Loading...
HomeMy WebLinkAbout04-06JANUARY 13, 2004 04-06 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: INITIATED BY: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT 03-09 DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: DeKeyser Construction Co., Inc. 522 Clement Street Green Bay, WI 54302 Net Decrease to contract: ($8,242.06) PURPOSE: See attached Change Order. TO: DeKeyser Construction Co., Inc. 522 Clement Street Green Bay, WI 54302 CHANGE ORDER # 1 DATED: December 30, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 03-09 , is hereby amended NET INCREASE TO SECTION I- SANITARY SEWER NET INCREASE TO SECTION II - ,,NATER MAIN NET DECREASE TO SECTION Ill - STORM SEWER NET DECREASE TO CONTRACT: $378.93 $0.00 ($8,620.99) ($8,242.06) Recommended: _ Director of Publi~; Works BY: CITY OF OSHKOSH City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ApproVed as to form: Comptroller City Attorney CONTRACT: 03-09 CHANGE ORDER # 1 SECTION I - SANITARY SEWER ITEM NUMBER DESCRIPTION NET INCREASE NET DECREASE COSTPER UNIT INCREASEIN DECREASEIN CONTRACT CONTRACT PRICE PRICE 1. Furnish and install approx; 35 linear feet of 8" Sanitary Sewer Relay (Kirkwood Drive), complete as specified, per linear foot 35.00 32.80 -2.20 $81.75 ($179.85) 2. Furnish and install approx. 20 vertical feet of std. Sanitary Manhole (4' inside Diameter) in two (2) ocations, without castings, ;omplete as specified, per vertical foot 20.00 18.98 -1.02 $211.00 ($215.22 SECTION I - (BID ITEMS 1 - 2) - SUB-TOTALS $0.00 ($395.07) ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION I - SANITARY SEWER ITEM DESCRIPTION CONTRACT NUMBER QUANTITIES INSTALLED NET NET QUANTITIES INCREASE DECREASE COSTPER U~T CONTRACT PRICE DECREASE IN CONTRACT PRICE 1 Raise existing sanitary manhole at Cherry Park Ct. and HWY "45", lump sum 1.00 1.00 $774.00 ADDITIONAL WORK: C.C.# 1 -(ITEM 1) -SUB-TOTAL NET INCREASE TO SECTION I - $774.00 ,$774.00 $0.00 $378.93 SECTION II - WATER MAIN ITEM NUMBER DESCRIPTION CONTRACT INSTALLED QUANTITIES QUANTITIES NET NET INCREASE DECREASE COSTPER UNIT ~CREASEIN CONTRACT PRICE DECREASE~ CONTRACT PRICE 3. Furnish and install approx. 15 linear feet of 6" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not incuded), per nearfoot 15.00 63.00 48.00 $120.00 $5,760.00 Page 1 CONTRACT: 03-09 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 4. Furnish and install approx. 615 linear feet of 8" Ductile Iron Water Main Relay w/poly wrap (Punhoqua Street), complete as specified, including asphalt )avement restoration, (fittings not included), per linear foot 615.00 616.00 1.00 $72.50 $72.50 5. Furnish and install approx. 680 linear feet of 8" Ductile iron Water Main Relay w/poly wrap (W, 19th Avenue), complete as specified, including asphalt ~avement restoration, fittings not included) per linear foot 680,00 673.00 -7.00 $66.25 ($463,75) 6. Furnish and install approx. 805 linear feet of 10" Ductile Iron Wa[er Main ~v/poly wrap (Emmers Lane), complete as specified, (fittings not included) per linear foot 805.00 809.50 4.50 $55.50 $249.75 7. Furnish and bore/jack approx. 165 linear feet of 18" Steel Casing Pipe [Hwy. 21 crossing), complete as specified, per :linear foot 165.00 162.00 -3.00 $224.00 ($672.00) 8. Relay approx. 15 linear feet of S" Water Main (Kirkwood Drive), complete as specified (with fittings), lump sum 1.00 0.00 -1.00 $7,500.00 ($7,500.00 9. Relay and lower 8" Water Main (Hwy. 45), complete as specified (with fittings), lump sum 1.00 1.00 $7,175.00 10. Furnish and install approx. 110 linear feet of 1" Water I Service (Relay and New), complete as specified, not including corporation and stop box, per linear foot 110.00 164.00 54.00 $60.25 $3,253.50 11. Furnish and install approx, i seven (7), 1" corporation and stop box with rod, complete as specified, each 7.00 9.00 2.00 $225.00 $450.00 Page 2 CONTRACT: 03-09 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER NUMBER ! QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT I PRICE PRICE 12. Reconnect approx, three (3), 1" Water Services, complete as specified, each 3.00 2.00 -1.00 $300.00 ($300.00) 13. Lower approx, two (2), 1" Water Services (Hwy. 45), complete as specified, each 2.00 2.00 $500.00 14. Furnish and install approx. [wo (2), 6" x 6" Tees, complete as specified, each 2.00 3.00 1.00 $150.00 $150.00 15. Furnish and install approx. [hree (3), 8" x 6" Tees, complete as specified, each 3.00 4.00 1,00 $180.00 $180.00 16. Furnish and install approx, three (3) 10" x 6" Tees, complete as specified, each 3.00 3.00 $236.00 17. Furnish and instal[ approx. tour (4), 8" x 6" Reducers, complete as specified, each 4.00 4.00 $110.00 18. Furnish and install approx. ene (1), 10" x 6" Reducer, complete as specified, each 1.00 1.00 $185.00 19. Furnish and install approx. 2ne (1), 6" - 90 degree Bend, complete as specified, each 1.00 0.00 -1.00 $170.00 ($170.00) 20. Furnish and install approx. 3ne (1), 8" - 90 degree Bend, complete as specified, each 1.00 1.00 $202.00 21. Furnish and install approx. six (6), 6" - 45 degree Bends, complete as specified, each 6.00 7.00 1.00 $143.00 $143.00 22. Furnish and install approx. ~o (2), 10" - 45 degree IBends, complete as specified, each 2.00 3.00 1.00 $232.00 $232.00 23. Furnish and install approx. five (5), 6" Valves, complete as specified, each 5.00 6.00 1.00 $606.00 $606.00 24. Furnish and install approx. three (3), 8" Valves, complete as specified, each 3.00 4.00 1.00 $802.00 $802.00 Page 3 CONTRACT: 03-09 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COSTPER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 25. Furnish and install approx. two (2), 10" Valves, compJete as specified, each 2.00 2.00 $1,108.00 26. Furnish and install approx. one (1), 6" x 6" Tapping Valve and Sleeve, complete as specified, each 1.00 1.00 $2,000.001 27. Furnish and install approx. one (1), 12" x 10" Tapping Valve and Sleeve, complete as specified, each 1.00 1.00 $3,435.001 28. Furnish and install approx. two (2) Hydrants, complete as specified, each 2.00 2.00 $1,593.001 29. Abandon 6" Water Main on Punhoqua Street, complete as specified, lump sum 1.00 1.00 $750.00 30. Abandon 3" - 6" Water Main on W. 19th Avenue, complete as specified, lump sum 1.00 1.00 $2,000.00 31. Remove and replace approx. 45 square yards of 3" hot-mixed Asphalt Pavement (Hwy. 45), complete as specified, per square yard 45.00 0.00 -45.00 $17.50 ($787.50 32. Provide $200.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $200.00 SECTION II - (BID ITEMS 3 - 32) - SUB-TOTALS $11,898.75 ($9,893.25) ADDITONAL WORK REQUIRED: C.C. # '1 - SECTION II - WATER MAIN ITEM DESCRIPTION CONTRACT INSTALLED NUMBER QUANTITIES QUANTITIES NET NET INCREASE DECREASE COSTPER UNIT INCREASE~ CONTRACT PRICE DECREASE ~ CONTRACT PR/CE I E~ra excavation and gravelplacementon Punhoqua St. dueto poor so condton, umpsum 1.00 1.00 $1,440.50 $1,440.50 Page 4 CONTRACT: 03-09 CHANGE ORDER # 1 INCREASE IN DECREASE IN iTEM CONTRACT I INSTALLED NET NET COST PER DESCRIPTION CONTRACT CONTRACT YUMBER QUANTIT ESI QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 2 Insulate existing water main on Kirkwood Dr. instead of main lowering, lump sum 1.00 1.00 $1,147.00 $1,147.00 3 Credit for asphalt ~avement replacement on Punhoqua St. which was deleted from contract ($4,788.00 4 Furnish and install one (1) 8", 1/8 bend 1.00 1.00 $195.00 $195.00 ADDITIONAL WORK: c.c. # 1 - (ITEMS 1 -3) - SUB-TOTAL $2,782.50 ($4,788.00) NET DECREASE TO SECTION Il - $0.00 SECTION Ill - STORM SEWER ITEM DESCRIPTION CONTRACT NUMBER QUANTITIES INSTALLED QUANTITIES NET ~CREASE NET DECREASE COSTPER UNIT INCREASEINi CONTRACT PRICE DECREASE~ CONTRACT PRICE 33. Furnish and install approx. 230 linear feet of 6" Mini- ;torm Sewer (Faust Avenue), with ail fittings, :omplete as specified, per inear foot 230.00 0.00 -230.00 $45.25 ($10,407,50 34. Furnish and install approx. 14 linear feet of 12" Storm Sewer (Hwy. 45), complete as specified, per linear foot 14.00 15.00 1.00 $41.00 $41.00 35, Furnish and install approx. 150 linear feet of 12" Storm Sewer (Catherine Avenue), :omplete as specified, ncluding pavement restoration, per linear foot 150.00 151.50 1.50 $40.25 $60.38 1 36. iFurnish and install approx. 130 linear feet of 12" Storm Sewer (Alley), :omplete as specified, per near foot 130.00 130.00 $32.25 37, !Furnish and instal[,,a, pprox. 150 linear feet of 12' Storm ! Sewer Relay (W. 12th !Avenue), complete as specified, per linear foot 50.00 54.00 4.00 $40.50 $162.00 Page 5 CONTRACT: 03-09 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT ./. PRICE PRICE 38. Furnish and install approx. 25 linear feet of 18" Storm Sewer, complete as specified, per linear foot 25.00 6.74 -18.26 $48.50 ($885.61) 39. Furnish and install approx. 1,335 linear feet of 30" Storm Sewer (Easement), complete as specified, per linear foot 1,335.00 1,354.20 19.20 $46.00 $883.20 40. Furnish and install approx. 120 linear feet of 29" x 45" HERCP Storm Sewer (Easement), complete as specified, per linear foot 120.00 114.55 -5.45 $113.75 ($619.94) 41. Furnish and install approx. 280 linear feet of 36" Storm iSewer (Hwy. 45), complete as specified, per linear foot 280.00 259.90 -20.10 $55.00 ($1,105.50 42. Construct approx. 350 ~ linear feet of Open Ditching Easement), complete as specified, per linear foot 350.00 343.50 -6.50 $16.00 ($104.00) 43. Furnish and install two (2), 18" End Section, complete as specified, each 2.00 2.00 $236.00 44. Furnish and install one (1), 36" End Section, complete as specified, each 1.00 1.00 $2,111.00 45. Furnish and install one (1) Masonary Endwall over double 29" x 45" Storm Sewer, complete as specified, with riprap, lump sum 1.00 1.00 $4,900.00 46. Furnish and install approx. [wo (2) std. Inlets (Type 1 Nith 18" sump; 30" diameter) with cas;lings, ;omplete as specified, 9ach 2.00 2.00 $1,285.00 47. Furnish and install approx. 3.40 vertical feet of std. Storm Manhole (4' Inside Diameter) in two (2) !ocations without castings, ;omplete as specified, per vertical foot 6.40 8.74 2.34 $340.0C $795.60 Page 6 CONTRACT: 03-09 CHANGE ORDER # 1 I I INCREASE IN I DECREASE IN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COSTPER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES' INCREASE DECREASE UNIT PRICE PRICE 48, --urn/ch and install approx. Z1.50 vertical feet of std. Storm Manhole (6' Inside IDiameter) in two (2) ocations without castings, complete as specified, per vertical foot 21.50 21.00 -0.50 $446.00 ($223.00) 49. Furnish and install 6.10 vertical feet of std. Box Storm Manhole in two (2) locations, without castings, complete as specified, per vertical foot 6.t0 8.07 1.97 $820.00 $1,615.40 50. Rebuild std. Storm Manhole (Hwy. 45), complete as specified, lump sum 1.00 1.00 $3,415.00 51. Remodel existing Box Storm Manhole Easement), complete as specified, lump sum 1.00 1.00 $7,500.00 52. Relay existing 18" Culvert (Hwy. 45), complete as specified, lump sum 1.00 1.00 $1,500.00 53. Remove approx. 78 I.D. of trees and stumps, complete as specified, per inch diameter 78.00 78.00 $25.0C 54. Furnish and install 6" Storm Lateral at 1100 Merritt Avenue, complete as specified, lump sum 1.00 1.00 $2,200.00 55. Provide $200.00 to the City ~f Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $200.00 SECTION III - (BID ITEMS 33 - 55) - SUB-TOTALS $3,557.58 ($13,345.55) ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION I[I - STORM SEWER ITEM NUMBER DESCRIPTION CONTRACT [ NSTALLED QUANTITIES QUANTITIES NET INCREASE NET DECREASE OOSTPER UNIT INCREASEIN CONTRACT PRICE DECREASE IN CONTRACT PRICE Lower two existing sanitary laterals on HWY "45" in way of proposed storm sewer, ump sum 1.00 1.00 $408.00 $408.00 Page 7 CONTRACT: 03-09 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT iNSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 2 Asphalt pavement removal and replacemnt at Johnson Ave. and HWY "45", per sq. yd. 79.37 79.37 $17.50 $1,388.98 3 Credit for asphalt replacement on Alley south ~f W. 12th Ave. which was deleted from contract ($630.00) ADDITIONAL WORK: C. 0. # I - (ITEMS 1 - 3) - SUB-TOTAL $1,796.98 ($630.00) NET DECREASE TO SECTION Ill - ($8 620.99) NET INCREASE TO SECTIONS I, II, III NET DECREASE TO SECTIONS I, II, III NET DECREASE TO CONTRACT: $20,809.81 ($29,051.87) ($8,242.06) Page 8