HomeMy WebLinkAboutPW CNT 02-13/Cng Ord #1TO: Northeast Asphalt, Inc. W6380 Design Drive Greenville, WI 54942 CHANGE ORDER # 1 DATED: October 6, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 02-13 is hereby amended NET DECREASE TO SECTION I - CONCRETE PAVING: NET INCREASE TO SECTION II - STORM SEWER: NET INCREASE TO SECTION III - SANITARY SEWER: NET DECREASE TO CONTRACT: $28,3O6.45) $o.oo $o.oo ($28,306.45) Recommended: ~D. r :~o~r c(~P ~?W~o r ks City Clerk /¥ -- ~.~ AP~/~,c~accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller ACp~ved ~.~to/~rm: City )k't'~,' "' CONTRACT: 02-13 CHANGE ORDER # 1 SECTION I - ASPHALT PAVING ITEM NUMBER DESCRIPTION CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREASEIN CONTRACT PRICE DECREASEIN CONTRACT PRICE 1. Approx. 700 cubic yards of excavation, complete as specified, per cubic yard 700.00 45.80 -654.20 $6.00 ($3,925.20) 2. Approx. 3,350 square yards of asphaltic pavement milling, complete as specified, per sq. yd. 3,350.00 3,160.20 -189.80 $2.00 ($379.60) 3. Approx. 14,280 square /ards of asphaltic )avement pulverizing, complete as specified, per sq. yd. 14,280.00 14,280.00 $0.50 4. Approx. 3,250 tons of asphaltic concrete binder material, complete as specified, per ton 3,250.00 2,618.60 -631.40 $26.00 ($16,416.40 5. Approx. 2,420 tons of asphaltic concrete surface material, complete as specified, per ton 2,420.06 2,281.60 I -138,40 $28.00 ($3,875.20) 6. Approx. 2,390 tons of crushed stone base, complete as specified, per ton 2,390.06 1,894.70 -495.30 $8.50 ($4,210.05) 7. Adjust approx. 8 manholes complete as specified, ._.ach 8.0C 8.00 $150.00 8. =reparation of foundation 'or asphalt paving on S. ~/ashbum Street, complete specified, lump sum 1.001 1.00 $8,700.00 9. Preparation of foundation for asphalt paving on Chestnut Street, complete as specified, lump sum 1.00 1.00 $2,500.00 SECTION I - (BID ITEMS 1 - 9) - SUB-TOTALS $0.00 ($28,606.45) ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION I - ASPHALT PAVING ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE INcoNTRACT DECREASE INcoNTRACT NUMBER QUANTiTiES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Furnish and install 4" wrapped drain tile on S. Washburn Street at w. Waukau Avenue, per linear foot 25.00 25,00 $20.00 $500.00 ADDITIONAL WORK: c.c. # 1 - (ITEM 1) - SUB-TOTAL NET DECREASE TO SECTION I - $500.00 $0.00 ($28,306.45) Page 1 CONTRACT: 02-13 CHANGE ORDER# 1 SECTION II - STORM SEWER N/ R DESCRIPTION CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREASEIN CONTRACT PRICE DECREASEIN CONTRACT PRICE 10. Furnish and install approx. three (3) Neenah R-1710 Storm Manhole Frames with Type "B" solid lid with open pick holes, non- rocking, complete as spec f ed, each 3.00 3.00 $300.00 SECTION II - (BID ITEM 1) - SUB-TOTALS $0.00 $0.00 NET INCREASE TO SECTION II - $0.00 SECTION III - SANITARY SEWER ITEM NUMBER CONTRACT QUAN~TIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREASEIN CONTRACT PRICE DECREASEIN CONTRACT PRICE 11. Furnish and install approx. two (2) Neenah R-1710 Sanitary Manhole Frames Type "B" solid lid w/self- sealing gasket and concealed pick holes, non- rocking, complete as spec fled, each 2.00 2.00 $300.00 SECTION III - (BID ITEM 1) - SUB-TOTALS $0.00 $0.00 NET INCREASE TO SECTION III - $0.00 NET INCREASE TO SECTIONS I, II, III NET DECREASE TO SECTIONS I, I[, III $500.00 ($28,806.45) NET DECREASE TO CONTRACT: ($28,306.45) Page 2