Loading...
HomeMy WebLinkAbout04-26FEBRUARY 10, 2004 04-26 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: INITIATED BY: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT NO. 01-16 DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: MCC, INC. PO Box 1137 Appleton, WI 54912-1137 Net decrease to contract: ($37,923.85) PURPOSE: See attached Change Order. TO: MCC, Inc. P. O. Box 1137 Appleton, WI 54912-1137 CHANGE ORDER # 1 DATED: January 16, 2004 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET DECREASE TO SECTioN I - ASPHALT PAVING: NET DECREASE TO CONTRACT: 01-16 , is hereby amended ($37,923.85) ($37,923.85) Recommended: BY: CITY OF OSHKOSH City Manager City Clerk App, roved and accepted: Cb~r~ctbr I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 01-16 CHANGE ORDER # 2 SECTION I - ASPHALT PAVING ITEM NUMBER DESCRIPTION NET INCREASE NET DECREASE COSTPER INCREASEINcoNTRACT UNIT PR CE DECREASE IN CONTRACT PRICE Approx. 250 square feet of sidewalk and driveway 1. removal, complete as specified, per square foot 250.00 258.00 8.00 $1.90 $15.20 Approx. 15 lin. feet of 30" 2. =urb & gutter removal and replacement, complete as specified, per lin. ft. 15.00 26.70 11.70 $35.00 $409.50 Approx. 1,000 cubic yards 3. af excavation, complete as specified, per cubic yard 1000.00 480.00 -520.00 $4.95 ($2,574.00) Approx. 10 square yards of concrete pavement 4. removal for 1 1/2" butt ioint, complete as specified, per sq. yd. 10.00 10.00 $45.00 Approx. 7,500 square ards of asphaltic 5. ~avement milling, :omplete as specified, per sq. yd. 7500.00 6,751.60 -748.40 $2.06 ($1,541.70) Approx. 7,800 square ards of asphaltic 6. ~avement pulverizing, =omplete as specified, per sq. yd. 7800.00 7,700.00 -100.00 $0.65 ($65.00) Approx. 2,770 tons of 7. asphaltic concrete binder material, complete as specified, perton 2770.00 2,316.00 -454.00 $26.23 ($11,908.42 Approx. 1,950 tons of 8. asphaltic concrete surface ~naterial, complete as specified, per ton 1950.00 1,685.80 -264.20 $29.48 ($7,788.62 Approx. 230 square feet of ~" concrete sidewalk, 9. 2omplete as specified, per !sq. ft. 230.00 258.00 28.00 $8.75 $189.00 iNo Bid Quantity - 0 square 10. feet 0.00 0.00 $0.00 ~Approx. 1,900 square 11. yards salvaged ashpaltic 3avement, completed as specified, per sq. yd. 1900.00 1,900.00 $2.51 Approx. 1,800 tons extra crushed stone base, 12. complete as specified, per ton 1800.00 762.80 -1,037.20 $9.38 ($9,728.94) Page 1 CONTRACT: 01-16 CHANGE ORDER # 2 INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE Approx. 150 linear feet of 13. sawing, complete as specified, perlin, foot 150.00! 130.70 -19.30 $2.0C ($38.60', Adjust approx. 12 14. manholes and inlets, ;omplete as specified, aach 12.00 16.00 4.00 $140.00 $560.00 15. No Bid Quantity 0.00 0.00 $0.00 Preparation of foundation for asphalt paving at Fire 16. Station #15 parking lot, somplete as specified, lump sum 1.00 1.00 $1,960.00 Preparation of foundation 17. for asphalt paving on Mason Street, complete as specified, lump sum 1.00 1.00 $1,960.00 Preparation of foundation for asphalt paving on S. 18. Washburn Street, =omplete as specified, lump sum 1.00 1.00 $4,200.00 Preparation of foundation for asphalt paving on W. Waukau Avenue (Wisc. 19. Central Ltd. RR to Fox River Valley RR), complete as specified, lump sum 1.00 1.00 $2,800.00 Preparation of foundation for asphalt paving on W. 20. Waukau Avenue (Fox River Valley RR to Fond du Lac Road), complete as specified, lump sum 1.00 1.00 $1,960.00 Preparation of foundation For asphalt paving at Wastewater Treatment 21. Plant parking lot, complete as specified, lump sum 1.00 1.00 $2,100.00 SECTION I - (BID ITEMS I - 21) - SUB-TOTALS $1,173.70 ($33,645.28) CONTRACT ADJUSTMENT: C.C. # 1 - SECTION I ITEM NUMBER DESCRIPTION CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET COSTPER DECREASE UNIT INCREASEIN CONTRACT PRICE DECREASEIN CONTRACT PRICE 1 Pavement Density Deficiency ($2,252.27) Page 2 CONTRACT: 01-16 CHANGE ORDER # 2 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 2 Pavement Density Deficiency Testing Services ($3,200.00) CONTRACT ADJUSTMENT: C.O.# 1 -(ITEMS I -2) NET DECREASE TO SECTION I - $0.00 ($5,452.27) ($37,923.85) NET DECREASE TO CONTRACT: ($37,923.85) Page 3