HomeMy WebLinkAboutPW CNT 02-03A/Cng Ord #4TO: Dorner-Stahl, Inc. P. O. Box 129 Luxemburg, WI 54217-0129 CHANGE ORDER# 4 DATED: December 1, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 02-03A , is hereby amended NET DECREASE TO SECTION I - CONCRETE PAVING: ($57,088.43) Recommended: Director of Public vvorks CITY OF OSHKOSH (~ity,Ma.na~ - City clerk Approv nd ac ' ~Entr~ctor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller City A"tter~e~ CONTRACT: 02-03A CHANGE ORDER # 4 SECTION I - CONCRETE PAVING ITEM DESCRIP~ON CONTRACT NUMBER QUAN~ES INSTALLED QUAN~ES NET INCREASE NET DECREASE COST PER INCREASEPRICE IN UNIT CONTRACT DECREASE ~ CONTRACT PRICE lA. Approx. 4,700 square ~ards of pavement removal, complete as specified, per square yard 4,700.00 4,960.60 260.60 $3.00 $781.80 2A. ~,pprox. 47,550 square feel 3f sidewalk and driveway removal, complete as specified, per square foot 47,550.00 50,361.55 2,811.55 $0.40 $1,124.62 3A. ~,pprox. 20,880 cubic yards 3f excavation, complete as specified, per cubic yard 20,880.00 19,507.10 -1,372.90 $5.00 ($6,864.50 4A. ~,pprox. 34,315 square 'ards of 7" non-reinforced concrete pavement, including integral curb, 5" base material & grading, complete as specified, per square yard 34,315.00 34,422.90 107.90 $20.00 $2,158.00 5A. Approx. 1,510 linear feet of 12" radius curb & head, complete as specified, per linear foot 1,510.00 1,470.30 -39.70 $5.00 ($198.50) 6A. Approx. 1,630 linear feet of standard 30" curb & gutter, complete as specified, per linear foot 1,630.00 1,584.60 -45.40 $8.00 ($363.20) 7A. Approx. 10 linear feet of 6" x 18" curb, complete as specified, per linear foot 10.00 11.40 1.40 $15.00 $21.00 SA. Approx. 32,075 square feet of 4" concrete sidewalk, complete as specified, per square foot 32,075.00 33,546.00 1,471.00 $2.35 $3,456.85 9A. Approx. 32,075 square feet of 6" concrete sidewalk & driveway, complete as specified, per square foot 32,075.00 30,241:60 -1,833.40 $2.80 ($5,133.52 10A. Approx. 575 square yards of 3" thick asphaltic concrete driveway, complete as specified, per square yard 575.00 546.00 -29.00 $23.80 ($690.20) Page 1 CONTRACT: 02-03A CHANGE ORDER # 4 INCREASE IN DECREASE IN i ITEM CONTRACT INSTALLED NET NET COST PER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 11A. Apprex. 1,210 square yards of 3" asphaltic concrete transition, complete as specified, per squareyard 1,210.00 1,201.40 -8.60 $18.75 ($161.25)! 12A. Approx. 475 square yards of 5" asphaltic concrete transition, complete as specified, per square yard 475.00 480.30 5.30 $24.25 $128.53 13A. Furnish and insta[iapprox. 14,500 tons of crushed stone base course, complete as specified, per ton 14,500.00 8,330.30 -6,169.70 $8.25 ($50,900.03) 14A. Approx. 3,280 linear feet of sawing, complete as specified, per linear foot 3,280.00 3,245.50 -34.50 $2.05 ($70.73) 15A. Furnish and install approx. 610 pavement ties, complete as specified, each 610.00 511.00 -99.00 $6.00 ($594.00) 16A. Adjust approx. 190 manholes and inlets, complete as specified, each 190.00 185.00 -5.00 $230.00 ($1,150.00) 17A. Furnish and install approx. 10 trees, complete as specified, each 10.00 10.00 $400.00 18A. Remove approx. 35 i.D. of stumps, complete as specified, per inch diameter 35.00 52.00 17.00 $20.00 $340.00 19A, Remove approx. 175 I.D. of trees and stumps, complete as specified, per inch diameter 175.00 239.30 64.30 $19.00 $1,221.70 20A. Furnish and install approx. 660 linear feet of No. 4 reinforcing bars, complete as specified, per linear foot 660.00 360.00 -300.00 $0.65 ($195.00) 21A. Terrace work on Bay Street, complete as specified, lump sum 1.00 1.00 $4,560.00 22A. Terrace work on Cleveland Avenue, complete as specified, lump sum 1.00 1.00 $3,868.00 23A. Terrace work on Dove Street, complete as specified, lump sum 1.00 1.00 $9,085.00 Page 2 CONTRACT: 02-03A CHANGE ORDER # 4 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 24A. Terrace work on Huron Avenue, complete as specified, lump sum 1.00 1.00 $7,204.00 25A. Terrace work on Josslyn Street, complete as specified, lump sum 1.00 1.00 $17,605.00 26A. Terrace work on Oak Street, complete as specified, lump sum 1.00 1.00 $2,758.00 27A. Terrace work on Tennessee Avenue, complete as specified, lump sum 1.00 1.00 $6,954.00 SECTION I - (BID ITEMS 'IA- 27A) - SUB-TOTALS $9,232.50 ($66,320.93) ADDITONAL WORK REQUIRED: C.C. # 'I - SECTION I - CONCRETE PAVING ITEM DESCRIPTION CONTRACT NUMBER QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COST PER INCREASEPR/CE IN UNIT CONTRACT DECREASE~ CONTRACT 1. Additional concrete paving replacement on Taft Avenue, from Josslyn St. t¢ Bauman St. 1-A. Pavement removal, per sq. /ard 986.80 986.80 $3.00 1-B. New 7" non-reinforced concrete pavement including integral curb and grading (base in place), per sq. yard 986.80 986.80 $20.00 1-C. Concrete sawing,per lin. ft. 177.60 177.60 $2.05 1-D. Pavement ties 60.00 60.00 $6.00 ADDITIONAL WORK: C.C. # 1 - (ITEMS lA -1D) - SUB-TOTAL NET DECREASE TO SECTION I - $0.00 $57,088.43) $57,088.43) $0.00 NET DECREASE TO CONTRACT: Page 3