HomeMy WebLinkAbout23-25 Criteria of ReasonablenessREGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Concrete Pavement, Asphalt Pavement, Sidewalk (New and
Rehabilitation), Driveway Aprons, Sanitary Sewer Main and Laterals (New and Relay),
Water Main and Laterals (New and Relay), and Storm Sewer Mains and Laterals (New
and Relay) Relating to Contract No. 23-25 South Koeller Street Concrete Paving
assessments as per Wisconsin State Supreme Court Decision (Berkvam vs. the City of
Glendale, 79 Wis. 2d 279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the
street improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work. Sidewalk and driveway costs are assessed to the abutting property owner
based on a square foot cost.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of concrete or bituminous
pavement and replacement of the sanitary sewer mains and laterals, storm sewer
laterals, and water distribution mains and laterals. The construction of a
concrete or bituminous pavement will provide a rideable surface available in all
weather conditions. The proposed pavement will be crowned to convey the
storm water runoff to the storm sewer system. The utility laterals provide a
connection to the mains for each property. The storm sewer system will convey
the runoff away from the area. The sanitary sewer and water distribution
systems will provide a safe and reliable conveyance system for wastewater and
drinking water.
I:\ Engineering\2021 - 2030 Contracts\2023 CONTRACTS\23-25 S Koeller St Conc Paving\ Project_Infonnation\Reports\Report of Director of PW \23-25 Criteria for Reasonableness and
Benefit-1 1 -1 G-23.doex
Estimated cost of the project is:
Proposed Assessments are:
City Cost of the project is:
$943,863.39
$534,945.11
L \ Engineering \ 2021 - 2030 Contracts \ 2023 CONTRACTS \ 23-25 S Koeller St Conc Paving \ Prcject_Information \ Reports \ Report of Director of PW \ 23-25 Criteria for Reasonableness and