as follows: (a) The CONSULTANT shall conduct or assist the MUNICIPALITY in holding two informational meetings for ID 4994-00-85 and ID 4994-00-99 combined, two informational meetings for D 4994-00-83, and one informational meeting for D 4994-01-05 to acquaint the public with the concepts and probable impacts of these PROJECTS. C. STRUCTURE PLANS (1) A Structure Survey Report/Hydraulic Report, which includes a discussion of structure sizing, shall be prepared by the CONSULTANT in accordance with the procedures set forth in the MANUAL. The completed preliminary plans shall show the structure plan, elevation, and typical cross section, and ali pertinent data shall appear on the first sheet(s) of the completed structure plans. Four prints of this plan and the Structure Survey Report/Hydraulic Report shall be submitted to the MUNICIPALITY for review. The MUNICIPALITY will review this preliminary plan and the Structure Survey Report/Hydraulic Report and return one print to the CONSULTANT showing requested revisions, if any. (2) Plans and Structures shall be fully dimensioned besides showing controlling elevations. The plans shall be prepared with such precision and detail to allow for the convenient layout in the field with customary degree of accuracy, and to allow for the production of an accurate estimate of quantities for ail pertinent items of work to be performed in the PROJECT. (3) Plans and Structures shall include schedules for bar steel reinforcement. Such schedules shall provide all of the necessary detail required for the fabrication of the reinforcement without the necessity of making separate shop drawings for that purpose. (4) When the plans for a structure have been completed the CONSULTANT shall furnish the MUNICIPALITY with three sets of prints of such plans for review and examination. i~IAY :a e o\G:kSDATAXOSa¢051 -- 100\089\434\WlLDkAmendmem 3 doc ID. 4994-00-83, 4994-00-85, 4994-00-99 Page 3 of 6 (s) The CONSULTANT shall submit to the lVlUNICIPAL1TY three copies for review and examination of all specifications for items of work in the Structure Plans which are not covered by the STANDARD SPECIFICATIONS and such amendments to or revisions of the STANDARD SPECIFICATIONS as may be required to properly cover the work contemplated by the plans. (6) Plans will be subject to review and examination by the MUNICIPALITY. Such review and examination may be made on the site of the PROJECT. (7) Along with the plans for structures the CONSULTANT shall submit one copy or reproduction of the design computations for the MJJ'NICIPALITY's review and permanent file. (8) The CONSULTANT shall famish such other pertinent information and data with respect to the plans and design as the MUNICIPALITY may request. ROAD PLANS Section VI.I is amended to include the following: 16. Municipal Utility Plans SERVICES PROVIDED BY MUNICIPALITY Section VI.K is amended to include the following: 9. 10. Final Municipal Utility Plans Special Provisions for Municipal Utility Bid Items Engineer's Estinqate for Municipal Utility Bid Items PROSECUTION AND PROGRESS Section VI.L.5. is revised as follows: (1) The following items of service will be completed and submitted to the MXJNICIPALITY by the indicated dates, if CONSULTANT has received the Notice to Proceed by January 15, 2002. Date Initial Project Review Soils Report Structure Survey Repor~ Prelim/nary Structure Plan Final Structure Plans Final PS&E January 2002 January 2002 February 2002 April 2002 June 2002 October 2002 /I). 4994-00-83, 4994-00-85, 4994-00-99 Page 4 of 6 BASIS OF PAYMENT Subsection VI.M. is amended to include the following: I.D. 4994-00-85 (a) For reports, agency coordination, public involvement, meetings, surveys, road plans, PS&E package, right-of-way plats, descriptions, and contaminated site services performed by CONSULTANT, a lump sum of $141,246. (No change) (b) For geotechnical investigation services sublet to STS Consultant Ltd., the CONSULTANT's actual cost not to exceed $2,620. (No change) (c) For archaeological and historical investigation services sublet to Archaeological Consulting and Services, the CONSULTANT's actual cost not to exceed $1,500. (No change). (d) For completing an Environmental Assessment (3-FONSI) including a noise analysis, if authorized by the DEPARTMENT a lump sum of $3,909. (No change) (e) The total compensation amount for I.D. 4994-00-85 shall be $149,275. (No change) I.D. 4994-00-83 (a) For reports, agency coordination, public involvement, meetings, surveys, structure plans, PS&E package, right-of-way plats, and descriptions performed by CONSULTANT, a lump sum of $142,295 (see Amendment 3, Exhibit E, F, G and H). (An increase of $1774) (b) For geotechnical investigation services sublet to STS Consultants Ltd., the CONSULTANT's actual cost not to exceed $2,400. (No change) (c) For historical investigation services sublet to Archaeological Consulting and Services, the CONSULTANT's actual cost not to exceed $1,500. (No change) (d) For hazardous material Phase 2 - environmental sampling for up to three sites performed by the CONSULTANT, if authorized by the DEPARTMENT, a lump sum of $3,305 per site not to exceed a combined lump sum of $9,914 for three sites. (No change) (e) For hazardous material Phase 2 lab work for up to three sites, sublet to US Oil, if authorized by the DEPARTMENT, the CONSULTANT's actual cost up to $450 per site not to exceed a combined amount of $1,350 for three sites. (No change) ID. 4994-00-83, 4994-00-85, 4994-00-99 Page 5 of 6 (2) (0 For hazardous material Phase 2 drilling for up to three sites, sublet to Groundwater Management Services, if authorized by the DEPARTMENT, the CONSULTANT's actual cost up to $828 per site not to exceed a combined amount of $2,485 for three sites. (No change) (g) The total compensation amount for I.D. 4994-00-83 shall be $159,944. (An increase of $I,774) I.D. 4994-00-99 (a) For reports, agency coordination, public involvement, meetings, surveys, structure plans, PS&E package, right-of-way plats, and descriptions performed by CONSULTANT, a lump sum of $35,078. (No change) O) For geotechnicaI investigation services sublet to STS Consultants Ltd., the CONSULTANT's actual cost not to exceed $2,550. (No change) (c) The total compensation amount for I.D. 4994-00-99 shall be $37,628. (No change) I.D. 4994-01-05 (a) For reports, agency coordination, public involvement, meetings, surveys, structure plans, PS&E package, right-of-way plats, and descriptions performed by CONSULTANT, a lump sum of $56,839 (See Amendment 3 Exhibit A, B, C aD). (b) The total compensation amount for I.D. 4994-01-05 shalI be $56,839. The total compensation for the CONTRACT shall be $403,686. The total cost o£this Amendment is $58,613. The revised Contract amount is $403,686 under this Amendment. D. 4994-00-83, 4994-00-85, 4994-00-99 Page 6 of 6 EXHIBIT A I.D. 4994-01-05 Sawyer Street Bridge and Approaches Local Road Winnebago County FEE COMPUTATION SCHEDULE -ALL SERVICES 1. DIRECT SALARY COST Project Manager Project Engineer Staff Engineer Engineering Technician Clerical Estimated Hourly Estimated Hours Rates Costs 27 $42.28 $1,141.56 199 $25.65 $5,104.35 364 $20.74 $7,549.36 248 $16.56 $4,131.68 42 $15.88 $666.96 Total 880 TOTAL DIRECT SALARY: Total 18,594 2. DIRECT, GENERAL AND ADMINISTRATIVE OVERHEAD Overhead Rate 3.DIRECT CHARGE (REIMBURSABLE} 1.4558 x Engineering Copier Xerox, Phone, Postage, Fax Mileage, Motel & Meals Total Station Rental CADD Computer Engineering Computer & Word Processing 4. FIXED FEE (10.0%) $18,593.91 + $18,593.91 $27,069,01 ) x TOTAL OVERHEAD: $60.00 $510.00 $260.00 $170.00 $4,500.00 $1,110.00 TOTAL EXPENSES: 0.10 = STRAND LUMP SUM: GRAND TOTAL: 27,069 6,610 4,566 56,839 56r8391 12/27/2001 3:45 PM amend3 for Sawyer bridge.xls 0 121 ~o .~ ._ ~ -- _ .- _ ~ == .... ~ ~ 0 EXHIBIT E I.D. 4994-00-83 Sawyer Street Local Road Winnebago County FEE COMPUTATION SCHEDULE -ALL SERVICES 1. DIRECT SALARY COST Project Manager Project Engineer Staff Engineer Engineering Technician Clerical Estimated Hourly Estimated Hours Rates Costs 0 $42.28 $0.00 14 $25.65 $359.10 0 $20.74 $0.00 0 $16.66 $0.00 15 $15.88 $238.20 Total 29 TOTAL DIRECT SALARY: Total $597 2. DIRECT, GENERAL AND ADMINISTRATIVE OVERHEAD Overhead Rate 3.DIRECT CHARGE (REIMBURSABLE) 1.4558 x Engineering Copier Xerox, Phone, Postage, Fax Mileage, Motel &MeaIs Total Station Rental CADD Computer Engineering Computer & Word Processing 4. FIXED FEE (10.0%) $597.30 ( $597.30 + $869.55 )x TOTAL OVERHEAD: $0.00 $40.00 $0.00 $0.00 $0.00 $120.00 ToTAL EXPENSES: 0.10 = STRAND LUMPSUM: GRAND TOTAL: $870 ' $160 $147 $1,774 I $11774 I 12/27/2001 3:39 PM amend3 part 2 Sawyer utility.xls i~°o 0000000 ~000 D : ~ ~._~o, ~ 0