HomeMy WebLinkAboutSawyer Creek Ped TrailTO: CR Meyer & Sons Co. 895 W. 20th AvenUe Oshkosh, WI 54902 CHANGE ORDER NO. 1 Date: September 17, 2003 Your present contract with the City of Oshkosh for construction of a pedestrian trail known as the Sawyer Creek Pedestrian Trail West Leg, is hereby amended and changed as follows: ADD: Per the attached letter dated September 17, 2003 $13,022.00 RECOM~/F.~D.~ Dire¢oro~b~muni~elopment I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Finance Dimc[or r~enson, A~ant-(~ty At~o~'ney September 18, 2003 Mr. Jackson Kinney City of Oshkosh P.O. Box 1130 OShkOsh, WI 53903-1130 Reference: Sawyer Creek Pedestrian Trail West Leg Change Request #1 Dear Mr. Kinney: Please review the following Change .Request and call with any questions. The changes to the scope of work are as follows: Install a 11' high wall in lieu of a 4' high Wall for the bridge abutment to reinforce the long-term viability of the structure given the topographical conditionS. 1. Form, reinforce, and pour extra wall, $ 4,340.00 2, Excavate extra so~ due to tallerwalL $ 945.00 3. Extend boardwalk 16-feet. $ 2,376.00 4. Add riprap for erosion control under boardwalk, $ 400:00 The following items were not anticipated or seen during the bidding process: 5. Remove trees from site. 6. Repair muddy 340-foot by 12-foot area by removing 9inches of material and installing 12 inches of 3-inch minus base matedaL $ 1,050.00 $ 3,911.00 Add per change request #1. $ 13,022.00 Original lump sum price: $ 94,124.00 Revised Contract Amount: $ 107,146.00 Thank you for the opportunity tO provide you with this Change Request. ' Sincerely, C. R. MEYER AN0 SONs COMPANY Todd M. Dalbec, E.LT. Project Engineer