Loading...
HomeMy WebLinkAbout04-72.docMARCH 23, 2004 04-72 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT 03-03 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: JAMES CAPE & SONS COMPANY 6422 N, Hwy, 31 PO Box 044580 Racine, WI 53404-7012 Net Increase to contract: $60,466.87 PURPOSE: See attached Change Order BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 313-0410-7480-00000- Sewer Separation Fund Expenditures Acct. No. 317-0410-7480-03302 - Special Assessments - Sewer Acct. No. 317-0410-7480-03303 - Special Assessments - Water Acct. No. 317-0410-7480-03305 - Special Assessments -- Storm Acct. No. 541-1910-1799-00000 - Water Utility - Construction in Progress Acct. No. 551-1910-1799-00000 - Sewer Utility - Construction in Progress TO: James Caae & Sons Co. 6422 N. HWY 31 P O. Box 044580 Racine, Wi 53404-7012 CHANGE ORDER # t DATED: March 8. 2004 Your oresent contract with the City of Oshkosh, Contract Nc and changed as foltows: 03-03 . is hereby amended NET INCREASE TO SECT ON tl - STORM SEWER: NET NCREASE TO SECTION Ill- SANITARY SEWER: NET INCREASE TO SECTION IV - WATER MAIN NET INCREASE TO CONTRACT: $9,013.38 $23.975.23 $27.478.26 $60,466.87 Recommendeo: BY: CITY OF OSHKOSH City Manager City Clerk App{oved ~d~ accepted: / ' 0'ontra¢'or certify that provision has been made to pat [ne liabitit, that will acc¢'ue to the City of Oshkosn. Wisconsin under the within Change Order Approved as to form: Comotroller City Attorney CONTRACT: 03-03 CHANGE ORDER # 1 SECTION II - STORM SEWER ITEM NUMBER CONTRACT QUAN~TIES INSTALLED QUANTITIES NET INCREASE NET COSTP~R UNIT INCREASEIN CONTRACT PRIOE DECREASE IN CONTRACT PRICE 56. Furnish and install approx. 110 linear feet of 6" Storm Sewer, complete as specified, per linear foot 110.00 96.00 -14.00 $23.00 ($322.00 57. Furnish and install approx. 150 linear feet of 8" Storm Sewer, complete as specified, per Iinear foot 150.00 123.92 -26.08 $23190 ($623.31 58. Furnish and install approx. 55 linear feet of 10" Storm Sewer, oompIete as specified, per linear foot 55.00 57.22 2.22 $38.85 $85.80 59. Furnish and instalt approx. 4,080 tinear feet of 12" Storm Sewer, complete es specified, per Iinear foot 4,080.00 4,417.71 337.71 $37.10 $12,529.04 60. Furnish and install approx. 1,020 linear feet of 15" Storm Sewer, complete as specified, per iinearfoot 1,020.00 1,005.66 -14.34 $38.10 ($546.35) 61. Furnish and install approx. 60 linear feet of 15" CMP Storm Sewer, complete as specified, per linear foot 60.00 65.00 5.00 $35.50 $177.50 62. Furnish and install approx. 165 linear feet of 18" Storm' ~ ~ Sewer, complete as specified, per linear foot 165.00 ~0.00 -85.00 $38.25 ($3,251.25) 63. Furnish and install approx. 140 linear feet of 21" Storm Sewer, complete as specified, per linear foot 140.00 78.80 -61.20 $45.55 ($2,787.66) 64. Furnish and instatl approx~ six (6) std. Inlets (Type 1 with 18" sump) with castings, complete as specified, each 6.00 5.00 -1.00 $900.00 ($900.00) 65. Furnish and install approx. 33 std. Inlets (Type 3 with 18" sump) with castings, 2omplete as specified, leach 83.00 84.00 1.00 $1,000.0C $1,000.00 66. Furnish and install approx. two (2) std. Inlets (Type 3 with 18" sump) without castings, complete as specified, each 2.00 2.00 I I I $800.00 Page 1 CONTRACT: 03-03 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM CONTRACT i INSTALLED NET NET COSTPER NUMBER DESCRIPTION QUANTITIES I QUANTITIES INCREASE DECREASE UNiT CONTRACT CONTRACT PRICE PRICE 67. Furnish and install approx. 63.00 vertical feet of std. Storm Manhole (4' Inside Diameter) in 18 locations without castings, complete as specified, per vertical foot 63.00 63.13 0.13 $260.00 $33.80 68. Furnish and install approx. 24.00 vertical feet of std. Storm Manhole (5' inside Diameter) in six (6) ~ocations without casfir~gs, ;complete as specified, per pertical foot 24.00 23.I 7 -0.83 $460.00 ($381.80) 69. Furnish and install approx. 11.50 vertical feet of std. Storm Inlet Manhole (4' Inside Diameter) in three (3) locations with casting, complete as specified, per ver[ical foot 11.50 11.40 -0.10 $410.00 ($41.00) 70. Furnish and install approx. 9.0 vertical feet of Box Storm Inlet Manhole in two (2) locations, with casting, complete as specified, per vertical foot 9.00 8.44 -0.56 ' $665.00 ($372.40 71. Reconstruct approx, five (5) Storm Manhole, complete as specified, ~ ~ leach ~ 5.001 5.00 $900.00 72; Reconstruct approx, one (1) Storm Box Manhole, complete as specified, each 1.00 1.00 $2,050.00 73. Rebuild approx. 15.50 vertical feet of Storm Manhole (4' Inside Diameter) in seven (7) Ipcations with base, complete as specified, per vertical foot 15.50 14.03 -1.47 $700.00 ($1,029.00) 74. Rebuild approx. 7.50 vertical feet of Storm Manhole (5' Inside Diameter) in one (I) location with base, complete as specified, per vertical foot 7.50 7.22 -0.28 $480.00 ($134.40) 75, Rebuild approx, two (2) std. Inlet (Type 3 with 18" sump) with casting, complete as specified, sach [ 2.00 2.00 $1,160.00 Page 2 CONTRACT: 03-03 CHANGE ORDER # 1 I INCR~ASEIN DECREASEIN ITEM CONTRACT INSTALLED NET NET COST PER NUMBER DESCRIPTION i CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PF~ICE PRICE 76. Furnish end install approx, 214 6" Storm Laterals, :omplete as specified, sach 214.00 208.00 -6.00 $750.00 ($4,500.00 77. =urnish and install approx· }ne (1) Neenah R-3067 :Inlet casting w/d~agonal grate, complete as specified, each 1.00 1.00 $350.00 78. Furnish and install approx. one (1) Neenah R-1976 Monument Frame w/solid lid, complete as specified, each 1.00 1.00 $150.00 79. Abandon approx. 83 Inlets or Manholes, complete as specified, each 83,00 83.00 $200.00 80. Provide $375.00 to the City of Oshkosh for project mana, gement communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION II - (BID iTEMS 56 - 80) - SUB-TOTALS $13,826.14 ($14,889.17) ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION NUMaER QUANTITIES DESCRIPTION NET INCREASE iNSTALLED QUANTITIES t [ CONTRACT NET COSTPER INOREASEiN DECREASE UNiT PR/CE DECREASE~ CONTRAOT PRICE I Reconstruct storm lead to inlet 163 on State Street after initial construction due to conflict with electric utiJit7 (6/17/03) 1.00 1.00 $1,231.13 $1,231.13 2 Resaw new hole in inlet #169 after routing changed (6/17/03) %00 1.00 $369.34 $369.34 3 Repair previously damaged 15" storm sewer on State Street at Ceape Avenue, and relay inlet leads due to changed ptans (6/20/03) 1.00 1.00 $2,393.58 $2,393.58 4 insulate neyv inlet lead to inlet #194 on Vinland Street, and saw new hole lin inlet Ct 194 due to changed design (6/23/03) ~ 1.00 1.00 r i $442.47 $442.47 Page 3 CONTRACT: 03-03 CHANGE ORDER # 1 INCREASE IN DECREASE IN iTEM CONTRACT iNSTALLED NET NET COSTPER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 5 Relocate existing 2' x 3' inlet on Sharratt Steet to fit new alignment (6/30/03) 1.00 1.00 $590.3'~ $590.31 6 Reconnect existing storm lateral to 1757 Doty Street behind sidewalk (7/22/03) 1.00 1.00 $78.75 $78.75 7 Labor to dewater 36" storm sewer on E. Irving Avenue and Grove Street, and extra labor to install new 15" storm sewer at lower rede due to conflict with existing gas and sanitary sewer (8/28/03) 1.00 1.00 $2,855.48 $2,855.48 8 nstalled storm lead from mh 133 to inlet 131 at Melvin Ave5ue and N. Main Street and then had to abandon because of conflict with telephone lines (816103) 1,00 1.00 $1,771.50 $1,771.50 9 Cost to core opening for 12" storm lateral into mh 7/182 on W, Parkway I Avenue 1.00 1.00 $343.85 $343.85 ADDITIONAL WORK: C.C. # 1 - qTEMS I - 9 - SUB-TOTAL $10.076.41 NET INCREASE TO SECTION l[ - $9.013.38 - $0.00 SECTION Ill - SANITARY SEWER ITEM DESCRIPTION OONTRAOT INSTALLED NUMBER I QUANTITIES QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREASE IN CONTRAOT PRICE DECREASE~ CONTRACT PRICE 81. Furnish and install approx. 6,650 linear feet of 8" Sanitary Sewer Relay, complete as specified, per linear foot 6,650.00 6,645.18 -4.82 $51.10 ($246.30) 82. Furnish and install approx, 15 linear feet of 10" Sanitary Sewer Relay (N. Main Street), complete es specified, per tinear foot 15.00 18.00 3.00 $119.15 $357.45 83. =urnish and instalI approx. 253 Iinear feet of 18" Sanitary Sewer Relay i [ (State Street), complete as $71.00 specified, per linear foot 253,00 359.58 106.56 $7,565.76 CONTRACT: 03-03 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COSTPER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 84. Furnish and install approx. 210 vertical feet of std. Sanitary Manhole (4' Inside Diameter), complete as specified, without casting, ~er vertical foot 210.00; 209.66 -0.34 $165.00 ($56.10) 85. Furnish and install approx. 10 vertical feet of std. Sanitary Manhole (5' Inside Diameter) in one (1) location, complete as specified, without casting, ~er vertical foot t0.00 10.00 $400.00 86. NO BID ITEM 87. Recanstruct approx, two (2) Sanitary Manholes, ~omplete as specified, ~ach 2.00 4.00 2.00 $900.00 $1,800.00 88. Reconnect approx. 30 Sanitary Laterals, completel as specified, each 30.00 ! 33,00 3.00 $350.00 $1,050.00 89. =urnish and install approx. 175 linear feet of new 4" ;Sanitary Lateral, complete as specified, per linear foot 75.00 81.00 6.00 $40.00 $240.00 90. Furnish and instatl approx. I 3,560 linear feet of 6" [ Sanitary Lateral Relay, complete as specified, per linear foot 3,560.00 3,'~64.16 -395.84 $41.00 :($16,229.44 91. Abandon approx, nine (9) Sanitary Manholes, complete as specified, each 9.00 11.00 2.00 $350.00 $700.00 92. Provide $375.00 to the City of Oshkosh for project management communications, complete I as specified, lump sum 1.00 1.00 $375.00 SECTION III - (BID [TENIS 81 - 92) - SUB-TOTALS $I1,713.21 ($16,531.84) ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION i NUMBER INSTALLED QUANTITIES NET INCREASE NET DECREASE OOBTPER UNIT INCREASE IN CONTRACT PRICE DECREASEIN CONTRACT PRICE Page 5 CONTRACT: 03-03 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNiT CONTRACT CONTRACT PF~ICE PRICE 1 Extra time to excavate and locate sanitary lateral for 130 State Street (6/17/03) 1.00 1.00 $1,257.90 $1,257.90 2 Repair existing sanitary manhote (mh 11/380)'at E. Parkway Avenue and Grove Street (7/29/03) 1.00 1.00 $119.70 $119.70 3 Drill and install new steps in reconstructed sanitary manhole (mh 11/380) on Grove Street (8/27/03) 1.00 1.00 $105.00 $105.00 4 Additional mobilization charge to reconstruct sanitary manhole (mh t4/t0) on W. 18th Avenue (8/27/03) 1.00 1.00 $105.00 $105.00 5 &dditonai labor to remove ~fd interceptor chamber 15' x 7' on W. 18th Avenue and Doty Street (7/1/03) 1.00 1.00 $1,102.50 $1,102.50 6 Extra excavation and gravel backfill on Melvin Avenue required due to storm trench falling into sanitary trench, lump sum 1.00 1.00 $3,931.37 $3,931.37 7 Extra tabo~ to pump water from sanitary sewer excavation at Guenther St. and Witz_el Avenue due to old storm drain not properly abandoned (619103) 1.00 1.00 $2,079.00 $2,079.00 8 Continue to seal & repair leaking storm system and slurry excavation of Guenther Street and WitzeI Avenue (6110103) 1,00 1.00 $2,934.75 $2,934.75 9 Dig and took for sanitary lateral for 235 Ida Avenue, Rotc Rooter called to jet lateral (7~8~03) 1.00 1.00 $3,222.45 $3,222.45 10 Cost to reroute sanitary lateral to 648 Frederick Street after partial relay 1.00 1.00 $979.65 $979.65 11 Cost to excavate one foot of rock for sanitary sewer relay on Minnesota Street $4,018.93 south of W. 16th Avenue 1,00 1.00 $4,018.93 Page 6 CONTRACT: 03-03 CHANGE ORDER # 1 ITEM CONTRACT INSTAtLED NET NET OOST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 12 Repaired existing 12" sanitary sewe~ on Minnesota Stree at W. 18th Avenue which was called to be abandoned but had to remain in service until laterals relaid to W. 12th Avenue 1.00 1.00 $1,867.32 $1,867.32 13 Form and repair existing 30" sanitary sewer at Minnesota St. and W. 16th !Avenue intersection prior to water main work (8/8/03)i 1.00 1.00 $2,643.38 $2,643.38 14 Relay 6" sanitary [ateraI for 303 W. 12th Avenue to discharge on W. 12th Avenue instead of Minnesota Street involving work behind sidewalk 1.00 1.00 $2,t47.62 $2,147.62 '~5 Refay 6" sanitary lateral for 257 W. 18th Avenue to discharge on W. 18th Avenue instead of Minnesota Street involving work behind sidewalk 1.00 1.00 $2,279.29 $2,279.29 ADDITIONAL WORK: C. 0. # 1 - (ITEMS 1 - 15) - SUB-TOTAL NET INCREASE TO SECTION Ill - $28,793.86 $0.00 $23,975,23 SECTION IV - WATER MAIN ITEM DESCRIPTION CONTRACT INSTALLED NET NET OOST PER INOREASE IN DECREASE IN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACTpR/CE CONTRACTpRiCE 93. IFurnish and install approx. ~ ;315 linear feet of 6" Ductile 'iron Water Main w/poty wrap, complete as specified (fittings not included), per t/near foot I 3'~5.00 315.25 0.25 $122.25 $30.56 94. Furnish and install approx. I 7,700 I/near feet of 8" 1 Ductile Iron Water Main / w/poly wrap, complete as specified (fittings not included), per linear foot 7,700.00 7,749.00 49.00 $56.50 $2,768.50 Page 7 CONTRACT: 03-03 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 95, Furnish and install approx. 60 linear feet of 12" Ductile iron Water Main w/poiy wrap, complete as specified, (fittings not included), per linear foot 60.00 69.50 9.50 $165.85 $1,575.58 98. .Furnish and install approx. 35 linear feet of '~ 8" Ductile Iron Water Main w?poty wrap, cQmptete as specified, (fittings no~t included), per linear foot 35.00 60.00 25.00 $216.75 $5,418.75 97. Reconnect approx, six (6), 1" Water Services, complete as specified, each 6.00 8.00 2.00 $350.0C $700.00 98. Reconnect approx, two (2), 1 1/4" Water Service Guenther Street), complete as specified, each 2.00 2.00 $450.00 99. Furnish and install approx. 4,340 linear feet of 1" Water Service (Relay and New), complete as specified, not including sorporation and stop box, ~er linear foot 4,340.00 4,575.80 235.80 $34.00 $8,017.20 100. i Furn sh and nstal approx. [30 iinear feet of 2" Water , ~ ~ !Service Relay, complete as specified, not including corporation and stop box, Bet linear foot 30.00 32.00 2.00 $40.00 $80.00 I01. Furnish and install approx. 182¢ I" corporation and stop box with rod, complete as specified, each 182.00 181.00 -1.00 $260.00 ($260.00 102. Furnish and install approx. one (1}, 2" corporation and; stop box with rod, complet( as specified, each 1.00 1.00 $500.00 103. Furnish and instail approx. one (1), 8" plug, complete as specified, each 1.00 1.00 $60.00 104. Furnish and install approx. two (2), 6" x 6" Tees, complete as specified, each 2.00 6.00 4.00 $195.00, $780 00 , Page 8 CONTRACT: 03-03 CHANGE ORDER # 1 [NCRI=ASN IN DECREASE IN ITEM CONTRACT INSTALLED N£T NET CQST PER NUMBER DESCRIPTION QUANTITI~S QUANTITIES INCREASE DECREASE UNIT OOMTRACT CONTRACT PF~ICE PRICE 105. Furnish and install approx. 13, 8" x 6" Tees, complete as specified, each 13.00 I3.00 $230.00 106. Furnish and install approx. two (2), 8" x 8" Tees, complete as specified, each 2.00 3.00 1.00 $220.00 $220;00 107. Furnish and install approx. ~ne (1), 4" x 4" Reducer, somplete as specified, sach 1.00 1.00 $130.00 108. Furnish and install approx. 14, 8"x6" Reducers, :omplete as specified, leach 14.00 15.00 1.00 $185.00 $185.00 109. iFumish and install approx. one (1), 18" x 12" Reducer complete as specified, each 1.00 2.00 1.00 $1,200.00 $1,200.00 110. Furnish and install approx. three (3), 8" x 8" Cross, complete as ~pecified, each 3.00 4.00 1.00 $300.00 $300.00 111. Furnish and install approx. one (1), 18" x 18" Cross, compIete as specified, each 1.00 1.00 $3,050.00 112. Furnish and instaII approx. 26, 6" - 45 degree Bends, complete as ~ ~ ' specified, each 26.0C 27.00 1.00 $320.00 $320.00 113. Furnish and install approx. 27, 8" - 45 degree Bends, complete as specified, each 27.00 18.00 -9.00 $375.00 ($3,375.00) 114. Furnish and install ~pprox. four (4), 12" - 45 degree Bends, complete as specified, each 4.00 4.00 $720.00 t15. Furnish and install approx. 17, 6" Valves, complete as specified, each 17.00 17.00 $630.00 116. Furnish and install approx. 31,8" Valves, complete as specified, each 31.00 33.00 2.00 $790.00 $1,580.00 117. Furnish and install approx. two (2), 12" Valves in std. Water Valve Manhole, compIete as specified, each 2.00 2.00 $6,840.00 Page 9 CONTRACT: 03-03 CHANGE ORDER'# 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT ~'RICE PRICE 118. Furnish and install approx. two (2), 18" Valves in std. Water Valve ManhoIe, complete as specified, each 2.00 2.00 $7,465.00 119. Furnish and install approx. one (1), 4" x 4" Tapping Valve and Sleeve, complete as spec f ed, each t.00 1.00 $1,160.00 120. Furnish and install approx. ~ive (5), 6" x 6" Tapping Valves and Sleeves, somplete as specified, each 5.00 2.00 -3.00 $1,385.00 ($4,155.00 121. Furnish and install approx. lone (1), 8" x 8" Tapping Valve and Sleeves, complete as specified, each 1.00 1.00 $1,650.00 122. Furnish and install approx. five (5), 12" x 8" Tapping Valves and Sleeves, complete as specified, each 5.00 4.00 -1.00 $t ,875.00 ($l ,875.00 123. Furnish and install approx. two (2), 18" x 6" Tapping Valves and Sleeves, complete as specified, r. _ each 2.00 2.00 , r $2,300.00~ i24. Furnish.and install approx. ' 16 Hydrants, complete as specified, each 16.00 16.00 $1,700.00i 125. Approx. 560 square yards of 3" hot-mixed asphalt ~avement replacement Bismarck Avenue), .~omplete as specified, per square yard 560.00 332.90 -227.10 $19.61 ($4,453.43 126. &bandon 6" Water Main on Bismarck Avenue, complete as specified, lump sum 1.00 1.00 $1,500.00 127. Abandon 6" Water Main on Central Street, complete as specified, lump sum 1.00 1.00 $2,850.00 128. Abandon 4" Water Main on Cleveland Avenue, complete as specified, lump sum 1.00 1.00 $1,000100 Page 10 ' CONTRACT: 03-03 CHANGE ORDER # I ITEM CONTRACT INSTALLED NET NET OOST PER INCREASE IN DECREAS£1N NUMBER DESCRIPTION QUANTITIES QUANTITIES iNCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 129. Abandon 4" Water Main on Frederick Street, complete as specified, lump sum 1.00 1.00 $1,500.00 I30. Abandon 4"- 6" Water Main on Grave Street, complete as specified, lump sum 1.00 1.00 $I,500.00 131. Abandon 6" Water Main on Suenther Avenue, ~complete as specified, lump sum 1.00 1.00 $1,000.00 132. Abandon 8" Water Main on Ida Avenue, complete as specified, lump sum 1.00 1.00 $800.00 133. Abandon 6" Water Main on W. Melvin Avenue, complete as specified,, lump sum 1.00 1.00 $2,000.00 134. Abandon 8" Water Main on Minnesota Street, complete as specified, lump sum 1.00 1.00 $3,000.00 135. Abandon 6" Water Main on W. 18th Avenue, complete as specified, lump sum 1.00 1.00 $3,000.00 · 136. Provide $375.00 t~ the City of Oshkosh for project management communications, complele as specified, lump sum L 1.00 1.00 $375.00l SECTION IV - (BID ITEMS 93 - I36) - SUB-TOTALS $23,175.59 ($14,118.43) ADDITONAL WORK REQUIRED: C.O. # 1. SECTION IV ITEM NUMBER CONTRACT QUAN~T/ES iNSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREA SE IN CONTRACT PRICE DECREASEIN CONTRACT PRICE Expose and backfill water main on State Street for Water Department to disconnect and reconnect the water sen/ice to the Post Office and move existing shut off out of r ainline pour, lump sum 1.0 1.00 $820.80 $820.80 Page 11 CONTRACT: 03-03 CHANGE ORDER # 1 iTEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES iNCREASE DECREASE UNiT CONTRACT CONTRACT PR/CE PRIOE 2 Move fire hydrant back to avoid new pavement on Vinland Street (no bid item (6/30/03) 1,00 %00 $2,154.60 $2,154.60 3 Reconnect existing water main to west at 18th Avenue and Oregon Street which was not planned 7/23/03) 1.00 1.00 $1,033.20 $1,033.20 4 Excavated two holes on iservice to 642 Evans 'Street and reptaced stop box only (not retaid as planned) (8/13/03) 1.00 1.00 $897.20 $697.20 5 investigated and uncovered service connection to old Mercy Hospital site to determine which water main was tapped, per Jim Wolf (8/21/03) 1.00 1.00 $469.35 $469.35 6 Repair water service to 681 Grove Street that was unknown at the time (8/26/03) 1.00 1.00 $661.50 $661.50 7 Additional gravel backfill required due to proximity of new telephone duct construction which increased backfill needs on Central Street, 155.55 sq ~ i yds of gravel @ $10/yd + 10% profit mar,qin 1.00 1.00 $1,633.28 $1,633.28 8 Additional tabor required to cut in 6" x 6" tee at P,rospect Avenue and Central Street and install rods and me,ga lugs 1.00 '~ ,00 $974.40 $974.40 9 Extra labor to dig under new telephone duct system which was installed over existing 6" water on Centra Street which was to be abandoned for new connections (9/10/03) 1.00 1.00 $875.70 $875.70 10 Extra labor to-abandon old 6" water main at Central Street and Scott Avenue which was found to be deeply intertwined with old telephone ducting that required extensive hand digging (9/11/03) 1.00 1.00 $1,751.40 $1,751.40 Page 12 CONTRACT: 03-03 CHANGE ORDER # 1 iTEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNiT PRICE PRICE 11 Repair 4" water main stub on Guenther Street north of Bismark that was not marked (6127103) t .00 1.00 $1,002.75 $1,002.75 12 Replaced curb box and rod at 214-216, 224-226, and 225 Guenther Street as directed by Jim Wolf (7/24103) 1,00 1.00 $976.50 $976.50 13 ~Pull rock for 8" water main relay on Minnesota Street south of W. 16th Avenue 1.00 1,00 $2,793.00 $2,793.00 14 Abandon existing hydrant near 1832 Minnesota Street, not shown on plans 1.00 1.00 $175.56 $175.56 15 Extra ,4" fittings and pipe to reconnect existing 4" water main at Minnesota Street and W. 16th Avenue 1.00 1.00 $1,463.38 $1,463.38 16 Extra costs to extend water services on west side of Frederick Street from W. $938.48 Parkway Avenue to Ida 1.00 1.00 $938.48 ADDITIONAL WORK: c.c. # 1 (ITEMS I - I5) - SUB-TOTAL NET INCREASE TO SECTION IV - $18,421.10 $0.00 $27,478.26 NET INCREASE TO SECTIONS Il, [I1, IV NET DECREASE TO SECTIONS Il, III, IV $106,006.31 ($45,539.44) NET INCREASE TO CONTRACT: $60,466.87 Page13