HomeMy WebLinkAboutPW CNT 02-03B/Cng Ord #1TO: Dorner-Stahl, InC. P. O. Box 129 Luxemburg, WI 54217 CHANGE ORDER # 1 DATED: December 1, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 02-03B is hereby amended NET DECREASE TO SECTION I - CONCRETE PAVING: $17,210.65) Recommended: Director of Public Wo~s CITY OF OSHKOSH ~ - '' ' City "" Cit9 C[~rk ./'" ~ .Approv and acc "-...~) I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Appr/~ved as to forte: City Attorney _ v CONTRACT: 02-03B CHANGE ORDER# 1 SECTION I - CONCRETE PAVING ITEM DESCRIPTION CONTRACT NUMBER QUANTITIES INSTALLED QUANT/T/ES NET INCREASE NET DECREASE COST PER INCREASE IN CONTRACT UNIT PRICE PR CE lB. Approx. 1,260 square ~,ards of pavement removal, complete as specified, per square yard 1,260.00 984.80 -275.20 $5.00 ($1,376.00 2B. Approx. 10,225 square feel of sidewalk and driveway removal, complete as specified, per square foot 10,225.00 10,310.00 85.00 $0.45 $38.25 3B. Approx. 4,800 cubic yards ~f excavation, complete as specified, per cubic yard 4,800.00 4,274.40 -525.60 $5.00 ($2,628.00 4B. Approx. 8,180 square ards of 7" non-reinforced :oncrete pavement, including integral curb, 5" base material & grading, :omplete as specified, per square yard 8,180.00 8,159.20 -20.80 $20.00 ($416.00) 5B. Approx. 445 linear feet of 12" radius curb & head, complete as specified, per linear foot 445.00 442.40 -2.60 $10.00 ($26.00) 6B. Approx. 235 linear feet of standard 30" curb & gutter, complete as specified, per linear foot 235.00 247.10 12.10 $20.00 $242.00 7B. No Bid Item aB. Approx. 2,785 square feet Df 4" concrete sidewalk, complete as specified, per square foot 2,785.00 3,064.60 279.60 $2.40 $671.05 9B. Approx. 9,680 square feet Df 6" concrete sidewalk & driveway, complete as specified, per square foot 9,680.00 10,154.80 474.80 $2.80 $1,329.44 10B. No Bid item 11B. Approx. 635 square yards of 3" asphaltic concrete transition, complete as specified, per square yard 635.00 649.70 14.70 $19.00 $279.30 12B. &pprox. 875 square yards of 5" asphaltic concrete transition, complete as specified, per square yard 875.00 976.90 101.90 , $20.00 $2,038.00 Page 1 CONTRACT: 02-03B CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 13B. Furnish and install approx. 1,925 tons of crushed stone base course, complete as specified, per ton 1,925.00 0.00 -1,925.00 $8.5C ($16,362.50 14B. Approx. 640 linear feet of sawing, complete as specified, per linear foot 640.00 304.30 -335.70 $2.05 ($688.191 15B. No Bid Item 16B. Adjustapprox. 53 manholes and inlets, complete as specified, each 53.00 53.00 $230.00 17B. Furnish and install approx. ¢ trees, complete as specified, each 4.00 3.00 -1.00 $400.00 ($400.00) 18B. No Bid Item 19B. F~emove approx. 36 I.D. of [rees and stumps, ;omplete as specified, per inch diameter 36.00 40.00 4.00 $22.00 $88.00 20B. No Bid Item 21B. Terrace work on Powers Street, complete as specified, lump sum 1.00 1.00 $13,000.00 SECTION I - (BID ITEMS lB - 2t B) - SUB-TOTALS $4,686.04 ($21,896.69) NET DECREASE TO CONTRACT: ($'17,2'10.65) Page 2