Loading...
HomeMy WebLinkAboutVintons Construction Bidder Proof of Responsibility 2024CITY OF OSHKOSH BIDDER'S PROOF OF RESPONSIBILITY FOR CONSTRUCTION YEAR 2024 0% city w of Oshkosh llvcf,lvnu� ocf. .9 2023 olla�10)),-Sll-l� w 11 NS[IV ALL BIDDERS ON PUBLIC WORKS CONTRACTS SHALL PROVIDE PROOF OF RESPONSIBILITY IN ACCORDANCE WITH SECTION 66.0901(2), WSCONSIN STATE STATUTES. RETURN QUESTIONNAIRE TO: DIRECTOR OF PUBLIC WORKS CITY HALL, ROOM 301 215 CHURCH AVENUE PO BOX 1130 OSHKOSH, WI 54903-1130 E-MAIL: ttavlor@ci.oshRosh.wi.us NOTE: THE CONTENTS OF THIS QUESTIONNAIRE SHALL BE CONFIDENTIAL FOR THE EXCLUSIVE USE OF THE CONTRACTING AGENCY AND SHALL NOT BE MADE PUBLIC EXCEPT BY WRITTEN PERMISSION OF THE PROSPECTIVE BIDDER. (REVISED OCTOBER 9,2023) DO NOT REMOVE THIS COVER SHEET FROM THIS DOCUMENT ANSWERS MUST BE TYPEWRITTEN OR IN INK. PREQUALIFICATION STATEMENT There is submitted herewith for your consideration, pursuant to Section 66.0901(2), Wisconsin State Statutes, a statement of qualifications of the undersigned to furnish the necessary labor, materials, and skills required to enter upon and complete Public Works Contracts to be let by the City of Oshkosh. I. IDENTIFICATION A. Official Firm Name Vinton Construction Company B. General Telephone 920-682-0375 FAX 920-682-2838 C. Mailing Address 1322 33rd Street (P.O. Box 137) �^ (Street) Two Rivers Wl 54241 (City) (State) (Zip Code) D. General E-Mail Address ireimerftyintonwis eom E. Number of years in business under present firm name 92+ F. Please check (1), (2) or (3): ® (1) A Corporation or LLC ❑ (2) A Co -Partnership ❑ (3) An Individual G. Principal Individuals: (If a Corporation or LLC, answer below) (If a Co -Partnership, answer below) President Michael J. Maples Richard P. Lamers Vice Pres, Jeffrey M. Maples Secretary Mary G. Maples Treasurer Michael J.-Maples H. If a Corporation or LLC, answer below: (1) When incorporated 1931 Name of Partner Name of Partner (If a Sole Trader, answer below) Name of Sole Trader (2) In what State Wisconsin (Revised 10/9/23) Page 1 of 16 I. Contact information for questions regarding this form: PersoWs Name Julie M. Reimer Telephone 920-682-0375 FAX 920-682-2838 E-Mail Address ireimer@vititonwis.com Total Contract Amount for which firm is seeking prequalification: Firm must have been the Prime Contractor and have completed at least two (2) contracts/projects of similar scope/type within the last three (3) years with a Total Contract Amount of at least the amount for which firm is seeking prequalification. If approved, Contractor will be automatically approved for all lower amounts. NM ❑ $750,000 ❑ $1,500,000 ❑ $3,000,000 ❑ $5,000,000 ❑X In Excess of $7,000,000 (Revised 10/9123) Page 2 of 16 Class of work in which firm is seeking prequalification (check below -- may check multiple boxes): STREET UTILITY & SITE CONSTRUCTION GENERAL BUILDING CONSTRUCTION © Roadway Grading 0 Concrete Pavement Construction, including Grading XJ Bituminous Paving X❑ Bituminous Street Construction, including Concrete Curb and Gutter, and Roadway Grading and Graveling ❑ Mudjacking ❑X Joint Sealing ❑X Sidewalk Construction ❑X Sanitary and Storm Sewer Construction XJ Site Grading ❑ Street Lighting ❑X Reinforced Concrete Construction, i.e. Foundations, Storm Drainage Structures, Retailing Walls ❑X Landscaping ❑ Bridge fainting ❑X Water Main Construction ❑ Boring or Tunneling ❑ Sanitary and Storm Sewer Trenchless Rehabilitation ❑ Building Construction, Renovation, or Remodeling SPECIFIC CATEGORIES OF BUILDING CONSTRUCTION ❑X Building Demolition ❑ Elevator ❑ Electrical ❑ Heating, Ventilating, and Air Conditioning ❑ Painting ❑ Plumbing ❑ Pump Houses and Lift Stations ❑ Roofing n Riverwalk Construction OTHER MISCELLANEOUS CATEGORIES n (Revised 10/9/23) Page 3 of 16 II. EXPERIENCE A. What is the construction experience of the principal individuals, including superintendents and/or Fr. nF.rnrn•r�raeni�+nraani•rafirn�i Present Names of lridi 's Position of Years of Magnitude & previous Nan -Le Name e Individual Construction Type of Work, Employers for in your Experience In What Capacity Past 10 Years* Organization See Attached *If this is their current employer, so state. Average number of employees during the last 12 months: Office 42 Skilled 103 Unskilled 79 B. WORK ON HAND List below the present contracts held by you (not as subcontractor). If none, please enter "NONE". Attach additional sheets, if necessary. Additional sheets must contain same information as listed on to Anticipated Date Awarded Owner/ Location Type of Work Percent Completed Completion Cost of Work Date See Attached C. PREVIOUS CONTRACTS List below construction contracts held by the company completed for the last three (3) years (not as subcontractor). Attach additional sheets, if necessary. Additional sheets must contain same rnioriIIi lmn aS nbtfz 1 V11 LtI b a c. Date Awarded Owner/Location Type of Work Cost of Work See Attached D. Are you currently prequalified by the WDOT? N Yes ❑ No If yes, please submit a copy of the WDOT Notice of Contractor's Prequalification. (Revised 10/9/23) Page 4 of 16 III. EQUIPMENT A. List below major pieces of equipment currently owned and available when needed for proposed work, or submit a current copy of your depreciation schedule. All columns must be completed. Attach additional sheets, if necessary. Additional sheets must contain same information as listed on this age. NUMBERS OF ITEM DESCRIPTION, SIZE, CAPACITY, ETC. ORIGINAL COST ACCUMULATED DEPRECIATION PRESENT BOOK VALUE YEARS OF SERVICE See Attached (Revised 10/9123) Page 5 of 16 IV. CONTRACTUAL RESPONSIBILITY Answering "yes" to any of the following questions will not disqualify a company from becoming approved to bid by the City of Oshkosh. However, failure to answer truthfully may result in disqualification for the entire year. A. Has your firm or any officer or partner of your firm ever been debarred, suspended, or disapproved by the State of Wisconsin or the Federal Highway Administration in the past ten (10) years? ❑ Yes XX No If so, state: Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): B. Has your firm or any officer or partner of your firm ever been debarred, suspended, disapproved, or not pre -qualified by any government entity in the past ten (10) years? ❑ Yes tXX No If so, state: Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): (Revised 10/9/23) Page 6 of 16 C. Has your firm or any officer or partner of your firm had any type of business, contracting, or trade license, certification, or registration revoked or suspended in the past ten (10) years? [] Yes Q No If so, state. Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): D. Has your firm or any officer or partner of your firm ever committed a violation of federal, state, or local government safety or environmental laws as determined by a fine, settlement, administrative order, or final decision of a court or government agency authority in the past ten (10) years? This includes, but is not limited to, any OSHA or WDNR violations. ❑X Yes ❑ No See Attached 10 Year Sununary - *per correspondence from Tracy Taylor on 12/15/2021, all If so, state: future OSHA violations will include the requested information found below. There are no new OSHA violations that have been added since last year's pre -qualification was submitted. Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): (Revised 10/9/23) Page 7 of 16 E. Does your firm or any officer or partner of your firm have an open or ongoing investigation of a violation of federal, state, or local government safety or environmental laws? This includes, but is not limited to, any OSHA or WDNR violations. ❑ Yes FX No If so, state: Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): F. Has your firm ever worked on any contract or work awarded to it that resulted in a lawsuit in the past ten (10) years? ❑ Yes ® No If so, state: Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): (Revised 10/9/23) Page 8 of 16 G. Has your firm or any officer or partner of your firm ever declared bankruptcy while performing work on a contract or work awarded to it, or while an officer or partner of another firm in the past ten (10) years? ❑ Yes M No If so, state: Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, and resolution): H. Has your firm ever defaulted on or failed to complete any contract or work awarded to it in the past ten (10) years? ❑ Yes XM No If so, state: Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): (Revised 10/9/23) Page 9 of 16 I. Has your firm ever been assessed liquidated damages or other penalties for failure to meet the contract requirements for work awarded to it hi the past ten (10) years? ❑ Yes X] No If so, state: Date: Project Owner. Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, resolution, and amount of penalties assessed): J, Has any officer or partner of your firm ever defaulted or failed to complete a construction contract handled in their own name in the past ten (10) years? [-]Yes 0 No If so, state: Date: _ Name of Officer/Partner: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): (Revised 10/9/23) Page 10 of 16 K. Has any officer or partner of your firm ever been an officer or partner of some other organization that defaulted or failed to complete a construction contract in the last ten (10) years? ❑ Yes ®No If so, state: Date: Name of Officer/Partner: Name and Mailing Address of Organization: Name and Mailing Address of Project Owner: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution)- L. Has your firm or any officer or partner of your firm asked to be relieved from a bid submitted by it to a public awarding authority in the past ten (10) years? ❑ Yes M No If so, state: Date: Project Owner: Project Owner's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): (Revised 10/9/23) Page 11 of 16 M. Has your firm or any officer or partner of your firm ever been charged with or convicted of a violation of any wage schedule in the past ten (10) years? ❑ Yes X1 No If so, state: Date: Claimant: Claimant's Mailing Address: (At that time or preferably now if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): N. Has your firm; any of its owners; a subsidiary or corporate parent; or any officer, director, or partner thereof, been convicted of violating Section 133.03 Wisconsin Stattites (Unlawful Contracts: Conspiracies) in the last ten (10) years? [:]Yes XX No if so, state: Date: Claimant; Claimant's Mailing Address: (At that time or preferably now, if there is a difference) Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): (Revised 10/9/23) Page 12 of 16 V. SAFETY A. Does your firm require the following safety training programs: 1. Right to Know/Hazard Communication 2. Fire Prevention 3, Hot Work Permits 4. Environmental Compliance 5. Excavation/Trenching 6. Working at Elevation > four feet (4') 7. Confined Space Entry 8. Control Hazardous Energy (Lockout) 9. Operation of Powered Equipment/Vehicles 10. Working with Hazardous Voltages 11. Personal Protective Equipment 12. Process Safety If you answered NO to any of the above, please comment: X❑ Yes ❑ No ❑X Yes ❑ No ❑ Yes © No K] Yes ❑ No ® Yes ❑ No ❑X Yes ❑ No ❑X Yes ❑ No X❑ Yes ❑ No X❑ Yes ❑ No ❑ Yes © No 0 Yes ❑ No ❑X Yes ❑ No "Hot Work" - is not in our scope of work but is discussed in our safety manual and handout. "Hazardous Voltage" - is not in our scope of work. We do perform generator checks, extension cord checks ground We do Diggers Hotline Training. B. Are the training records available upon request? X❑ Yes ❑ No C. Please provide your Total OSHA Incident Rate and Lost Workday Rate for each of the last three (3) years by completing the table below: 1. Year 2022 2021 2020 2. Number of Employee Hours Worked 417,260 409,486 409,805 3. Number of Lost Workday Cases 4. Number of Cases Due to Injury or Illness Defined as Recordable 5. Total Number of Recordable Cases (Add 3 and 4 Above) 3 18 13 17 8 7 20 26 20 (Revised 10/9/23) Page 13 of 16 17 6. Calculate Your Incident Rate by Using the Following Formula: Total Cases on Line 5 x 200,000 Hours Employee Hours on Line 2 9.59 12.70 9.76 Please provide Name and Telephone Number for Individual Responsible for: 1. Safety Coordination: 2, Environmental Issues: Chad Hevduk Name Chad Heyduk Bill Vachon Name VI. BONDING RESPONSIBILITY 920-374-0792 Telephone 920-374-0792 920-374-0231 Telephone A. Provide the name of your bonding company and your firm's current limit of Payment and Performance Bonds: Name: See Attached - Travelers Casualty and Surety Company of America Dollar Limit: Total Bonding Capacity - $125M Names and addresses of all bonding companies other than those listed in "A" above which have written bid and security bonds during the last five (5) years: NONE B. Attach a current letter of reference from your principal bank. Include your current line of credit, if you have a line of credit. The submission of only your line of credit documentation is not sufficient. $4M - See Attached (Revised 10/9/23) Page 14 of 16 C. Has any bonding company ever taken over a contract or made payments because of your firm's failure to carry out a contract? [] Yes n No I£ so, state: Date: Name of Bonding Company. Bonding Company's Mailing Address: Full particulars in each instance: (including type of work, amount of contract, cause of violation, and resolution): VII. CONTRACTOR'S FINANCIAL STATEMENT A. Attach your firm's latest complete financial report (including Balance Sheet, Income Statement, and Statement of Cash Flows) with the name of the Accountant who prepared it. See Attached - Year Ending 2022 A. Are any of your assets assigned? If so, which are assigned? NO B. For what purpose are they assigned? (Revised 10/9/23) Page 15 of 16 VIII. AFFIDAVIT STATE OF Wisconsin ) COUNTY OF Manitowoc ) Michael T. Maples being duly sworn, deposes and says that he/she (Name of Officer/Owner) is the President (Title) of _ Vinton Construction Company (Name of Firm) and that the answers to the foregoing questions and all statements therein contained are true and correct, and that any owner, bonding company, or other agency herein named is hereby authorized to supply the municipality, City of Oshkosh, with any information deemed necessary to verify this statement. (Signature of Officer/Owner) Subscribed and sworn before me this 16th day of October 2023 . ESJEFFREY R SCHWEKE otary public e of Wisconsin i Notaiy Public Manitowoc Wisconsin County State My Commission Expires i' !2 t 272t� for Contracts with Prequalification APPI OVE BY: Limits of Not More Than: Date 0 - �� j �� C1 Oeq (% © C '15—hector of Public Works Date City Manager l:\Engineering\Contractors Prequali(led to Bid\Bidders Proo(Forn%_76.9-23.do4zx (Revised 10/9/23) Page 16 of 16 M VINTON CONSTRUCTION CO... Road Contractors Equal Opportunity Employer P.O. Box 1987, Manitowoc, Wisconsin 54221-1987 Phone: 920-682-0375 Fax: 920-682-2838 Two Rivers Office: 1322 33,d Street, P.O. Box 137, Two Rivers, WI 54241-0137 KEY EMPLOYEE EXPERIENCE REPORT: Name Current Position Years Exp. w/VCC Michael J. Maples President / Treasurer 50 CEO — Manages All Operations B.S. Civil Engineering, UW Madison 50 Years' Construction Experience w/VCC Richard P. Lamers Vice -President 26 Concrete Division Manager B.S. Finance & Risk, UW Madison 26 Years' Construction Experience w/VCC Jeffrey M, Maples Vice -President 14 Sewer Division Manager B.S. Landscape Architecture, UW Madison 14 Years' Construction Experience w/VCC Mary G. Maples Secretary 17 Human Resource Manager B,S, UW Oshkosh 17 Years' Human Resource Experience w/VCC Jeffrey R. Schweke Controller 3 B.B.A. — Accounting, UW Oshkosh 11 Years' Experience Jeff Dewane Controller 7 Marquette University; BS-Business University of California — Irvine, MBA Certifications: CPA, CMA, CGMA 30Years' Experience Julie Reimer Contract Manager 4 23 Years' Experience Barbara A. Kollath IT Manager 9 B.S. Business Management / Finance UW Milwaukee Certifications: MCSE, NSE 38 Years' Related Business / IT Experience Ron Raboine Estimator & Sewer Division Manager 15 B.S. — Civil Engineering, UW Platteville, P.E. 39 Years' Construction Experience Mike Fett Grading Division Manger B.S. Business Administration, UW Stout Former owner of Fett Construction 44 Years' Construction Experience Joseph Hoffman Grading Division Manager B.S. UW Stout 32 Years' Construction Experience Steven Navarre Grading Division Manager B.S. UW Green Bay, P.E. NE Wisconsin Tech -- CAD / Surveying 30 Years' Construction Experience Chad Heyduk Safety Director 21 Years' Experience Bill Vachon Safety & Environmental Director 42 Years' Construction Experience Tom Sand Quality Control — QMP Manager B.S. Silver lake College UW Platteville — Highway Tech Cert. WisDOT — Independent Assurance for Cone & Agg 23 Years' Construction Experience John Streu Project Manager Past Owner Streu Construction 46 Years' Construction Experience Dean Friedman Project Manager Assoc. Degree -- Civil Engineering Tech., NWTC 11 Years' Construction Experience Josh Brzezinski Project Manager B.S. Construction Management, Mich. Tech 13 Years' Construction Experience Jerry Franklin Project Manager B.S. Civil Engineering, Iowa State University, P.E. 34 Years' Construction Experience Heath Schopf Project Manager B.S. Civil Engineering, UW Platteville, P.E. 29 Years' Construction Experience Dave Strelcheck Project Manager B.S. Environmental Engineering, Mich. Tech., P.E. 25 Years' Construction Experience Kyle Skenandore Project Manager B.S. Civil Engineering, UW Madison, E.I.T. 9 Years' Construction Experience 15 R 5 1 7 11 16 E 5 22 5 3 K Don Rabitz Project Manager 8 Assoc. Degree Civil Engineering Tech., NWTC 24 Years' Construction Experience Mike Greenwood Project Manager 20 Years' Construction Experience Concrete Division: Bob Steeber Concrete Supervisor 15 Chad Bender Handwork Form Crew Foreman 22 James Huben Hand Crew Foreman 20 Curtis Denk Hand Crew Foreman 24 Gavin Krause Mainline Paving Foreman 25 Scott Mashlan Saw Crew Foreman 23 Brian Risch Trimming Foreman 34 Eric Thelen Misc Concrete Foreman 18 Sewer Division: Scott Fletcher Utilities Supervisor 17 Joel Fielding, Jr. Utilities Foreman 12 Frank Dvorachek Utilities Foreman 20 Zach Van Straten Utilities Foreman 5 Brian Clegg Utilities Foreman 4 DJ Dontje Utilities Foreman 10 Gerald Niemisto Utilities Foreman 7 Gradina Division: Arthur Ashauer Grading Foreman 12 Jesse Wagner Grading Foreman 25 Kevin Valenta Grading Foreman 22 Michael Kratz Grading Foreman 31 Mark Tomchek Grading Foreman 31 Korey Kane Grading Foreman 15 Aaron Linzmeier Grading Foreman 6 Bradley Kees Grading Foreman 5 GPS Technicians: Jeremy Dart GPS Technician 6 Brandon Check GPS Technician 5 Jordan Mande GPS Technician 2 10/23/2023 11:36 AM JOB # Job Description PM VCC Work Amount Complete % Complete Anticipated Completion Date Type of Work 23006 Oshkosh- Pratt Trail Reconstruction- 22-18 CP $ 503,937.20 $ 251,968.60 50.00% Trail Reconstruction 23051 APPLETON- STH 441; USH 10-N JUNCT. IH 41- #31 (2.14.23) JB $ 4,239,972.47 $ 3,815,975.22 90.00% 11/15/2023 Heavy Highway 23052 Little Chute - Randolph Or & Buchanan St Paving - 2023003 CG $ 1,530,469.06 $ 1,377,422.15 90.00% 11/24/2023 Heavy Highway 23058 WALIWATOSA- W. NORTH AVE.- #19 2.14.23 DN $ 10,098,120.77 $ 7,068 684.54 70,00% 11/30/2023 Heavy Highway 23067 Manitowoc Riverpoint Develop. Phase 2 - WS-23-2 RR $ 2,776,817.90 $ 1,804,931.64 65.00% sitework 23078 Oshkosh 23-05 Lakeshore Park Parking Lot and Trails Construction BT $ 331,569.18 $ 165,784.59 50.00% 10/27/2023 Parking Lot and Trail Construction 23079 Manitowoc - Concrete Paving I - Reed Ave- WS-23-1 TS $ 2,948,676.18 $ 2,653,808.56 90.00% 10/27/2023 Road Reconstruction 23086 Oshkosh 23-10 Parking Lot Construction CP $ 341343.84 $ 204 806.30 60.00% Parking Lot 23088 Oshkosh 2023Tennis/Picklebali Court Rehabilitation BT $ 43,815.00 $ 39,433.50 90.00% 10/31/2023 Court Reconstruction 23089 Oshkosh Sanitary Sewer Lining- 23-22 CP $ 863,492.50 $ 215,873.13 25.00% Sewer Reconstruction 23090 WALIKESHA- IH 94 EAST WEST FREEWAY, MOORLAND #4 5.09.23 DR $ 984,039.81 $ 738,029.86 75.00% 10/31/2023 Heavy Highway 23094 Kaukauna Fox River Locks 23-01 Earthwork JB $ 259,392.98 $ - 0.00% 11/15/2023 Road Reconstruction 23095 Manitowoc WS-23-12 Asphalt Paving III -Pickleball Ct Rheaume Park TS $ 212,039.35 $ 42,407.87 20.00% 10/31/2023 Court Reconstruction 23098 Oneida- Amelia Cornelius Culture Park #19-004 & 22-108 DF $ 359,067.16 $ 305,207.09 85.00% 11/15/2023 Park Improvements 23099 Menomonee Falls Roman Drive Reconstruction SN $ 414,827.50 $ 82,965.50 20.00% 11/17/2023 Road Reconstruction 23102 Oneida- STH 172- Sanitary Sewer & WM Relocation- 23-109 DF $ 330,082.80 $ - 0.00% 11/15/2023 Sewer Reconstruction 23105 Oneida- Mission Park Renovations #22-105 DF $ 298,506.82 $ 0.00% 11/15/2023 Park Improvements 23106 Oshkosh- E Parkway Ave Watershed Det. Basin - #23-17 CP $ 618,310.60 $ 0,00% Pond / Detention Basin 23107 Two Creeks 2023 Road Improvements TS $ 158,694.60 $ 0.00% 11/11/2023 Road Reconstruction 23108 Appleton- Lundgaard Park Phase I Improvements CG $ 613,695.20 $ 61,369.52 10.00% Park Improvements 23109 lGreen Bay Admin Conflnement Rec Area JF $ 87,334.00 $ - 0.00% 11/15/2023 sitework 23111 Mequon Storm Sewer Catch Basin / Curb Inlet Repairs 0 $ 22,716.00 $ 0.00% Sewer Reconstruction 23112 Menasha Jefferson Park Playground 0 $ 120,810.00 $ 0.00% Park Improvements 23114 Carmeuse - Manitowoc 0 $ 120,000.00 $ 0,00% sitework 23115 Manitowoc Lutheran HS- Phase 1- Gym Addition 0 $ 524 876.46 $ 0.00% sitework 23116 Manitowoc WO-23-27 River Point Fill 2 0 $ 339,623.04 $ 0.00% sitework 10/17/2023 4!21 PM 2023 Proiect List JOB # Job Description PM VCC Woric Amount °/a Complete Anticipated Type of Work Complete Completion Date 23006 Oshkosh- Pratt Trail Reconstruction- 22-18 CP $ 503,937.20 $ 251,968.60 50.00% Trail Reconstruction 23016 HOFFMAN- MILW 143 NS FREEWAY #3 (10.11.22) - (2023 HS $ 12,015,559.68 $ 4,205,445.89 35.00% Heavy Highway 23021 Portion PHEIFER- GRAND CHUTE- WIS 125, I-41- BLUEMOUND (WISDOT JB $ 622,228.00 $ 466,671.00 75.00% 11/1/2023 Heavy Highway 23051 DESIGN BUILD APPLETON- STH 441; USH 10-N JUNCT. IH 41- #31(2,14.23) JB $ 4,239,972,47 $ 3,815,975.22 90,00% 1 11/is/2023 Heavy Highway 23052 Little Chute - Randolph Dr & Buchanan St Pavin - 2023003 CG $ 1,530,469.06 $ 1,377,422.15 90.00% 11/24/2023 Heavy Highway 23058 WAUWATOSA- W. NORTH AVE: #19 2.14.23 DN $ io,098,120.77 $ 7,068,684,54 70.00% 11/30/2023 Heavy Highway 23067 Manitowoc Riverpoint Develop. Phase 2 - WS-23-2 RR 2,776,817A0 $ 1,804,931.64 65.00% Sitework 23068 Dorner- Sheboygan Indlana Ave. Reconstruction- 2477-23 TS $ 618,149.85 $ 525,427.37 85.00% 10/27/2023 Road Reconstruction 23078 Oshkosh 23-05 Lakeshore Park Parking Lot and Trails Construction BT $ 331,569.i8 $ 165,784.59 50.00% 10/27/2023 Parking Lot and Trail Construction 23079 Manitowoc - Concrete Paving I - Reed Ave- WS-23-1 TS S 2,948,676.18 $ 2,653,808,56 90.00% 10/27/2023 Road Reconstruction Oshkosh 23-10 Parkin Lot Construction CP $ 341,343,84 $ z04 806.30 60.00% Parking Lot Oshkosh 2023Tennis/Picklebail Court Rehabilitation BT $ 43,815.00 $ 39,433:50 90.00% 10/31/2023 Court Reconstruction r309O Oshkosh Sanitary Sewer Lining- 23-22 CP $ 863,492.50 $ 215,873.13 25.00% Sewer Reconstruction WAUKESHA- IH 94 EAST WEST FREEWAY, MOORLAND #4 DR $ 984,039.81 $ 738,029.86 75.00% 10/31/2023 Heavy Highway 5.09.2-1 Kaukauna Fox River Locks 23-01 Earthwork JB $ 259,392.98 $ - 0.00% 11/15/2023 Road Reconstruction 23095 Manitowoc WS-23-12 Asphalt Paving III-Pickleball Ct Rheaume TS $ 212,039.35 S 42,407.87 20.00% 10/31/2023 Court Park Reconstruction 23098 Oneida- Amelia Cornelius Culture Park #19-004 & 22-108 DF $ 359,067,16 $ 305,207.09 85.00% 11/15/2023 Park Improvements 23099 Menomonee Falls Roman Drive Reconst"ruction SN $ 414,827.50 $ 82,965.50 20.00% 11/17/2023 Road Reconstruction 23101 PTS- Green Bay Berner St, Reconstruction- Pavement 4-23 DF $ 237,700.88 $ 0.00% 11/1J2023 Road Reconstruction 23102 Oneida- STH 172- Sanitary Sewer & WM Relocation- 23-109 DF $ 330,082.80 $ - 0.00% 11/15/2023 sewer Reconstruction 23105 Oneida- Mission Park Renovations #22-105 DF $ 298,506.82 $ 0.00% 11/15/2023 Park Improvements 23106 Oshkosh- E Parkway Ave Watershed Det, Basin - #23-17 CP $ 618,310.60 $ o.00% Pond / Detention Basin 23107 Two Creeks 2023 Road Improvements TS $ 158,694.60 $ - 0.00% 11/11/2023 Road Reconstruction 23108 Appleton- Lundgaard Park Phase I Improvements CG $ 613,695.20 $ 61,369.52 10,00°/n Park Improvements 23109 Green BayAdmin Confinement Rec Area JF $ 87 334.00 $ - 0.00% 11 is 2oz3 Sitework 23111 Mequon Storm Sewer Catch Basin J Curb Inlet Repairs 0 $ 22,716.00 $ 0.00% Sewer Reconstruction 23112 Menasha Jefferson Park Playground 0 $ 1 00,810.00 $ 0.00% Park Improvements 23114 Carmeuse - Manitowoc 0 $ 120,000.00 $ - 0.00% Sitework 23115 Manitowoc Lutheran HS- Phase 1- Gym Addition 0 $ 524,876.46 $ 0.00% Sitework 23116 Manitowoc WO-23-27 River Point Fill 2 0 S 339,623.04 S 0,00% Sitework VINTON CONSTRUCTION CO... Road Contractors Equal Opportunity Employer P.O. Box 1987, Manitowoc, Wisconsin 54221-1987 Phone: 920-682-0375 Fax: 920-682-2838 Two Rivers Office: 1322 3P Street, P.O, Box 137, Two Rivers, WI 54241-0137 3 YEAR PROJECT SUMMARY VINTON CONSTRUCTION COMPANY 10/16/2023 1:54 PM PREVIOUS CONTRACTS 2023 Proiect List U Ir1 G 23001 ITS Oshkosh 22 01-Bowen Streetvanitary Interceptor & Winnebago $890,839.00 $890,839.00 j to Consf. "(2023) 23002 Advance Town of Sheboygan - North Town Sheboygan $786,909.00 $786,909.00 11, 23003 ,OREENSAY= AUSTIN STRAUBEL- GRB10121AIP=62 "Brown l $5;815,124,58- $5;$15,124 58 3 (6 09.22} 23004 Sturgeon Bay- Campground Drainage Improve- Potawatomi- Door $150,658.00 $160,668.00 21FIT 23006 Oshkosh —-,Pratt Reconstruction=`22-18" Winnebago $1;128,74.1.90' $1,428,741,90 Vail 23007 PTS- Oshkosh 22-13 WitzeIA ve, Sanitary Sewer Const. Winnebago $385,588.03 $385,588,03 (moved to 2023 #23007) , 23008 Advance- Oshkosh-, E, 9#t Avenue- 22-02 Winnebago $446,382.30 $446,382.30 23066 Oshkosh- Bradley St. Asphalt & Utiility Reconstruction- 23-09 Winnebago $1,940,885.13 $1,940,885.13' 23011 'PTS- Oshkosh. hake Butte des Morts, Dr,. Sanit, Swr & WM= Winnebago $50;530,00 $54,53o.g0 22-26 i 1 23012 Two Rivers Central Park West Redevel11 opment Manitowoc $899,719.30 _ $ti99,719 30 23017 OCONTO -ARBUTUS AVENUE #41 (11,08.22) Uconto 4M4,30U ZZ ➢-tVY,JJV,4G $58406576 230�8;BRILLIQN-REEh DSVILE=USH10#?3(12,13.22} ; Caiumet/Manitowoc $584,065.76 23021 PHEIFER- GRAND CHUTE- WIS 125,141 - BLUEMOUND Outagamie $622,228.00 $622,228.00 (WISDOT DESIGN BUILD) 23024 3RIL�,ION- N, COUNTY LINE RD,- EAST"RVR BRDG '#20 Calumet $611,255.63 $611;255 53 (1,10.23) 23026 Fond du Lac - 2023 Lighthouse Drive Reconstruction 2023- Fond du Lac $448,192.29 $448,192.29f 020 23027MAPLE-GROV> -'CTH W #19t(1.10.23} Manitowoc I $2,750,092 13 $.,750,092.131 23028 NEA ONEIDA-GREEN BAY- STH 172 #21 (12,13,22) Brown $3,519,015 92 $3,519,015.92 f 23029� WESTBEND AIRPORT- RUNWAY 13-31 & TXWY A Washington $3,069,760.04 $3,069,760,04 12ECON AIP-221ETB 1005 f 23031 Advance- Oshkosh- Wisconsin Street Reconstruction- 23-01 Winnebago $660,502.00 $660,502,00 23Q32 Oshkosh Paine Art ICtr- - Congress Ave, Parking Lot Winnebago $323,944,10 $323,944 ,% i Improvements 23033 PTS- Oshkosh- Arthur, Tyler, CocNdge & Hauman St. Recon, Winnebago $1,053,353,40 $1,053,353.40 - 23-08 23036 Mike Pfister Driveway - Kiel Manitowoc; $107,910 t)0 $107,910,00? 23637' ZTI - SLINGER-RICHFIELD- USH 45, IH 41, HWY 60 #41 Washington $1,206,404.1.9 $1,2016,404.19 23038 Winnebago -Oshkosh Perimeter Road & I ence�Repalr- `.Winnebago $1167&000100 $1,675,000.00 2112E 23039 Forest Cty Potawat. Comm. - Sugarbush Lane Subdivision - Forest $2,875,202.97 $2,875,202.97Fl F55-43424 - Carter 23641 O"hearn`s Irish Dairy'Reedsville Manitowoc $567; 1 1 00 $�67,641 00! ,' 23042 Washington County - Germantown/Mequon - CTH M Recon. Washington $2,624,169.17 $2,624,169.17 HWY 23-06 - Wasaukee Rd 23043 Grand dhute Greenville Drive Aream Outagamie' $3,096,313.52 $3,096;313;52 _Improyeent6 23044 LISBON-RICHEIELD- INT. WlHILLSIDE ROAD- #21 Washington $1,112,020.40 $1,112,020.40 (214.23) f.23046 Manitowoc-' Ritter Point-: Junk Yard Clean Up -"WO-23�13 �Manitowoc $163,;62427 $163,624;27 23047 NEA- TWO RIVERS-KEWAUNEE- STH 42 #22 (12.13,22) Manitowoc $1,964,172,53 $1,964,172,53 ' 23648 New Berlin Lincoln Avenue Reconstruction Waukesha $4,599,301,20 $41599,301 i20; 23049 KIMBERLY- CTH N; S RAILROAD ST INT,-#29 (2,14.213) Outagamie $1,857,153.28 $1,857,153.28 23051"APPLETON- STH ,441;'USH,10-NJ.UNCTAHA1-#31 Caiumet%Outagamie $9,791,958,66 $9,791,958:66 (2,,14.23) 23052 Little Chute - Randolph Dr & Buchanan St Paving - 2023003 Outagamie $2,069,872.61 $2,009,872.61" VINTON CONSTRUCTION COMPANY 10/16/2023 1:54 PM 23068 Darner -Sheboygan I11 ndiena Ave.Reconstruction- 2477-23 Sheboygan $773,504.10 $773,504.10 VINTON CONSTRUCTION COMPANY 10/16/2023 1:54 PM PREVIOUS CONTRACTS 23106 Oshkosh- E Parkway Ave Watershed Det. Basin-#23-17 Winnebago $1,183,361.75 $1,183,361,75 23107 Two Creeks 2023"Road Improvements Manitowoc $526,972.20, $526,972 20 23108 Appleton- Lundgaard Park Phase I Improvements Winnebago $911,177.70 $911,177.70 23109 'Green gay Admin,.Confipement.Reo Area Brown '= $109,899,00' $199,$99 00' 23110 Oshkosh- S. Koeller St. Concrete Paving- 23-25 Winnebago $943,863.39 $943,863.39 23111 Mequon Storm Sewer"Catch Basin Curb Irilet'Repairs $22,716,00 $22,716.00 23112 Menasha Jefferson Park Playground Winnebago $224,542.50 $224,542.50 i 23114 Carmeuse an Manitowoc $120,000.00 $120,0t)0,00 23115 Manitowoc Lutheran H$- Phase 1-Gym Addition Manitowoc $564,WZ82 $564,012.82 LB Clarke 80.1 00 VINTON CONSTRUCTION COMPANY 10/16/20213 1:54 PM PREVIOUS CONTRACTS 2022 Proiect List rDL c7c71 m lu tug 1 M lu ),VJV,WV I I j--v- �Brown $41807,300-100 14M67,300,00 Portage $1721554,00 $172,554,00 $1i Sheboygan $44,648,00 $44 Brown $562 811 i,05 Brown $595,583,76 $595 R 22,027 B R 22028 N I NEA-#28 IH 43 Patch Job Manitowoc Z�Z,bb(b II q)z, tmfo "o f ?5. -1 -1 W ' s,01rail quk6.shqQtv pewaUk6e�Mul0.11 Waukesha 0s, a, $ _I ,954,4 I5 35 3 &H PP , (Good Hope - Rld),- . Brdg - OV I e r I BR. ivulwaukee $1,248,139,12 Milw. River"#12 (2.08.22) �j -1 4 B- U,fey, 4, --, Sh e-b- I rid a fi-a Avenue, ,- #,3- Sheboygan $927 929�22 $927,929.22 6 Pheifer - Rlsseeuw Rd/C:TH W (Hand Creek Sheboygan $129,318.80 $129,318.80 & Onion Rvr Brdgs)-.#1 9 0. 1 ll.22) I $14,076.57 ,47 $1,248,139,12 VINTON CONSTRUCTION COMPANY PREVIOUS CONTRACTS 22038 PBNP 2022 Security Work Two Rivers $204,018.00 � 22039 Geo-Solutlons - Remedial Action ConsL Manitowoc $408$29.50 1 Chicago St. Manitowoc 22041 FOND DU LAC MILITARY RD (SUPERIOR Fond du Lac $4,527,574.17 ST. - WESTERN AVE) #29 (2.08.22) 22042 ZTI - 3 Watertown STH 16 - RR Brdg Dodge $164,201.08 22043 Mishicot High School Track and Field Manitowoc $1,103,076.58 Redevelopment 22044 De.Pere 22-20 American Blvd, & Commerce Brown $1,600,171,60' Conc. Paving 22046 NEA - #30 STH 32; Howards Grove - Kier Manitowoc $85,624,24 WisDOT (12.14.21) 22047 Wauwatosa ?22-08 N. t8th Street Milwaukee $5,2659689 45' 22048 West Bend -18th Ave - #20 (3.08.22) Washington $1,841,986.48 22049 Manitowoc WS-22-4 Asphaltic Concrete Manitowoc $598;31416 Paving 22051 PHEIFER- MEEME WEST WASHINGTON Manitowoc $92,811,04 RD, MEEME RIVER BRDG #23 (2,08.22) 22052 Manitowoc W-= 2-13 Intersection Recon, For Manitowoc $240,154 71 Two -Way Traffic 22054 PTS- Oshkosh 22-13 Witzel Ave. Sanitary Winnebago $385,588,03 22064 PHEIFER- MANITOWOC RAPIDS - N UNION RD #25 (3.08.22) 22065 NEA- STH 55 - Kaukauna -Seymour - t 22066 Little Chute- Railroad Quiet Zone Cro, Imp. Project 22067 Bowersµ Kaukauna Utilities Island Str+ Water Main 22068 Little Chute- Main St. Turn Lanes & Crosswalks 070 Advance- Hobart-2022 Centerline Dr. Street Construction - 2320-22-03 o71 Advance -',`Fax Crossing 2022 Water I Clayton & Kerry 072 Jossart- Oshkosh 22-07 Oregon Stre( .55 Manitowoc $91, ing Outagamie $233,1826.46 10/16/2023 1:54 PM $86,624,24 $92, 811.04 8.03 $91,795. Outagamie $299,983.08 Manitowoc $1,459,451.42 Brown $943,7%00 $943,750,00 nepago :P44o;'JJ L4. $1,103,076.68 $2,201,338.85 $1,1026,966.79. $619,373.15 $233,826.46 $299,983.08 VINTON CONSTRUCTION COMPANY 10/16/2023 1:54 PM PREVIOUS CONTRACTS Pfi NO 22074 Menasha- Airport Road Reconstruction- Winnebago $855,638.45 $855,638.45 2022-02 22075 Spancrete°- Valders '- Pond Dredging Manitowoc $1 g3,290:Q0 $1031290.00 22076 Appleton WWTP Hardscapes Recon. Outagamie $336,602.46 $335,602.45 Project 22077 Hletpas .:Neenah 2-22"Dieckhoff & Grove Winnebago $3191686,50 $310,686.50 22078 Middleton- W. De Pere- GP Neat Dig Turn Brown $34,822,00 $34,822.00 Down Trench 22079 Little Chute-!Cherryvale Avenue Outagamie $854,170,17 $854,170.17 22080 Fed Ex Manitowoc Manitowoc $6,118,208.00 $6,118,208.00 22081 Jossart -Two Rivers, UtII, Improve; 17th ' Manitowoc ,$485i363,60 $485,363.60 Street 22082 Glendale Good Hope Road Watermain Milwaukee $93,905.00 $93,906.00 Replacement 22083 ;Manitowoc WS-22-11 Concrete Slab Manitowoc $136;353.44 `$136;353.44€ Replaeerrient 22084 Oshkosh - Parking Lot Construction - 22-08 Winnebago $429,929.75 $429,929.75 22086 Manitowoc WS-22-14. Asphaltic -Cone. Manitowoc $1;081,881 19 $1,081;881.% Paving-'S. 7th St: 22086 Manitowoc WS-22-12 Conc. Intersection Manitowoc $89,371.36 $89,371.36 Recon.- Cleveland & Maritime 22087 WinnebagoCty- CTH JJ "& "CTH CB Round- Winnebago $1,612,36340 $1;612,363 40 a=Bout 22088 Manitowoc- MPU Abatement- MPUPP22-05 Manitowoc $76,742.50 $76,742.60 22089 Green Bay Austin Straubel GRB1010/AIP-55 Brown $2,517,897 89 $2,517;897:89 Access Road Rehab 22090 Peters- Kimberly- 2022 Street Outagamie $285,533.25 $286,633.25 Reconstruction- Van Roy Road 22091 Lannon- Custer Lane•Reconstruction- 2- Waukesha $1,772,100.50 $1,772,100,50 2022 22093 Lunda- Rockland- CTH JJ Manitowoc River Manitowoc $123,547.64 $123,647.64 Bridge #43 (5.10.22) 22004 Xaukouna 7-22 Island/Elm"St. Intersection .Outagamie $462,627.41 $462,627:41 Improvements 22095 NEA - Risseeuw Rd Shidr Overlay Town of Sheboygan $2,860.00 $2,860.00 Holland 22096 Manitowoc WU-22-8 Sanitary &Storm Manitowoc $287;766.27 $287,766.27 Sewer Construction 22097 Calvin & Goss- Guifstream Paint Hangar- Site Utilities bedro,otr Outagamie Brown $809,049.00 $141,944.55 $809,049.00 $141,944.55 � 22098 22099 Green Bay Elmore Street Reconstruction 2-2 Eis Implement- Two Rivers Manitowoc $12,600.00 $12,600.00 22100 T.'Mishicot' 2022 Culvert Work Manitowac. $3.0,079,00; $30 079.001 22101 Sheboygan Washington Square Hydrant Sheboygan $26,345.00 $26,346.00 Repair 22102 . NEA- GREEN BA'-ABRAMS- USH 41, 'Brawn/O.conto $5.00,000.00 $500,000,00 NORFIELD RD-USH 141 8 (6,14.22) 1. 22103 Kewaunee Nuclear Plant - 2022 Work Kewaunee $1.00 $1.00 29104, Green,Bay'5=22.Eliza Street'Reconstruction Brown $725,447.37 $725447,37 221105 August Winter- Little Chute- Agropur Outagamie $73,710.94 $73,710.94 VINTON CONSTRUCTION COMPANY 10/16/2023 1:54 PM PREVIOUS CONTRACTS 22167 Miron- Green Bay Water Utility Add, Paving Brown $9,7%00 $9,750.00 Joint Sealants 22108 NBA'- Lakeside Foods Section 1 Portion Manitowoc $22,071.118 $22,071.18 22109 Two Creeks- 2022 Nuclear Road Manitowoc $162,616.55 $152,515.55 Improvements 10/16/2023 1:54 PM VINTON CONSTRUCTION COMPANY 3 YEAR ANNUAL PROJECT SUMMARY sub 2021 Production Report 21001 West Bend Airport Washington $ 2,681,096.00 $ 2,681,096.00 21002 SEYMOUR-STH 55-#25(11.10.20) Outagamie $ 783,118.68 $ 783,118.68 21003 ELKHART LAKE-HWY 67422(11.10.20) Sheboygan $ 7,615,930,80 $ 7,615,930.80 21004 HOFFMAN-STH 29 - #11 (9,15,20) Brown $ 700,000,00 $ 700,000.00 21006 LARSON-CTH CC BRANCH APPLE CRK BRDG- Outagamie $ 101,128.04 $ 101,128.04 21007 #7(7.14.20) OAKFIELD-CTH D-#17(12.08.20) Fond du Lac $ 2,450,678.78 $ 2,450,678.78 21008 CAMPBELLSPORT-STH 67-#18(12.08.20) Fond du Lac $ 9,042,608,36 $ 9,042,608.36 21009 NEA-Robinson Metals -Manitowoc Manitowoc $ 115,677.00 $ 115,677.00 21011 Clayton Deer Trail Estates Winnebago $ 85,699.50 $ 85,699.50 21012 Michels - City Centre -Crane Load Out Manitowoc $ 31,582,50 $ 31,582.50 21013 WI Electric-T&M-(PBNP) Manitowoc $ 10,000.00 $ 10,000.00 21014 CABLE BARRIER #21(01.12.21) Sheboygan- $ 887,536.68 $ 887,536.68 Mtwc 21016 Two Creeks Park Restoration Two Rivers $ 16,332.25 $ 16,332,25 21017 NEA-U5H 151 CHILTON-VALDERS#19(12:08.20) Manitowoc $ 69,324.30 $ 69,324.30 21018 Dorner-Oshkosh21-04, W. 9th Ave Winnebago $ 1,345,561.00 $ 1,345,561,00 21019 Oneida Bread Creek Village Brown/Outag $ 1,098,226.99 $ 1,098,226.99 21021 CRUSHING -VARIOUS amle various $ 1.00 $ 1.00 21022 Washington Cty Hwy Dept -Germantown Goldendale Washington $ 229,971.68 $ 229,971.68 21023 Appleton A-21 Outagamie $ 4,614,694.74 $ 4,614,694,74 21024 Kiwanis Park Trail Ext, Sheboygan Sheboygan $ 113,087.32 $ 113,087.32 21026 Menomonee Falls-AppletonAve/Woosencraft Waukesha $ 318,713.71 $ 318,713.71 21027 Intersection DePere 21-06 Brown $ 247,223.00 $ 247,223.00 21028 Harrison Culvert & Roadway Calumet $ 289,182.40 $ 289,182.40 21029 PHEIFER-LINCOLN PARK BRDG,VILLARD,MILW- Milwaukee $ 185,357.16 $ 185,357A6 21031 # 15(2,9.21) PHEIFER-SUAMICO RIVER BRIDGE-#26(1.12.21) brown $ 85,723.68 $ 85,723.68 21032 NEA-MONTELLO-STH 22427(11.10.20) Waushara $ 252,910,37 $ 252,910.37 21033 New Berlin-Sunnyslope Waukesha $ 1,728,480.94 $ 1,728,480.94 21034 Greenfield-St.Francis Neighborhood-Phase2 Milwaukee $ 1,625,038.98 $ 1,625,038.98 21036 Germantown Wendy Lane WM Washington $ 309,551.25 $ 309,551.25 21037 NEA-MILW-GB IH43420(01.12.21) Sheboygan $ 216,099.06 $ 216,099.06 21038 DeGroot-Ashwaubenon-VanDerPerren Way Brown $ 64,416,75 $ 64,416,75 21039 CTH ZZ-WRIGHTSTOWN-#24(1.12.21) Brown/Outag $ 4,622,986.24 $ 4,622,986.24 amle 21041 MPU-Watermain Replacement on Quay St Manitowoc $ 67,620.65 $ 67,620.65 21042 BELLEVUE423(1.12.21) Brown $ 2,388,564.00 $ 2,388,564.00 21043 West Bend-7th Ave Reconstruction Washington $ 1,556,751..01 $ 1,556,751.01 21044 Appleton B-21 Outagamie $ 1,712,148.00 $ 1,712,148.00 21046 Combined Locks-2021 Street Reconstruct Outagamie $ 700,556,15 $ 700,556.15 21047 Grafton 2021 Street Improvements Ozaukee $ 2,663,971,95 $ 2,663,971.95 21048 Mntwc-WS-21-1 Concr Pave (Quay,Nagle,Magnolia) Manitowoc $ 385,283.61 $ 385,283.61 21049 Port Washington-2021 Street Improvements Ozaukee $ 2,489,402.20 $ 2,489,402,20 21051 Oshkosh Westhaven Circle Park Winnebago $ 179,970.00 $ 179,970.00 21052 DeGroot-GB Gray Street . Brown $ 914,342,59 $ 914,342.59 21053 Mtwc WS-21-4 Asphalt Concrete Paving Manitowoc $ 559,700.24 $ 559,700.24 f 10/16/2023 1:54 PM VINTON CONSTRUCTION COMPANY 3 YEAR Y{ ANNUAL PROJECT SUMMARY 21054 City of Campbellsport- crushing FDL $ 34,424.73 $ 34,424,73 21055 PBNP 2021 Security Work Two Rivers $ 742,567.92 $ 742,567.92 21056 PHEIFER-BLACK CREEK BRIDGE#14(3.09.21) Kewaunee $ 63,620.00 $ 63,620.00 21057 Mntwc-WS-21-15-RiverPoint Dev,PH 1 Manitowoc $ 3,131,641.56 $ 3,131,641.56 21058 Sheboygan-2021 Street(GeorgiaAve/S.10th) Sheboygan $ 2,269,084.25 $ 2,269,084.25 21059 Gibraltar- A-19- Change Order 5 (RE 20034) Door $ 39,565.00 $ 39,565.00 21060 Sheboygan Calumet Dr. Pavement Sheboygan $ 451,288.00 $ 451,288.00 Repair 21061 Mntwc-8th'& Maritime WO-21-12 Green Space/WS-21- Manitowoc $ 377,596.55 $ 377,596.55 13 Intersection 21062 Manitowoc-WS-21-8- S. 30th Street Manitowoc $ 1,999,982.67 $ 1,999 982.67 21063 Kocken Bros -Parking Lot Brown $ 169,270,20 $ 169,270.20 21064 Manitowoc-WS-21-10- Broadway St, Manitowoc $ 435,395.59 $ 435,395.59 21065 Milw County -Greenfield'- Layton Ave Milwaukee $ 4,825,884.45 $ 4,825,884.45 21066 Kimberly -Eisenhower Dr Street Reconstruction Outagamie $ 388201.00 $ 388,201.00 21067 DeGroot-Mtwc Wu-21-11 Sanitary Strm Swr Manitowoc $ 33,957.80 $ 33,957.80 21068 Bill & Judy Jochems-driveway Riley's Point Door $ 18,500.00 $ 18,500.00 21069 Green Bay-S. BayShore Dike Reinforcement Brown $ 443,553.75 $ 443,553,75 21070 Kimberly- RR St Concrete Multi -Model Trail St Recon Outagamie $ 276,107.13 $ 276,107.13 21071 Kruczek-24th St, Two Rivers Two Rivers $ 442,491.20 $ 442,491.20 21072 7ossart-Oshkosh Coape Ave Winnebago $ 634,245,50 $ 634,245,50 21073 Ailouez-Green Isle Park Paving Brown $ 2M,319.80 $ 228,319.80 21074 Outagamie County-2021 Concrete (CTH 00, CTH U) Outagamie $ 525,261.00 $ 5251261.00 21075 Highway Landscape -Mist Various $ 1,784.00 $ 1,784,00 21076 RELYCO-/#1.9-STH 29 (5.11.21) Shawano $ 1,032,232.50 $ 1,032,232.50 21077 Kaukauna- 1-21.2021 Concrete Paving Calumet $ 1,279,750.97 $ 1,279,750.97 21078 Hietpas- Neenah 1-21 Marathon Ave Winnebago $ 1,109,841.00 $ 1,109,841.00 21079 Lannon Water Main System Extension Waukesha $ 5,459,392.50 $ 5,459,392.50 21080 Advance -Madison St/25th, Two Rivers Manitowoc $ 566,256.00 $ 566,256.00 21081 Advance -Oshkosh 21-03 Oregon/FDL Rd Winnebago $ 938,309.41 $ 938,309A1 21082 Manitowoc -Haul Contaminated Soils Manitowoc $ 55,900,00 $ 55,900.00 21083 Little Chute Evergreen Project Outagamie $ 867,094.35 $ 867,094.35 21084 Mtwc-WS-21-2/WS-21-17-Concrete Paving II -Custer St Manitowoc $ 3,469,845.90 $ 3,469,845.90 21085 Mtwc-WS-21-25 -York St Prkg Lot Manitowoc $ 223,458.85 $ 223,458.85 21086 Mtwc-WB-21.23/WS-21-24-Camp Vits Privy- Manitowoc $ 240,140.97 $ 240,140.97 PrkgLot/Trail 21087 Appleton Airport-ATW 1008/AIP-59(4,756,225.00) Outagamie $ 150,000.00 $ 150,000.00 21088 MITW-Chief Little Wave Rd -Sidewalks Menominee $ 168,589.00 $ 168,589.00 21089 M1TW-CTH VV West Cultural Museum Sidewalk Menominee $ 125,650.38 $ 125,650.38 21090 Oshkosh 21-09 Prkg Lot Construction/Re-striping Winnebago $ 783,863.20 $ 783,863.20 21091 Crush- Neumann Agriprises, Inc- Brillion Calumet $ 4,090.65 $ 4,090.65 21092 Bowers-Neenah-2-21 Winnebago $ 558,071.50 $ 558,071.50 21093 Outagamie Cty-Appleton Airport Prkg Lot Outagamle $ 595,992.94 $ 595,992.94 21094 Peters -Green Bay Sewers 3-21 Danz Ave Brown $ 153,053.88 $ 153,053,88 21095 MPUPP 2105 Baghouse Manitowoc $ 88,534.00 $ 88,534.00 21096 Mtwc-WS-21-16 - Sidewalk -N.8th Manitowoc $ 219,676.05 $ 219,676.05 21097 Midwest Gen Cntrctrs-Oshkosh Hunter's Ridge Winnebago $ 241,139.21 $ 241,139.21 Subdivision t 10/16/2023 1:54 PM VINTON CONSTRUCTION COMPANY ANNUAL PROJECT SUMMARY 21098 Allle-curb Manitowoc 21099 Zabel-Sheb Falls (Glasstone, LLQ Prkg Lot Sheboygan 21100 Martell-Kenworth Parking Lot FDL 21101 FDL 2021 Concrete Rehab (w/Alternates) FDL 21102 Oshkosh 21-18 Pioneer Riverwalk Phase 1 Winnebago 21103 FCL Bldrs-GA Pacific W DePere Bus Prk (Grdg)(4,600,422) Brown 21104 Crush- Spielvogel Sheboygan 21105 Martell- Sawyer Airport Hangar (Gwinn, M1)- SAW-046-2020 Marquette, MI 21106 Peters Concrete-Batch(Airport Design Mix) Brown 21107 Buteyn-Peterson-Union Ave Road Improvement (addl Sheboygan work to 20088) 21108 Neenah 8-21 Jewelers Park Drive Trail Winnebago 21109 Bodart - Manitowoc SISP Signal Upgrades Manitowoc 21110 City of Manitowoc - T&M (10.18.21) Manitowoc 21111 Core & Main Parking Lot Brown 21112 Crush- Taylor RediMix Sheboygan 21113 NEA - Lakeside Foods - Truck Access Road Manitowoc 21114 PHEIFER-BRANCH APPLE CREEK/TOAD CREEK BRDGS Outagamle #15 WISDOT (8.10,21) 21115 Bodart Electric Parking Lot Brown 21116 Manitowoc Cty-Loader Rentals 11/21-4/22 Manitowoc $ 41,620.95 $ 236,180.45 $560,455,20 $ $819,965.67 $1,303,207.70 $3,450,316.50 $27,192.55 $1,00 $ $13,089.50 $ $ 16,220.00 $ $ 1,481,050.61 $ 134,075.50 $ $ 1.00 $ 216,066.98 $ 1.00 $ 8,410,00 $ $ 79,636�42 $ $ 79,752.49 $ 1.00 U 3 YEAR �(t $ 41,620.95 $ 236,180.45 560,455.20 $ 819,965.67 $ 1,303,207.70 $ 3,450,316.50 $ 27,192.55 1.00 13,089.50 16,220,00 $ 1,481,050.61 134,075.50 $ 1.00 $ 216,066.98 $ 1.00 8,410..00 79,636,42 $ 79,752.49 $ 1.00 Total $ 99,887,119.44 $ 9,215,119.82 $ 90,671,999.62 SUBCONTRACTS PRIME f 4f �psc NS/N Division of Transportation System Development Bureau of Project Development, Room 5437 4822 Madison Yards Way OFT Madison, WI 53705 n�' June 30, 2022 Vinton Construction Company 2705 N. Rapids Road, P.O. Box 1987 Manitowoc, WI 54221-1987 Expiration Date: May 1, 2024 Tony Evers, Governor Craig Thompson, Secretary Internet: Wsconsindot,aov Telephone: 608-266-1631 E-Mail: DOTDTSDBPD&dot_wi.goov The Experience Questionnaire and Financial Statement submitted by you for the purpose of obtaining prequalification ratings to permit bidding on work let under the direction of the Division of Transportation System Development have been reviewed. On the basis of the information contained in the statement, notification is hereby given that the following ratings have been assigned to you: (A) General Construction............................................................... $120,000,000 (B) Grading.....................................................................................$110,000,000 (C) Concrete Pavement.................................................................. $120,000,000 (D) Asphaltic Pavement......................................................................... $500,000 (E) Gravel & Crushed Stone.......................................................... $110,000,000 (F) Structures........................................................................................$500,000 (G) Railroad Construction or Rehabilitation ........................................... $500,000 (H) Bridge Painting ................ ................................................................ $100,000 (1) Street or Airport Lighting................................................................. $500,000 (J) Building Construction......................................................................$500,000 (K) Incidental Construction ....... ...................................................... $110,000,000 (M) Maximum Capacity ......................... ......... ........................ ......... $135,000,000 The above ratings will remain in effect until the indicated expiration date unless revised or terminated prior to that date. Sincerely, Jillene J. Fehrman, P.E. Chief Proposal Management Engineer JJF:mkw VINTON CONSTRUCTION CO... Road Contractors Equal Opportunity Employer P.O. Box 1987, Manitowoc, Wisconsin 54221-1987 Phone: 920-682-0375 Fax: 920-682-2838 Two Rivers Office: 1322 331d Street, P.O. Box 137, Two Rivers, WI 54241-0137 EQUIPMENT OWNED & AVAILABLE FOR USE ON CONSTRUCTION PROJECTS 6 CONCRETE SLIPFORM PAVERS 4 SLIPFORM CURB & GUTTER/BARRIER WALL MACHINES NUMEROUS MISCELLANEOUS CONCRETE SUPPORT EQUIPMENT 10 CENTRAL MIX CONCRETE PLANTS 44 TRACK BACKHOESIEXCAVATORS 18 RUBBER TIRED EXCAVATORS 7 LOADER BACKHOES 7 SHEEPSFOOT ROLLERS 24 SMOOTH DRUM ROLLERS 39 ENDLOADERS 6 GRADERS 217 SUPPORT TRUCKS 45 DUMP TRUCKS 17 REDI-MIX TRUCKS 4 OFF ROAD DUMP TRUCKS 30 TRACK DOZERS 3 TRACK LOADERS 24 SKID STEERS 2 SCRAPERS 2 IMPACT CRUSHERS 2 JAW CRUSHER Julie M. Reimer: Contract Administrator ireimer0yintonwis.coi 920- 657-2264 10/16/2023 VINTON CONSTRUCTION COMPANY'S PREVIOUS TEN YEAR OSHA CITATION HISTORY Inspection number 1429277 8/29/2019 Sewer crew working in Greenville Citation 1 item 1 Repeat other than serious $1,000.00 CIA - Employee standing on top of culvert to bolt bands together. Depth of trench at top of pipe was approximately 4'. Depth of trench below pipe was greater than 5. Degree of sloping insufficient for total trench protection. Affirmative Action: Emphasis on Trench Safety & Hazard Recognition, All sewer personnel are up to date on competent person training for trenching/excavation, continued jobsite Inspections focusing on trench safety. Periodic Trench Safety 5tanddown meetings, Inspection number 1339727 Sewer Crew working in Appleton. Citation 1 item 1 Citation 1 item 3 8/17/2018 Other -than -serious $1,000.00 Other -than -serious $3,000.00 C1.1- Excavator moved load of gravel over employee, while employee was in trench box. * Intention to Contest - under further review. C1.3 - Employee reached out of trench protection exposing upper body to 5.5' depth of trench. Affirmative Action: Emphasis on Trench safety &Hazard Recognition. All sewer personnel are up to date on competent person training for trenching/excavation. Contlnued jobsite inspections focusing on trench safety. Periodic Trench Safety 5tanddown meetings, inspection number 1265064 9/18/2017 Concrete Handcrew working in Oshkosh Citation 1 item 1 Other -than -serious $0.00 Employee wearing respirator was not clean shaven. * Intention to Contest - under further review. Affirmative Action: All employees requried to wear respirator are being retrained on procedure to wear and care for tight fighting respirators. Inspection number 1256117 8/17/2017 Sewer crew working in Manitowoc. Citation 1 item 1 Other -than -serious $2,908.50 Employee running gas powered cutoff saw not wearing safety glasses. Page 1 of 2 10/16/2023 Affirmative Action. All employees trained on required PPE for operating handheld cutoff saw, including hardhat with faceshieid, safety glasses and hearing protection. New hardhats equipped with faceshield and Integrated hearing protection provided to all crews with potential exposure to gas powered cut-off saws. inspection number 1143086 4/26/2016 Sewer crew was installing water main on Main Street In Sussex, WI when inspected by OSHA personnel. Citation 1 Item 1 Other -than -serious $0.00 Sewer crew was utilizing a trench box that was missing a pin to keep spreader bar locked in place. Affirmative Action: OSHA Standard requires a minimum of 1 competent person in excavation to be on -site. Vinton Construction Company has chosen to train all employees Involved in trenching and excavation to be Competent Person Trained. This training heavily discussesproper trench protection installation and maintentance. inspection number 1064023.015 5/14/2015 Concrete hand crew was pouring hand work on Hwy 96 in Wrightstown; WI when inspected by OSHA personnel. Citation 1 Item la rather -than -serious $990.00 Concrete crew was pouring concrete formulated with portland cemet without any soap available on site for washing. Settlement agreement Other -than -serious $693.00 Citation 1 item lb Concrete crew was pouring concrete formulated with portland cement without wearing gloves impervious to water and several employees had exposed skin on legs and forearms. Affirmative Action: All employees with potential bodily exposure to wet concrete are required to utilize proper PPE such as pants, gloves, rubber boots, long sleeves/skin barrier cream. All employees are notified of potential skin hazards when working with wet concrete. Inspection number 1055561.015 4/15/2015 Saw crew was cutting bridge approach patches on HWY 41 in Neenah, WI when inspected by OSHA personnel. Citation 1 Item 1 Serious $3,577,00 Saw crew was cutting bridge approach patches next to a parapet wall that was less than the required 39" for fall protection on elevated surfaces over 6'. The wall was 35 Settlement agreement Other -than -serious $2,146.00 Affirmative Action. Employees trained on requirements when working at heights greater than six feet. Designated foot,travel/work areas dilineated away from parapet wall. Parapet wall clamps purchased and Installed to meet required fall protection height on existing parapet wall. Page 2 of 2 VINTON CONSTRUCTION CO ... Road Contractors Equal Opportunity Employer P.O. Box 1987, Manitowoc, Wisconsin 64221-1987 Phone: 920-682-0375 Fax: 920-682-2838 Two Rivers Office: 1322 3314 Street, P.O. Box 137, Two Rivers, Wi 54241-0137 Bonding Company Travelers Casualty and Surety Company of America Hartford, CT AGENT Hausmann Group 740 Regent St., Suite 400 Madison, WI 53715 Agent: Patrick A, McKenna Phone: 608-252-9661 Total Bonding Capacity: $125,000,000 or more Julie M. Reianer: Contract Administrator jreinter@vintonwis.coni 920- 697-2264 HAUSMANN 40 GROUP May 22, 2023 RE: Vinton Construction Company To Whom It May Concern, We are pleased to offer this letter of recommendation on behalf of our valued account, Vinton Construction Company, Hausmann -Johnson Insurance, as the agent, and Travelers Casualty and Surety Company of America currently provide Bid Bonds, Performance & Payment Bonds and Miscellaneous bonding needs for Vinton Construction Company. In the past we have approved bonds for the Contractor in the low eight figure range. Those bids were based on I ppropriate conditions and contract terms at their individual times and bonds were written without restrictions. As we have a long standing relationship with Vinton Construction Company, their requests for surety bonds are considered as a part of the normal .course of business. Vinton Construction Company is current and in good standing with their bonding relationship. We have written bonds for projects approximating $26,000,000 and uncompleted backlogs in excess of $125,000,000: The writing of any specific bond is subject to underwriting review, which includes examination of contract terms and confirmation that project financing is in place. Our consideration and issuance of bonds is a matter solely between Vinton Construction Company., and ourselves, and we assume no liability to third parties or to you by issuance of this letter. Sincerely, PA" �" `z..--- Patrick A. McKenna, CPCU, AFSB Vice President of Surety 740 Regent Street, Suite 400, Madison, WI 53715 l P 608.257.3795 N25 W23050 Paul Road, Pewaukee, W153072 1 P 262,521.5700 1 W myhaus.com 200 N. Adams St Green Bay, WI 54301 920433-3023 PHONE May 23, 2023 RE: Vinton Construction Company P:O, Box 137 Two Rivers, WI 54241 To Whom It May Concern: At the request of Vinton -Construction Company, Manitowoc Wisconsin, we are glad to inform you that the company has maintained a satisfactory account with us for many years. All of our deposit and loan relationships have been entirely satisfactory. The company has available a $4,000,000.00 line of credit with us. We would be willing to grant such loan as may be necessary to complete any contracts which you may award -to them. Sincerely, Todd A. Bartels Senior Vice President Commercial Banking Assoalated Bank, N.A. Member FDIC. Equal Housing Lender and Equal Opportunity Lender. i VWA 2 3 20�,j ost"Kow 311v VINTON CONSTRUCTION COMPANY CONSOLIDATED FINANCIAL STATEMENTS YEARS ENDED DECEMBER 31, 2022 AND 2021 VINTON CONSTRUCTION COMPANY TABLE OF CONTENTS YEARS ENDED DECEMBER 31, 2022 AND 2021 INDEPENDENT AUDITORS' REPORT CONSOLIDATED FINANCIAL STATEMENTS CONSOLIDATED BALANCE SHEETS CONSOLIDATED STATEMENTS OF INCOME 3 CONSOLIDATED STATEMENTS OF STOCKHOLDERS' EQUITY 6 CONSOLIDATED STATEMENTS OF CASH FLOWS 7 NOTES TO CONSOLIDATED FINANCIAL STATEMENTS 9 OAW Stockholders Vinton Construction Company Manitowoc, Wisconsin CllftonlarsonAllen LLP CLAconnect.com INDEPENDENT AUDITORS' REPORT Report on the Audit of the Consolidated Financial Statements Opinion We have audited the accompanying consolidated financial statements of Vinton Construction Company, which comprise the consolidated balance sheets as of December 31, 2022 and 2021, and the related consolidated statements of income, stockholders' equity, and cash flows for the years then ended, and the related notes to the consolidated financial statements. In our opinion, the consolidated financial statements referred to above 'present fairly, in all material respects, the financial position of Vinton Construction Company as of December 31, 2022 and 2021, and the results of its operations and its cash flows for the years then ended in accordance with accounting principles generally accepted in the United States of,America, Basis for Opinion We conducted our audits in accordance with auditing standards generally accepted in.the United States. of America (GAAS). Our responsibilities under those standards are further described in the Auditors' Responsibilities for the Audit of the Consolidated Financial Statements section of our report. We are required to be independent of Vinton Construction Company and to meet our other ethical responsibilities in accordance with the relevant ethical requirements relating to our audits. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Responsibilities of Management for the Consolidated Financial Statements Management is responsible for the preparation and fair presentation of the consolidated financial statements in accordance with accounting principles generally accepted in the United. States of America, and for the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of consolidated financial statements that are free from material misstatement, whether due to fraud or error. In preparing the consolidated financial statements, management is required to evaluate whether there are conditions or events, considered in the aggregate, that raise substantial doubt about Vinton Construction Company's ability to continue as a going concern for one year after the date the consolidated financial statements are available to be issued. CLA (CliftonLar,onAllen LLP) Is an intlependent network member of CLA Global, See CLAQlobal.com/disclaimer. (1) Stockholders Vinton Construction Company Auditors' Responsibilities for the Audit of the Consolidated Financial Statements Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditors' report that includes our opinion. Reasonable assurance is a high level of assurance but is not absolute assurance and therefore is not a guarantee that an audit conducted in accordance with GAAS will always detect a material misstatement when it exists. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control. Misstatements are considered material if there is a substantial likelihood that, individually or in the aggregate, they would influence the judgment made by a reasonable user based on the consolidated financial statements. In performing an audit in accordance with GAAS, we: • Exercise professional judgment and maintain professional skepticism throughout the audit. • Identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud or error, and design and perform audit procedures responsive to those risks. Such procedures include examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. • Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of Vinton Construction Company's internal control. Accordingly, no such opinion is expressed. • Evaluate the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluate the overall presentation of the consolidated financial statements. • Conclude whether, in our judgment, there are conditions or events, considered in the aggregate, that raise substantial doubt about Vinton Construction Company's ability to continue as a going concern for a reasonable period of time. We are required to communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit, significant audit findings, and certain internal control related matters that we identified during the audit. CllftonLarsonAllen LLP Manitowoc, Wisconsin June 13, 2023 (2) VINTON CONSTRUCTION COMPANY CONSOLIDATED BALANCE SHEETS DECEMBER 31, 2022 AND 2021 2022 2021 ASSETS CURRENT ASSETS Cash and Cash Equivalents $ 5,058,022 $ 11,200,631 Receivables: Contract 17,717,783 19,516,993 Other 2,316,523 145,000 Contract Assets 605,012 591,173 Inventories 154,673 390,396 Current Maturities of Note Receivable - 49,000 Prepaid Insurance and Other 474,115 350,146 Total Current Assets 26,326,128 32,243,339 PROPERTY AND EQUIPMENT Land 871,744 871,744 Buildings and Improvements 4,518,735 4,034,845 Machinery and Equipment 41,196,220 36,521,172 Office Furniture and Fixtures 411,387 411,387 Vehicles 16, 621, 334 15,237,721 Total 63,619,420 57,076,869 Less Accumulated Depreciation 44,859,452 39,720,028 Net Property and Equipment 18,759,968 17,356,841 OTHER ASSETS Notes Receivable, Less Current Maturities: Related Parties 372,806 320,006 Unrelated Parties 181,942 182,863 Investments in Joint Ventures 288,834 398,597 Cash Surrender Value of Life Insurance 342,640 323,800 Investment in Cooperative 317,917 315,128 Deposits 9,945 13,909 Total Other Assets 1,514,084 1,554,303 Total Assets $ 46,600,180 $ 51,154,483 See accompanying Notes to Consolidated Financial Statements. (3) VINTON CONSTRUCTION COMPANY CONSOLIDATED BALANCE SHEETS (CONTINUED) DECEMBER 31, 2022 AND 2021 LIABILITIES AND STOCKHOLDERS' EQUITY CURRENT LIABILITIES Current Maturities of Long -Term Debt Accounts Payable: Trade Retainage Contract Liabilities Accrued Liabilities: Payroll and Payroll Taxes Union Benefits Profit Sharing Property Taxes Interest Other Accrued Distributions Total Current Liabilities OTHER LIABILITIES Long -Term Debt, Less Current Maturities Note Payable -- Stockholder Total Other Liabilities Total Liabilities STOCKHOLDERS' EQUITY Controlling Interest: Common Stock Additional Paid -In Capital Retained Earnings Total Controlling Interest Noncontrolling Interest Total Stockholders' Equity Total Liabilities and Stockholders' Equity See accompanying Notes to Consolidated Financial Statements. (4) 2022 2021 $ 625,572 $ 636,000 5,409,049 6,732,874 1,390,709 1,076, 867 63,750 27,000 242,984 181,850 302,503 219,299 225,686 218,531 62,988 70,726 156,059 139,653 1,749 339 - 1,184,000 8,481,049 10,487,139 - 624,606 315,962 315,962 315,962 940,568 8,797,011 11,427,707 10,000 10,000 129,400 129,400 36,550,600 38,558,039 36,690,000 38,697,439 1,113,169 1,029,337 37,803,169 _ 39,726,776 $ 46,600,180 $ 51,154,483 VINTON CONSTRUCTION COMPANY CONSOLIDATED STATEMENTS OF INCOME YEARS ENDED DECEMBER 31, 2022 AND 2021 2022 2021 CONTRACT REVENUES EARNED $ 105,686,108 100,00% $ 104,999,176 100.00% COST OF REVENUES EARNED 98,367,763 93.08 98,743,531 94.04 GROSS PROFIT 7,318,345 6.92 6,255,645 5.96 GENERAL AND ADMINISTRATIVE EXPENSES 3,657,531 3,46 3,436,792 3.27 INCOME FROM OPERATIONS 3,660,814 3,46 2,818,853 2.68 OTHER INCOME (EXPENSE) Interest Expense (37,780) -0.04 (21,710) -0.02 Interest Income 205,612 0.19 92,054 0.09 Income from Joint Ventures 21,063 0,02 21,240 0.02 Gain on Extinguishment of Debt - 0.00 5,275,000 5.02 Other Income 2,412,132 2,28 260,102 0.25 OTHER INCOME, NET 2,601,027 2.46 5,626,686 5.36 INCOME BEFORE PROVISION FOR INCOME TAXES 6,261,841 5.92 8,445,539 8,04 PROVISION FOR INCOME TAXES 264,752 0.25 1,146,270 1.09 CONSOLIDATED NET INCOME 5,997,089 5,67 7,299,269 6.95 Less: Net Income Attributable to the Noncontrolling Interest (83,832) -0.08 (80,491) -0.08 NET INCOME ATTRIBUTABLE TO VINTON CONSTRUCTION COMPANY $ 5,913,257 5.60 $__ 7,218,778 6.88 See accompanying Notes to Consolidated Financial Statements. (5) It LUJ r (/� N R� O LU N �- A A Z�z 40Q 0() CI VON Z O( j M U.WM 1W G U ZnLLI OWA Uf—A 0V)Z Z `Q w >� Aw J >- O z O U 00 It i m m 0 ) 00 0 0) 00 (r) ce) 0) d 00 N 00 c- c�- 0 c- 0 z (gyp 00 O M Lf 0) O (O O d N (D O cV Co (M o n O C m � c N � M U 00 m CD p N � o O N C C N - 0000 co LO 0 a N CD to m 'E LO N Y V) 0') 0)In cli LLI cq M ~ f M I` M (f} ffl a oC5 CD o (0CL d N b I Q LL of v 0 o O o O o O O O C7 O Cp O O O 0 �- E 0 01 69-11 c 0 O c c N N p c�`I M W W W c �c n�U 2-U WWO 61> VU U o o 0) A n 0 A 0 C° o to of E o o i 0) a) c 0t- oYs z A z [ z E' 0 0 0 VINTON CONSTRUCTION COMPANY CONSOLIDATED STATEMENTS OF CASH FLOWS YEARS ENDED DECEMBER 31, 2022 AND 2021 2022 2021 CASH FLOWS FROM OPERATING ACTIVITIES Consolidated Net Income $ 5,997,089 $ 7,299,269 Adjustments to Reconcile Consolidated Net Income to Net Cash Provided by Operating Activities: Depreciation 5,518,470 5,015,313 Increase in Cash Surrender Value of Life Insurance (18,840) (18,167) Increase in Investment in Cooperative (2,789) (9,805) Gain on Extinguishment of Debt - (5,275,000) Gain on Sale of Property and Equipment (149,065) (225,599) Income from Joint Ventures (21,063) (21,240) (Increase) Decrease in: Receivables (372,313) (5,412,388) Contract Assets (13,839) (292,836) Inventories 235,723 (214,745) Prepaid Insurance and Other (123,969) (146,915) Increase (Decrease) in: Accounts Payable (1,009,983) 3,751,085 Contract Liabilities 36,750 (270,898) Customer Deposits - (21,406) Accrued Liabilities 161,571 (12,989) Net Cash Provided by Operating Activities 10,237,742 4,143,679 CASH FLOWS FROM INVESTING ACTIVITIES Purchases of Property and Equipment, Net of Deposits and Trade -In Allowances (6,809,133) (7,637,935) Proceeds from Sale of Property and Equipment 40,565 278,629 Net (Increase) Decrease in Notes Receivable (2,879) 26,874 Capital Contributed to Joint Ventures (5,800) (8,420) Distributions from Joint Ventures 136,626 57,981 Net Cash Used by Investing Activities (6,640,621) (7,282,871) CASH FLOWS FROM FINANCING ACTIVITIES Principal Payments on Long -Term Debt (635,034) (686,914) Distributions Paid — Controlling 9,104,696) (2,662,0091 . Net Cash Used by Financing Activities (9,739,730) (3,248,914) See accompanying Notes to Consolidated Financial Statements. (7) VINTON CONSTRUCTION COMPANY CONSOLIDATED STATEMENTS OF CASH FLOWS (CONTINUED) YEARS ENDED DECEMBER 31, 2022 AND 2021 CHANGE IN CASH AND CASH EQUIVALENTS Cash and Cash Equivalents - Beginning of Year CASH AND CASH EQUIVALENTS - END OF YEAR SUPPLEMENTAL DISCLOSURES OF CASH FLOW INFORMATION Cash Paid for Interest Cash Paid for Income Taxes SUPPLEMENTAL DISCLOSURE OF NONCASH INVESTING AND FINANCING ACTIVITIES Equipment Trade -In Allowances See accompanying Notes to Consolidated Financial Statements, (8) 2022 2021 $ (6,142,609) $ (6,388,106) 11,200,631 17, 588,737 $ 5,058,022 $ 11,200,631 21,374 45,610 $ 474,000 $ 1,146,270 $ 10'500 $ 61,300 VINTON CONSTRUCTION COMPANY —Road Contractors An Equal Opportunity Employer VINTON P.O. Box 1s R 2705 N. Rapids Road Manitowoc, WI 54221-1987 Office (920) 682-0375 4Fax (920) 682-2838 Bidders Proof of Responsibility VINTON CONSTRUCTION COMPANY STATEMENT OF CONSOLIDATED FINANCIAL CONDITION DECEMBER 31, 2022 AND 2021 ASSETS CURRENT ASSETS Cash on Hand and in Banks Receivables: Contract Other Contract Assets Stock of Materials and Supplies Current Maturities of Note Receivable Other Current Assets Total Current Assets 2022 2021 $ 5,058,022 $ 11,200,631 17,717,783 19, 516,993 2,316,523 145,000 605,012 591,173 154,673 390,396 - 49,000 474,115 350,146 PROPERTY, PLANT AND EQUIPMENT - At cost less depreciation 26,326,128 32,243,339 Land 871,744 871,744 Buildings and Improvements 2,686,409 2,365,989 Machinery and Equipment 15,148,518 13,894,547 Other Fixed Assets 53,297 224,561 OTHER ASSETS TOTAL ASSETS LIABILITIES CURRENT LIABILITIES Accounts Payable Notes Payable including interest payable within one year from date of financial statement Contract Liabilities Accrued Wages and Payroll Taxes Other Current Liabilities Total Current Liabilites LONG TERM LIABILITIES Long Term Debt, Less Current Maturities TOTAL LIABILITIES NET WORTH Members' Equity Capital Stock Paid in Surplus Retained Earnings TOTAL NET WORTH 1,514,084 1,554,303 46,600,180 51,154,483 6,799,758 7,809,741 781,631 775,653 63,750 27,000 242,984 181,850 592,926 1,692,895 8,481,049 10,487,139 315,962 940,568 8,797,011 11,427,707 1,113,169 1,029,337 10,000 10,000 129,400 129,400 36,550,600 38,558,039 37,803,169 39,726,776 TOTAL LIABILITIES AND NET WORTH 46,600,180 51,154,483 \ANTON CONSTRUCTION COMPANY... P.O, Box 137, Two Rivers, WI 54241 Phone: 920-682-0375 Fax: 920-682-2838 Date: October 161h, 2023 Municipality ! Contractor: City of Oshkosh RE: Bidder's Qualification 2024 Enclosed with the attached Bidder's Qualification are the following (checked) documents: ® 1) Employee Experience ® 2) Corporate Officers 0,3) Equipment List M 4) 5 Year -project Report © 5) Trade References © 6) Bonding Information 7) Work Type Classifications Requesting Prequalification 0 8) WisDOT Certification Letter M 9) Bank Letter 0 10) Accounting Forms -- Will be sent under separate cover by accounting dept. IN 1 1) Incomplete Work/ Work In Progress Julie M. Reimer: Contract Administrator ireimer2vintonwis.cam 920.657.2264 VINTON CONSTRUCTION CO... Road Contractors Equal Opportunity Employer P.O. Box 1987, Manitowoc, Wisconsin 54221-1987 Phone:, 920-682-0375 Fax: 920-682-2838 Two Rivers Office: 1322 331d Street, P.O. Box 137, Two Rivers, WI 54241-0137 VINTON CONSTRUCTION COMPANY 2024 CORPORATE OFFICERS PRESIDENT MICHAEL J. MAPLES VICE-PRESIDENTS RICHARD P. LAMERS JEFFREY M. MAPLES SECRETARY MARY G. MAPLES TREASURER MICHAEL J. MAPLES Julie M. Reimer, Contract Administrator ireimerCbvintonwis.com 920- 657-2264 VINTON CONSTRUCTION CO... Road Contractors Equal Opportunity Employer P.O. Box 1987, Manitowoc, Wisconsin 54221-1987 Phone: 920-682-0375 Fax: 920-682-2838 Two Rivers Office: 1322 3314 Street, P.O. Box 137, Two Rivers, W1 54241-0137 CLASS OF WORK QUALIFIED FOR CONCRETE PAVING ANCILLARY CONCRETE CURB & GUTTER SIDEWALKS / DRIVEWAYS GRADING / EXCAVATION DEMOLITION SITE DEVELOPMENT SANITARY & STORM SEWER WATER MAIN LIFT STATIONS JOINT SEALING SAWING CRUSHING LANDSCAPING Julie M. Reimer: Conti•actAdininistrator jreimerOvintonwis.com 920- 657-2264 VINTON CONSTRUCTION CO... Road Contractors Equal Opportunity Employer P.O. Box 1987, Manitowoc, Wisconsin 64221-1987 Phone: 920-682-0375 Fax: 920-682-2838 Two Rivers Office: 1322 331d Street, P.O. Box 137, Two Rivers, WI 54241-0137 2024 TRADE REFERENCES County Materials P.O. Box 100 Marathon, WI 54448 Phone: 715-848-1365 Fax: 715-443-3691 Email: matthew.muchow@countymaterials.com Ferguson Waterworks 5350 North Richmond Street Appleton, Wl 54913 Phone: 920-731-3252 Fax: 920-731-2305 Email: nikki.heiting@ferguson.com Aring Equipment P.O. Box 5912 Butler, WI 53007 Phone: 262-781-3770 Fax: 262-781-3495 Email: swatson@aring.com Fabick CAT PO Box 952121 St Louis, MO 63195-2121 Phone: 636-343-5900 ext 2970 Email credit@fabickcat.com Julie M. Renner: ContractAdininistrator jreimer@yintonwis.coni 920- 657-2264