Loading...
HomeMy WebLinkAbout21-18 CO #1 (Final)_11-8-23TO: VINTON CONSTRUCTION CO CHANGE ORDER #1 P.O. BOX 137 TWO RIVERS, WI 54241 Your present contract with the City of Oshkosh, Contract No. 21-18, awarded August 24, 2021, is hereby amended and changed as follows: ($20,341.45) ($13,786.20) ($13,144.00) ($3,750.00) $0.00 ($6,197.00) $44,217.14 ($13,001.51) TOTALS BID TOTAL $1,303,207.70 $1,303,207.70 CO #1 ($13,001.51)($13,001.51) CONTRACT TOTAL $1,290,206.19 $1,290,206.19 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney NET DECREASE TO CONTRACT: NET DECREASE TO SECTION 1: NET DECREASE TO SECTION 4: NET DECREASE TO SECTION 5: NET INCREASE TO ADD'L WORK: NET DECREASE TO SECTION 7: DATE: NOVEMBER 8, 2023 CHANGE ORDER: #1 (FINAL) ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ NET DECREASE TO SECTION 2: NET DECREASE TO SECTION 3: DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) 21-18 PIONEER RIVERWALK PHASE 1 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-01 Mobilization / bond / insurance; complete as specified Lump Sum 1.00 1.00 $79,500.00 A-02 Erosion control / turbidity curtain / water management during installation of outfalls; complete as specified Lump Sum 1.00 1.00 $49,900.00 A-03 Demolition / site preparation / grading / clearing and grubbing; complete as specified Lump Sum 1.00 1.00 $60,260.00 A-04 Bulkhead / storm sewer / outfall installation / rip-rap for 36" pipe; complete as specified Each 2.00 2.00 $23,530.00 A-04.01 Bulkhead / storm sewer / outfall installation / rip-rap for 96" pipe; complete as specified Each 1.00 1.00 $160,778.00 A-05 Installation of collapsible bollards; complete as specified Lump Sum 1.00 1.00 $4,974.00 A-06 Riverwalk path construction - includes curb and gutter along Main Street; 6" concrete sidewalk; 7" concrete riverwalk including bench and fishing bump outs; #4 epoxy- coated rebar; subgrade geogrid and and geotextile; bollard thickened base and light pole concrete slab; ADA- detectable warning fields; adjusting manhole rims; and temporary asphaltic paved street cul-de-sac and sidewalk; complete as specified Lump Sum 1.00 1.00 $335,205.00 A-06.1 Excavation / load / transport excavated spoils; complete as specified Cubic Yards 974.00 385.83 -588.17 $25.00 ($14,704.25) A-06.2 Load; transport; and install 1- 1/4" dense aggregate (CITY supplied); complete as specified Tons 731.00 1,081.00 350.00 $13.00 $4,550.00 A-07 Electrical materials; labor; equipment for bollards Including protective caps; complete as specified Lump Sum 1.00 1.00 $5,500.00 A-08 Installation of concrete footings; transportation and installation of railroad portal; complete as specified Lump Sum 1.00 1.00 $49,000.00 A-09 Restoration / landscaping; complete as specified Square Yards 6,196.00 5,900.00 -296.00 $9.45 ($2,797.20) A-09.1 Furnish and install trees; complete as specified Each 18.00 16.00 -2.00 $600.00 ($1,200.00) SECTION 1: WORK UNIT A Page 2 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-10 Install inlet casting; complete as specified Each 1.00 0.00 -1.00 $400.00 ($400.00) A-11.1 Electrical - 1" SCH 40 PVC conduit; complete as specified Linear Feet 100.00 0.00 -100.00 $6.00 ($600.00) A-11.2 Electrical - 2" SCH 40 PVC conduit; complete as specified Linear Feet 100.00 0.00 -100.00 $8.00 ($800.00) A-11.3 Electrical - 3" SCH 40 PVC conduit; complete as specified Linear Feet 100.00 0.00 -100.00 $10.00 ($1,000.00) A-11.4 Electrical - 12 gauge black- coated tracer wire; complete as specified Linear Feet 300.00 0.00 -300.00 $0.80 ($240.00) A-11.5 Electrical - pull box non- conductive; 24" diameter x 36"; complete as specified Each 1.00 0.00 -1.00 $1,500.00 ($1,500.00) A-11.6 Electrical - communication vault; 30" x 48"; complete as specified Each 1.00 0.00 -1.00 $1,650.00 ($1,650.00) WORK UNIT A (BID ITEMS A-01 - A-11.6) - SUBTOTAL: $4,550.00 ($24,891.45) ($20,341.45) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE B-1100 Removing pavement; complete as specified Square Yards 120.00 102.00 -18.00 $15.00 ($270.00) B-1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 840.00 809.00 -31.00 $2.00 ($62.00) B-1200 Unclassified excavation; complete as specified Cubic Yards 20.00 0.00 -20.00 $35.00 ($700.00) B-1220 Excavation special (paving); complete as specified Tons 40.00 0.00 -40.00 $35.00 ($1,400.00) B-1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 95.00 102.00 7.00 $85.00 $595.00 B-1340 Crushed aggregate base course; complete as specified Tons 40.00 0.00 -40.00 $20.00 ($800.00) B-1350 Pavement ties; complete as specified Each 40.00 27.00 -13.00 $10.00 ($130.00) B-1354 Drilled dowel bars; 1 1/4"; complete as specified Each 55.00 42.00 -13.00 $14.00 ($182.00) B-1360 Adjust manholes and inlets; complete as specified Each 5.00 2.00 -3.00 $400.00 ($1,200.00) SECTION 2: WORK UNIT B NET DECREASE FOR WORK UNIT A: Page 3 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE B-1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 75.00 82.00 7.00 $55.00 $385.00 B-1442 30" curb and gutter; 8"; with 6" CABC and grading; complete as specified Linear Feet 55.00 53.00 -2.00 $55.00 ($110.00) B-1460 Sidewalk curb; complete as specified Linear Feet 30.00 40.00 10.00 $35.00 $350.00 B-1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 625.00 548.00 -77.00 $10.00 ($770.00) B-1540 Curb ramp detectable warning field (natural/ non-painted); complete as specified Square Feet 40.00 40.00 $35.00 B-1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 6.00 6.00 $7.00 B-1700 Sawing existing pavement; complete as specified Linear Feet 30.00 30.00 $5.00 B-1710 Sawing concrete pavement full depth; complete as specified Linear Feet 170.00 170.00 $4.00 B-1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 30.00 29.00 -1.00 $70.00 ($70.00) B-1977 Pavement markings; cross- walk epoxy; 6" (white); complete as specified Linear Feet 240.00 241.00 1.00 $10.75 $10.75 B-1978 Pavement markings; stop-line epoxy; 18" (white); complete as specified Linear Feet 25.00 54.00 29.00 $19.25 $558.25 B-1986 Remove pavement markings; complete as specified Linear Feet 150.00 150.00 $8.50 B-2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 30.00 18.00 -12.00 $150.00 ($1,800.00) B-2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 2.00 2.00 $2,470.00 B-2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 7.00 4.00 -3.00 $150.00 ($450.00) B-2510 Sediment removal - Type D modified inlet protection; complete as specified Each 7.00 0.00 -7.00 $25.00 ($175.00) B-2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 8.00 0.00 -8.00 $25.00 ($200.00) Page 4 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE B-2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 20.00 15.00 -5.00 $30.00 ($150.00) B-2812 Remove storm sewer manholes and inlets; complete as specified Each 1.00 2.00 1.00 $400.00 $400.00 B-2850 Connect to existing storm sewer main; complete as specified Each 1.00 1.00 $500.00 B-2950 Excavation special (storm); complete as specified Tons 10.00 0.00 -10.00 $35.00 ($350.00) B-5025 Adjust pull box; complete as specified Each 2.00 0.00 -2.00 $175.00 ($350.00) B-5026 Remove pull box; complete as specified Each 1.00 1.00 $75.00 B-5027 Remove concrete base; complete as specified Each 4.00 1.00 -3.00 $200.00 ($600.00) B-5051 Install CITY-supplied lighting control cabinet; complete as specified Each 1.00 0.00 -1.00 $2,000.00 ($2,000.00) B-5053 Install CITY-supplied fully- actuated 8-phase traffic signal control cabinet; complete as specified Each 1.00 1.00 $2,000.00 B-5054 Install electrical service; complete as specified Each 1.00 1.00 $1,500.00 B-5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 100.00 93.00 -7.00 $10.00 ($70.00) B-5180 Connect to existing pull box; complete as specified Each 3.00 3.00 $150.00 B-5184 Connect to existing conduit; complete as specified Each 2.00 0.00 -2.00 $125.00 ($250.00) B-5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 50.00 50.00 $0.80 B-5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 50.00 50.00 $0.80 B-5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 50.00 50.00 $0.80 B-5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 10.00 10.00 $1.50 B-5360 Furnish and install 14 AWG solid 3 conductor; complete as specified Linear Feet 15.00 15.00 $1.75 B-5362 Furnish and install 14 AWG solid 5 conductor; complete as specified Linear Feet 110.00 112.00 2.00 $1.90 $3.80 Page 5 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE B-5410 Install CITY-supplied light pole and pole arm and acorn pole top light; complete as specified Each 2.00 0.00 -2.00 $550.00 ($1,100.00) B-5434 Install CITY-supplied three- section traffic signal head; back plate; and LED modules; complete as specified Each 3.00 2.00 -1.00 $175.00 ($175.00) B-5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 2.00 1.00 -1.00 $125.00 ($125.00) B-5440 Install CITY-supplied pedestrian push button; complete as specified Each 2.00 1.00 -1.00 $125.00 ($125.00) B-5502 Furnish and install Type 2 base; complete as specified Each 3.00 2.00 -1.00 $975.00 ($975.00) B-5506 Furnish and install Type 9 base; complete as specified Each 2.00 1.00 -1.00 $1,500.00 ($1,500.00) B-5509 Furnish and install Type 10 base; complete as specified Each 1.00 1.00 $7,500.00 WORK UNIT B (BID ITEMS B-1100 - B-5509) - SUBTOTAL: $2,302.80 ($16,089.00) ($13,786.20) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-01-1 Alternate 1 - mobilization / bond / insurance; complete as specified Lump Sum 1.00 1.00 $27,500.00 A-02-1 Alternate 1 - erosion control; complete as specified Lump Sum 1.00 0.00 -1.00 $1.00 ($1.00) A-03-1 Alternate 1 - electrical - 1" SCH 40 PVC conduit; complete as specified Linear Feet 1,739.00 1,465.00 -274.00 $1.00 ($274.00) A-04-1 Alternate 1 - electrical - 2" SCH 40 PVC conduit; complete as specified Linear Feet 86.00 93.00 7.00 $1.00 $7.00 A-05-1 Alternate 1 - electrical - 3" SCH 40 PVC conduit; complete as specified Linear Feet 3,117.00 2,223.00 -894.00 $1.00 ($894.00) A-06-1 Alternate 1 - electrical - 12 gauge black-coated tracer wire; complete as specified Linear Feet 4,942.00 0.00 -4,942.00 $1.00 ($4,942.00) A-07-1 Alternate 1 - electrical - pull box non-conductive, 24" diameter x 36"; complete as specified Each 14.00 11.00 -3.00 $10.00 ($30.00) SECTION 3: ALTERNATE 1 NET DECREASE FOR SECTION 2: Page 6 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-08-1 Alternate 1 - electrical - communication vault, 30" x 48"; complete as specified Each 7.00 6.00 -1.00 $10.00 ($10.00) A-09-1 Alternate 1 - lighting control cabinet; WisDOT Type 3688 with concrete base/conduits; including cabinet contents; meter breaker pedestal and grounding; complete as specified Each 2.00 0.00 -2.00 $1,000.00 ($2,000.00) A-10-1 Alternate 1 - light pole foundations; complete as specified Each 14.00 12.00 -2.00 $2,500.00 ($5,000.00) A-11-1 Alternate 1 - electrical materials; labor; equipment; including light pole foundations; complete as specified Lump Sum 1.00 1.00 $198,000.00 A-12-1 Alternate 1 - restoration / landscaping; complete as specified Lump Sum 1.00 1.00 $10,000.00 ALTERNATE 1 (BID ITEMS A-01-1 - A-12-1) - SUBTOTAL: $7.00 ($13,151.00) ($13,144.00) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-01-2 Alternate 2 - mobilization / bond / insurance; complete as specified Lump Sum 1.00 1.00 $3,500.00 A-02-2 Alternate 2 - light pole / luminary / bollard transportation; assembly; and installation; complete as specified Each 38.00 33.00 -5.00 $750.00 ($3,750.00) ALTERNATE 2 (BID ITEMS A-01-2 - A-02-2) - SUBTOTAL: $0.00 ($3,750.00) ($3,750.00) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-01-3 Alternate 3 - mobilization / bond / insurance; complete as specified Lump Sum 1.00 1.00 $500.00 SECTION 5: ALTERNATE 3 NET DECREASE FOR SECTION 4: SECTION 4: ALTERNATE 2 NET DECREASE FOR SECTION 3: Page 7 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-02-3 Alternate 3 - remove billboard; complete as specified Each 1.00 1.00 $2,500.00 ALTERNATE 3 (BID ITEMS A-01-3 - A-02-3) - SUBTOTAL: $0.00 $0.00 $0.00 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-01-5 Alternate 5 - mobilization / bond / insurance; complete as specified Lump Sum 1.00 0.00 -1.00 $1.00 ($1.00) A-02-5 Alternate 5 - soil tackifier; complete as specified Square Yards 6,196.00 0.00 -6,196.00 $1.00 ($6,196.00) ALTERNATE 5 (BID ITEMS A-01-5 - A-02-5) - SUBTOTAL: $0.00 ($6,197.00) NET DECREASE FOR SECTION 7: ($6,197.00) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10000 Temporary concrete; complete as specified Lump Sum 0.00 1.00 1.00 $12,060.00 $12,060.00 1-20000 96" shut off plate; complete as specified Lump Sum 0.00 1.00 1.00 $5,445.00 $5,445.00 1-20001 Lime/sediment pile; complete as specified Lump Sum 0.00 1.00 1.00 $7,000.00 $7,000.00 1-20002 EBS installed under 96" and 36" outfall on Pioneer Road due to unsuitable ground found under the pipe; complete as specified Lump Sum 0.00 1.00 1.00 $4,792.14 $4,792.14 1-50000 Boring under Main Street; complete as specified Lump Sum 0.00 1.00 1.00 $4,256.00 $4,256.00 1-50001 Lighting cabinet; complete as specified Lump Sum 0.00 1.00 1.00 $1,050.00 $1,050.00 1-50002 Installation of crosswalk signal; complete as specified Lump Sum 0.00 1.00 1.00 $6,216.00 $6,216.00 1-50003 Work unit B conduit; complete as specified Lump Sum 0.00 1.00 1.00 $934.00 $934.00 ADDITIONAL WORK REQUIRED: CO #1 SECTION 7: ALTERNATE 5 NET DECREASE FOR SECTION 5: Page 8 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA CONTRACT 21-18 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-50004 Anchor bolt adjustments; complete as specified Lump Sum 0.00 1.00 1.00 $2,464.00 $2,464.00 $44,217.14 $0.00 $44,217.14 ($20,341.45) ($13,786.20) ($13,144.00) ($3,750.00) $0.00 ($6,197.00) $44,217.14 ($13,001.51) ADDITIONAL WORK REQUIRED (1-10000 - 1-50004) - SUBTOTAL: NET DECREASE TO CONTRACT: NET INCREASE FOR ADDITIONAL WORK: NET INCREASE TO ADD'L WORK: NET DECREASE TO SECTION 1: NET DECREASE TO SECTION 2: NET DECREASE TO SECTION 3: NET DECREASE TO SECTION 4: NET DECREASE TO SECTION 5: NET DECREASE TO SECTION 7: Page 9 of 9 DocuSign Envelope ID: A7AE7699-6DD8-42EA-94A6-720C55C47DFA