Loading...
HomeMy WebLinkAbout2001-Plumbing (water heater) 0 CITY OF OSHKOSH No 90150 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 113 W 18TH AVE Owner GAIL LEE HUGHES Create Date 04/05/2001 Contractor D.R. HANSEN PLBG. Category 411 -Residential-Water Heaters Plan Inspector Bathtub 0 Clothes Wshr 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0 Whirlpool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 0 San Sump/Pump 0 FIr/Wst Sink 0 Bidet 0 Site Drain 0 Misc. 0 Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. 0 Fixtures Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0 Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0 Dishwasher 0 Local Waste 0 Sculry Sink 0 Drink Ftn 0 Int Grease Trap 0 Floor Drain 0 Bar Sink 0 Sery Sink 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 1 Use/Nature REPLACE NG WTR HTR of Work Size Material Type # Conn.Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcel Id# 0 1401320000 Valuation $400.00 Plan Approval $0.00 Permit Fees $20.00 LJ Permit Voided Issued By Date 10/05/2001 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 -0000 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.