HomeMy WebLinkAboutPW CNT 03-09/Cng Ord #1TO:
DeKeyser Construction Co., Inc.
522 Clement Street
Green Bay, WI 54302
CHANGE ORDER # 1
DATED: December 30, 2003
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
03-09 , is hereby amended
NET INCREASE TO SECTION I- SANITARY SEk~ER
NET INCREASE TO SECTION II - WATER f4AIN
NET DECREASE TO SECTION I11 - STORM SEWER
NET DECREASE TO CONTRACT:
$378.93
$0.00
($8,620.99)
($8,242.06)
Recommended:
Director of Publib Works
CITY OF OSHKOSH
__ . City-C!er~ / ~.~
ContractOr
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
City AttorneY ~
CONTRACT: 03-09 CHANGE ORDER # 1
SECTION I - SANITARY SEWER
ITEM
NUMBER
CONTRACT
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
COSTPER
UNIT
INCREASE ~
CONTRACT
PRICE
DECREASE~
CONTRACT
PRICE
1. Furnish and install approx.
35 linear feet of 8" Sanitary
Sewer Relay (Kirkwoed
Drive), complete as
, specified, per linear foot 35.00 32.80 -2.20 $81.75 ($179.85)
2. Furnish and install approx.
20 vertical feet of std.
Sanitary Manhole (4' Inside
Diameter) in two (2)
locations, without castings,
complete as specified, per
vertical foot 20.00 18.98 -1.02 $211.00 ($215.22
SECTION 1 - (BID ITEMS 1 - 2) - SUB-TOTALS
$0.00 ($395.07)
ADDITONAL WORK REQUIRED: C,O. # 1 - SECTION I - SANITARY SEWER
ITEM
NUMBER
DESCRIPTION
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
~CREASE
NET
DECREASE
COSTPER
INCREASE IN DECREASE IN
CONTRACT CONTRACT
PRICE PRICE
1 Raise existing sanitary
manhole at Cherry Park Ct.
and HWY 45, umpsum
1.00
1.00
$774.00 $774.00
ADDITIONAL WORK: c.o, # 1 - (ITEM 1) - SUB-TOTAL
$774.00 $0.00
NET INCREASE TO SECTION I -
$378.93
SECTION II - WATER MAIN
ITEM DESCRIPTION
NUMBER
INSTALLED NET NET COST PER
QUANTITIES INCREASE DECREASE UNIT
INCREASEIN
CONTRACT
PRICE
DECREASEIN
CONTRACT
PRICE
3. Furnish and install approx.
15 linear feet of 6" Ductile
Iron Water Main w/poly
wrap, complete as
specified (fittings not
nc uded), per linear foot
15.00
63.00
48.00
$120.00
$5,760.00
Page1
CONTRACT: 03-09 CHANGE ORDER # 1
INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COSTPER CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
4. Furnish and install approx.
615 linear feet of 8" Ductile
iron Water Main Relay
w/poly wrap (Punhoqua
Street), complete as
specified, including asphalt
)avement restoration,
(fittings not included), per
linear foot
615.00 616,00 1.00 $72.50 $72.50
5. Furnish and install approx.
680 linear feet of 8" Ductile
Iron Water Main Relay
w/poly wrap (W. 19th
Avenue), complete as
specified, including asphalt
)avement restoration,
(fittings not included) per
linear foot 680,00 673.00 -7.00 $66.25 ($463.75)
6. Furnish and install approx.
805 linear feet of 10"
Ductile Iron Water Main
w/poly wrap (Emmers
Lane), complete as
specified, (fittings not
included) Der linear foot 805.0fi 809.50 4.50 $55.50 $249.75
7. Furnish and bore/jack
approx. 165 linear feet of
18" Steel Casing Pipe
(Hwy. 21 crossing),
complete as specified, per
linear foot 165.00 162.00 -3,00 $224.00 ($672.00)
8. Relay approx. 15 linear
feet of 8" Water Main
(Kirkwood Drive), complete
as specified (with fittings),
lump sum 1.0C 0.00 -1.00 $7,500.00 ($7,500.00
9, Relay and lower 8" Water
Main (Hwy, 45), complete
as specified (with fittings),
lump sum 1.00 1.00 $7,175.00
10, Furnish and install approx.
110 linear feet of 1" Water
Service (Relay and New),
complete as specified, not
including corporation and
stop box, per linear foot
110.00 164.00 54.00 $80.25 $3,253.50
11, Furnish and install approx.
seven (7), 1" corporation
and stop box with rod,
:omplete as specified,
9ach 7.00 9.00 2.00 $225.00 $450,00
Page 2
CONTRACT: 03-09 CHANGE ORDER # 1
INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
12. Reconnect approx, three
(3), 1" Water Services,
complete as specified,
each 3.00 2.00 -1.00 $300.00 ($300.00)
13. Lower approx, two (2), 1"
Water Services (Hwy. 45),
complete as specified,
each 2.00 2.00 $500.00
14. Furnish and install approx.
two (2), 6" x 6" Tees,
complete as specified,
each 2.00 3.00 1.00 $150.00 $150.00
15. Furnish and install approx.
three (3), 8" x 6" Tees,
complete as specified,
each 3.00 4.00 1.00 $180.00 $180.00
16. Furnish and install approx.
three (3) 10" x 6" Tees,
complete as specified,
each 3.00 3.00 $236.00
17. Furnish and install approx.
four (4), 8" x 6" Reducers,
complete as specified,
each 4.00 4.00 $110.00
18. Furnish and install approx.
one (1), 10" x6" Reducer,
complete as specified,
each 1.00 1.00 $185.00
19. Furnish and install approx.
one (1), 6" - 90 degree
Bend, complete as
specified, each 1.00 0.00 -1.00 $170.00 ($170.00
20. Furnish and install approx.
one (1), 8" - 90 degree
Bend, complete as
specified, each 1.00 1.00 $202.00
21. Furnish and install approx.
six (6), 6" - 45 degree
Bends, complete as
specified, each 6.00 7.00 1.00 $143.00 $143.00
22. Furnish and instai] approx.
two (2), 10" - 45 degree
Bends, complete as
specified, each 2.00 3.00 1.00 $232.00 $232.00
23. Furnish and install approx.
five (5), 6" Valves,
complete as specified,
each 5.0C 6.00 1.00 $606.00 $606.00
24. Furnish and install approx.
three (3), 8" Valves,
complete as specified,
each 3.00 4.00 1.00 $802.00 $802.00
Page 3
CONTRACT: 03-09 CHANGE ORDER # 1
INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE
25. Furnish and install approx.
[wo (2), 10" Valves,
complete as specified,
each 2.00 2.00 $1,108.00
26. Furnish and install approx.
one (1), 6" x 6" Tapping
Valve and Sleeve,
complete as specified,
each 1.00 1.00 $2,000.00
27. Furnish and install approx.
one (1), 12" x 10" Tapping
Valve and Sleeve,
complete as specified,
each 1.00 1.00 $3,435.00
28.
Furnish and install approx.
two (2) Hydrants, complete
as specified, each 2.00 2.00 $1,593.00
29.
Abandon 6" Water Main on
Punhoqua Street, complete
as specified, lump shm 1.00 1.00 $750.00
30. Abandon 3" - 6" Water
Main on W. 19th Avenue,
complete as specified,
lump sum 1.00 1.00 $2,000.00
31. Remove and replace
approx. 45 square yards of
3" hot-mixed Asphalt
Pavement (Hwy. 45),
complete as specified, per
square yard 45.00 0.00 -45.00 $17.50 ($787.50)
32. Provide $200.00 to the Cit~
of Oshkosh for project
management
communications, complete
as specified, lump sum
1.0¢ 1.00 $200.00
SECTION II - (BID ITEMS 3 - 32) - SUB-TOTALS
$11,898.75 ($9,893.25)
ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION II - WATER MAIN
ITEM
NUMBER
INCREASEIN
NET NET COSTPER CONTRACT
INCREASE DECREASE UNIT PRICE
DECREASE ~
CONTRACT
PRICE
Extra excavation and
gravel placement on
Punhoqua St. due to poor
so condton, umpsum
1.00
1.00
$1,440.50 $1,440.50
Page 4
CONTRACT: 03-09 CHANGE ORDER # 1
INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
2 Insulate existing water
main on Kirkwood Dr.
instead of main lowering,
lump sum 1.00 1.00 $1,147.00 $1,147.00
3 Credit for asphalt
~avement replacement on
Punhoqua St. which was
deleted from contract ($4,788.00)
4 Furnish and install one (1)
8", 1/8 bend 1.00 1.00 $195.00 $195.00
ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 -3) - SUB-TOTAL $2,782.50 ($4,788.00)
NET DECREASE TO SECTION II - $0.00
SECTION III - STORM SEWER
ITEM
NUMBER
DESCRIPTION
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
~CREASE
NET
DECREASE
COSTPER
INCREASE IN
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
33. Furnish and install approx.
230 linear feet of 6" Mini-
Storm Sewer (Faust
Avenue), with all fittings,
complete as specified, per
linear foot 230.00 0.00 -230.00 $45.25 ($10,407.50
34. Furnish and install approx.
14 linear feet of 12" Storm
Sewer (Hwy. 45), complete
as specified, per linear foot
14.00 15.00 1.00 $41.00 $41.00
35. Furnish and install approx.
150 linear feet of 12" Storrr
Sewer (Catherine Avenue),
complete as specified,
including pavement
restoration, per linear foot
150.06 151.50 1.50 $40.25 $60.38
36. Furnish and install approx. !
130 linear feet of 12"
Storm Sewer (Alley),
complete as specified, per
linear foot 130.00 130.00 $32.25
37. Furnish and install approx.
50 linear feet of 12" Storm
Sewer Relay (W. 12th
Avenue), complete as
specified, per linear foot
50.00 54.00 4.00 $40.50' $162.00
Page 5
CONTRACT: 03-09 CHANGE ORDER # 1
INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
38. Furnish and install approx.
25 linear feet of 18" Storm
Sewer, complete as
specified, per linear foot
25.00 6.74 -18.26 $48.50 ($885.611
39. Furnish and install approx.
1,335 linear feet of 30"
Storm Sewer (Easement),
complete as specified, per
linear foot 1,335.00 1,354.20 19.20 $46.00 $883.20
40. Furnish and install approx.
120 linear feet of 29" x 45"
HERCP Storm Sewer
Easement), complete as
specified, per linear foot
120.00 114.55 -5.45 $113.75 ($619.94)
41. Furnish and install approx.
280 linear feet of 36" Storm
Sewer (Hwy. 45), complete
as specified, per linear foot
280.00 259.90 -20.10 $55.00 ($1,105.50
42. Construct approx. 350
linear feet of Open Ditching
(Easement), complete as
specified, per linear foot
350.00 343.50 -6.50 $16.00 ($104.00)
43. Furnish and install two (2),
18" End Section, complete
as specified, each
2.00 2.00 $236.00
44. Furnish and install one (1),
36" End Section, complete
as specified, each
1.00 1.00 $2,111.00
45. Furnish and install one (1)
Masonary Endwall over
double 29" x 45" Storm
Sewer, complete as
specified, with riprap, lump
sum 1.00 1.00 $4,900.00
46. Furnish and install approx.
two (2) std. Inlets (Type 1
with 18" sump; 30"
diameter) with castings,
~omplete as specified,
~ach 2.00 2.00 $1,285.00
47. Furnish and install approx.
3.40 vertical feet of std.
Storm Manhole (4' Inside
Diameter) in two (2)
locations without castings,
somplete as specified, per
vertical foot 6.40 8.74 2.34 $340.00 $795.60
Page 6
CONTRACT: 03-09 CHANGE ORDER Cf 1
INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COSTPER CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
48. Furnish and install approx.
21.50 vertical feet of std.
Storm Manhole (6' Inside
Diameter) in two (2)
locations without castings,
complete as specified, per
vertical foot 21.50 21.00 -0.50 $446.00 ($223.00)
49. Furnish and install 6.10
vertical feet of std. Box
Storm Manhole in two {2)
locations, without castings,
complete as specified, per
vertical foot 6.10 8.07 1.97 $820.00 $1,615.40
50. Rebuild std. Storm
Manhole (Hwy. 45),
complete as specified,
lump sum 1.00 1.00 $3,415.00
51. Remodel existing Box
Storm Manhole
Easement), complete as
specified, lump sum 1.00 1.00 $7,500.00
52. Relay existing 18" Culvert
(Hwy. 45), complete as
specified, lump sum 1.00 1.00 $1,500.00
53. Remove approx. 78 I.D. of
trees and stumps,
complete as specified, per
inch diameter 78.00 78.00 $25.00
54. Furnish and install 6"
Storm Lateral at 1100
Uerritt Avenue, complete
as specified, lump sum 1.00 1.00 $2,200.00
55. Provide $200.00 to the City
of Oshkosh for project
management
communications, complete
as specified, lump sum
1.00 1.00 $200.00
SECTION III - (BID ITEMS 33 - 55) - SUB-TOTALS
$3,557.58 ($13,345.55)
ADDITONAL WORK REQUIRED: C.C. Cf 1 - SECTION III - STORM SEWER
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASEPRICE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT
Lower two existing sanitary
laterals on HWY "45" in
way of proposed storm
sewer, ump sum
1,00 1,00 $408.00 $408.00
DECREASE IN
CONTRACT
PRICE
Page 7
CONTRACT: 03-09 CHANGE ORDER Cf 1
I INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER
NUMBER I QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
2 Asphalt pavement removal
and replacemnt at Johnson
Ave. and HWY "45", per
sq. yd. 79.37 79.37 $17.50 $1,388.98
3 Credit for asphalt
replacement on Alley south
of W. 12th Ave. which was
deleted from contract
($630.00)
ADDITIONAL WORK: C. 0. # 1 - (ITEMS I - 3) - SUB-TOTAL $1,796.98
NET DECREASE TO SECTION III - ($8,620.99)
($630.00)
NET INCREASE TO SECTIONS I, II, III
NET DECREASE TO SECTIONS I, 11, 111
$20,809.81
($29,051.87)
NET DECREASE TO CONTRACT:
($8,242.06)
Page 8