Loading...
HomeMy WebLinkAboutPSI_Agreement-2023_Sub_Inv_(Part_1)_7-27-22I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 1 of 8 AGREEMENT This AGREEMENT, made on the _____ day of ________________, 2022, by and between the CITY OF OSHKOSH, party of the first part, hereinafter referred to as CITY, and PROFESSIONAL SERVICE INDUSTRIES, INC., 3009 Vandenbroek Road, Kaukauna, WI 54130, party of the second part, hereinafter referred to as the CONSULTANT, WITNESSETH: The CITY and the CONSULTANT, for the consideration hereinafter named, enter into the following AGREEMENT for SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVLUATION FOR 2023 CAPITAL IMPROVEMENT PROJECTS (PROJECT). ARTICLE I. PROJECT MANAGER A. Assignment of Project Manager. The CONSULTANT shall assign the following individual to manage the PROJECT described in this AGREEMENT: Patrick Bray, E.I.T. – Branch Manager B. Changes in Project Manager. The CITY shall have the right to approve or disapprove of any proposed change from the individual named above as Project Manager. The CITY shall be provided with a resume or other information for any proposed substitute and shall be given the opportunity to interview that person prior to any proposed change. ARTICLE II. CITY REPRESENTATIVE The CITY shall assign the following individual to manage the PROJECT described in this AGREEMENT: Mike Blank – Construction Management Supervisor ARTICLE III. SCOPE OF WORK The CONSULTANT shall provide the services described in the CITY’S Request for Proposal. The CITY may make or approve changes within the general Scope of Services DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA 28th July I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 2 of 8 in this AGREEMENT. If such changes affect CONSULTANT's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT. Services included in the Miscellaneous Projects section of the CITY’s Proposal Cost Breakdown will be detailed further within individual Project Authorizations. A sample Project Authorization form is attached to this AGREEMENT. All reports, drawings, specifications, computer files, field data, notes, and other documents and instruments prepared by the CONSULTANT as instruments of service shall become property of the CITY upon payment for those documents by the CITY to the CONSULTANT, and shall remain the property of the CITY. ARTICLE IV. STANDARD OF CARE The standard of care applicable to CONSULTANT's services will be the degree of skill and diligence normally employed by professional consultants or consultants performing the same or similar services at the time said services are performed. CONSULTANT will re-perform any services not meeting this standard without additional compensation. ARTICLE V. OPINIONS OF COST, FINANCIAL CONSIDERATIONS, AND SCHEDULES In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, CONSULTANT has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, it is understood between the parties the CONSULTANT makes no warranty the CITY's actual project costs, financial aspects, economic feasibility, or schedules will not vary from CONSULTANT's opinions, analyses, projections, or estimates. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 3 of 8 ARTICLE VI. RECORD DRAWINGS Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others. CONSULTANT is not responsible for any errors or omissions in the information from others the CONSULTANT reasonably relied upon and are incorporated into the record drawings. ARTICLE VII. CITY RESPONSIBILITIES The CITY shall furnish, at the CONSULTANT’s request, such information as is needed by the CONSULTANT to aid in the progress of the PROJECT, providing it is reasonably obtainable from City records. To prevent any unreasonable delay in the CONSULTANT’s work, the CITY will examine all reports and other documents and will make any authorizations necessary to proceed with work within a reasonable time period. ARTICLE VIII. ASBESTOS OR HAZARDOUS SUBSTANCES If asbestos or hazardous substances in any form are encountered or suspected, CONSULTANT will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. If asbestos is suspected, CONSULTANT will, if mutually agreed, manage the asbestos remediation activities using a qualified subcontractor at an additional fee and contract terms to be negotiated. If hazardous substances other than asbestos are suspected, CONSULTANT will, if mutually agreed, conduct tests in an effort to determine the extent of the problem and will perform the necessary studies and recommend the necessary remedial measures at an additional fee and contract terms to be negotiated. The CITY recognizes CONSULTANT assumes no risk and/or liability for a waste or hazardous waste site originated by other than the CONSULTANT. ARTICLE IX. CITY’S INSURANCE The CITY will maintain property insurance on all pre-existing physical facilities associated in any way with the PROJECT. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 4 of 8 The CITY will provide (or have the construction contractor(s) provide) a Builders Risk All Risk insurance policy for the full replacement value of all project work including the value of all onsite CITY-furnished equipment and/or materials associated with CONSULTANT's services. Upon request, the CITY will provide CONSULTANT a copy of such policy. ARTICLE X. TIME OF COMPLETION The work to be performed under this AGREEMENT shall be commenced and the work completed within the time limits as agreed upon in the CITY’s Request for Proposal. The CONSULTANT shall perform the services under this AGREEMENT with reasonable diligence and expediency consistent with sound professional practices. The CITY agrees the CONSULTANT is not responsible for damages arising directly or indirectly from any delays for causes beyond the CONSULTANT’s control. For the purposes of this AGREEMENT, such causes include, but are not limited to, strikes or other labor disputes, severe weather disruptions or other natural disasters, failure of performance by the CITY, or discovery of any hazardous substances or differing site conditions. If the delays resulting from any such causes increase the time required by the CONSULTANT to perform its services in an orderly and efficient manner, the CONSULTANT shall be entitled to an equitable adjustment in schedule. While CONSULTANT has made reasonable efforts to incorporate into their plan for the PROJECT any known current project impacts of the COVID-19 pandemic, CONSULTANT has not accounted for, and is not responsible for, unknown future changes due to the COVID-19 pandemic, including, without limitation, additional restrictions by government agencies or others (such as the availability of the site for access or the availability of CITY or CONSULTANT staff or others) to the extent they delay or otherwise impact the PROJECT. In that event, CONSULTANT will notify CITY and work in good faith to equitably address any unexpected impacts therefrom. ARTICLE XI. COMPONENT PARTS OF THE AGREEMENT This AGREEMENT consists of the following component parts, all of which are as fully a part of this AGREEMENT as if herein set out verbatim, or if not attached, as if hereto attached: 1. This Instrument 2. CITY’s Request for Proposal dated June 29, 2022 and attached hereto 3. CONSULTANT’s Proposal dated July 18, 2022 and attached hereto DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 5 of 8 4. Individual Project Authorization Forms. In the event any provision in any of the above component parts of this AGREEMENT conflicts with any provision in any other of the component parts, the provision in the component part first enumerated above shall govern over any other component part which follows it numerically except as may be otherwise specifically stated. ARTICLE XII. PAYMENT A. The Agreement Sum. The CITY shall pay to the CONSULTANT for the performance of the AGREEMENT the total sum as set forth below, adjusted by any changes hereafter mutually agreed upon in writing by the parties hereto:  Time and Materials Not to Exceed $54,224.50 (Fifty Four Thousand Two Hundred Twenty Four Dollars and Fifty Cents).  Attached fee schedule shall be firm for the duration of this AGREEMENT. B. Method of Payment. The CONSULTANT shall submit itemized monthly statements for services. The CITY shall pay the CONSULTANT within thirty (30) calendar days after receipt of such statement. If any statement amount is disputed, the CITY may withhold payment of such amount and shall provide to CONSULTANT a statement as to the reason(s) for withholding payment. C. Additional Costs. Costs for additional services shall be negotiated and set forth in a written amendment to this AGREEMENT executed by both parties prior to proceeding with the work covered under the subject amendment. D. Indirect Costs. Indirect costs such as computer time, printing, copying, cell phone charges, telephone charges, and equipment rental shall be considered overhead and shall not be invoiced separately to the PROJECT. E. Expenses. Expenses may be billed with up to a maximum of ten percent (10%) mark-up. All invoices with expenses shall include supporting documentation of the expense. Failure to include the supporting documentation will result in the reduction of payments by the amount of those expense(s) not including documentation. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 6 of 8 ARTICLE XIII. STANDARD PROVISIONS The CONSULTANT agrees that, in all hiring or employment made possible by or resulting from this AGREEMENT, there will not be any discrimination against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. ARTICLE XIV. HOLD HARMLESS The CONSULTANT covenants and agrees to protect and hold the City of Oshkosh harmless against all actions, claims, and demands to the proportionate extent caused by or resulting from the intentionally wrongful or negligent acts of the CONSULTANT, their agents or assigns, their employees, or their subcontractors related to the performance of this AGREEMENT or be caused or result from any violation of any law or administrative regulation, and shall indemnify the CITY for all sums including court costs, attorney fees, and damages of any kind which the CITY may be obliged or adjudged to pay on any such claims or demands upon the CITY’s written demand for indemnification or refund for those actions, claim, and demands caused by or resulting from intentional or negligent acts as specified in this Paragraph. Subject to any limitations contained in Sec. 893.80 and any similar statute of the Wisconsin Statutes, the CITY further agrees to hold CONSULTANT harmless from any and all liability, including claims, demands, losses, costs, damages, and expenses of every kind and description (including death), or damages to person or property arising out of re-use of the documents without consent where such liability is founded upon or grows out of the acts or omission of any of the officers, employees, or agents of the City of Oshkosh while acting within the scope of their employment. ARTICLE XV. INSURANCE The CONSULTANT agrees to abide by the attached City of Oshkosh Insurance Requirements. ARTICLE XVI. TERMINATION A. For Cause. If the CONSULTANT shall fail to fulfill in timely and proper manner any of the obligations under this AGREEMENT, the CITY shall have the right to terminate this AGREEMENT by written notice to the CONSULTANT. In this event, the CONSULTANT shall be entitled to compensation for any satisfactory, usable work completed. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 7 of 8 B. For Convenience. The CITY may terminate this AGREEMENT at any time by giving written notice to the CONSULTANT no later than ten (10) calendar days before the termination date. If the CITY terminates under this Paragraph, then the CONSULTANT shall be entitled to compensation for any satisfactory work performed to the date of termination. This document and any specified attachments contain all terms and conditions of the AGREEMENT and any alteration thereto shall be invalid unless made in writing, signed by both parties and incorporated as an amendment to this AGREEMENT. ARTICLE XVII. RE-USE OF PROJECT DOCUMENTS All reports, drawings, specifications, documents, and other deliverables of CONSULTANT, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Subject to individual review, CONSULTANT’S reports, drawings, specifications, documents, or other deliverables will generally be considered public records that are available to the public upon request. Neither the CITY nor the CONSULTANT, therefore, has control of these documents once they are disclosed as a public record. It is understood between these two (2) parties, however, that CONSULTANT does not intend to state or imply that the PROJECT documents it creates have any purpose unrelated to the PROJECT. To the extent the CITY may re-use or reference any part of the CONSULTANT’S documents or information on unrelated projects, the CITY agrees to independently verify their applicability for unrelated projects and further agrees the Standard of Care applicable to the documents for this PROJECT will not apply to their re-use or reference in unrelated projects. ARTICLE XVIII. SUSPENSION, DELAY, OR INTERRUPTION OF WORK The CITY may suspend, delay, or interrupt the services of CONSULTANT for the convenience of the CITY. In such event, CONSULTANT's agreement price and schedule shall be equitably adjusted. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\PSI 2023 Sub Inv\PSI Agreement-2023 Sub Inv_7-27-22.docx Page 8 of 8 ARTICLE XIX. NO THIRD-PARTY BENEFICIARIES This AGREEMENT gives no rights or benefits to anyone other than the CITY and CONSULTANT and has no third-party beneficiaries. In the Presence of: CONSULTANT ____________________________ By: _____________________________ ____________________________ Patrick Bray, E.I.T. (Seal of CONSULTANT Branch Manager if a Corporation) By: _____________________________ _____________________________ (Specify Title) CITY OF OSHKOSH _____________________________ By: _____________________________ (Witness) Mark A. Rohloff, City Manager _____________________________ And: _____________________________ (Witness) Jessi L. Balcom, City Clerk APPROVED: I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this AGREEMENT. _____________________________ City Attorney ___________________________________ City Comptroller DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Sample Proj Auth_6-29-22.docx Page 1 of 1 PROJECT AUTHORIZATION NUMBER ______ ("Task Order") Owner: City of Oshkosh Department Public Works Authorized Office: 215 Church Avenue, P.O. Box 1130, Oshkosh, Wisconsin 54903-1130 Owner-Authorized Representative: Mike Blank, Construction Management Supervisor Contract: 2023 CIP Subsurface Exploration and Geotechnical Engineering Evaluation City of Oshkosh Contract Number: __________ Consultant’s Project Number: ________ The authorizing office requires performance of the following described Services: Form of Compensation: Unit Rate Not-to-Exceed: $___________________ Additional Terms and Conditions: None Authorized Services shall be performed in accordance with the terms and provisions of the agreement between Consultant and the City of Oshkosh dated _____________. This Project Authorization shall be effective only upon date of signature of an authorized representative of the City of Oshkosh. CONSULTANT Signature: Name: _____________________________ Title: Date: CITY OF OSHKOSH Signature: Name: __Mike Blank_________________ Title: Construction Management______ Supervisor ____________ Date: DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Cover Letters\PSI Cover Ltr_6-29-22.docx Page 1 of 2 City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us June 29, 2022 Patrick Bray Professional Services Industries, Inc. 1125 West Tuckaway Lane, Suite B Menasha, WI 54952 E-Mail: patrick.bray@psiusa.com RE: Request for Proposals for Subsurface Exploration and Geotechnical Engineering Evaluation for 2023 Capital Improvement Projects Dear Patrick: The City of Oshkosh is hereby requesting proposals be submitted for Subsurface Exploration and Geotechnical Engineering services related to the City’s 2023 Capital Improvement projects. The purpose of this exploration program is to identify the soil and groundwater conditions within the depths of the project excavations. The reports are to provide a summarization of pavement and base coarse thicknesses; soil type verification; bedrock depth, if encountered; and groundwater levels. In addition, field screening of the soil samples is to be completed to identify potential environmentally- impacted soil. The proposal shall include, at a minimum: related project experience, planned project team and resumes, engineering fee schedule, and a breakdown of costs, as requested in the enclosed Scope of Services. This agreement will have thirteen (13) separate deliverables, each with unique due dates that are also listed in the Scope of Services. The proposals will be reviewed for completeness and how well it is demonstrated the needs of the City of Oshkosh can be met. The award of this work will not be based solely on cost of the proposal. Questions regarding this Request for Proposals shall be emailed to me at mblank@ci.oshkosh.wi.us (with the subject heading of “2023 Subsurface Exploration and Geotechnical Engineering Evaluation RFP Questions”) by 12:00 noon on Thursday, July 14, 2022. The questions and appropriate responses will be distributed to all parties receiving this Request for Proposals by 12:00 noon on Friday, July 15, 2022. Please submit one (1) hard copy and one (1) pdf copy of the proposal to Tracy Taylor no later than noon on Tuesday, July 19, 2022. It is anticipated the award of this agreement will be made by Tuesday, July 26, 2022. Please ensure you have the proper insurance paperwork, so the award is not delayed. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Cover Letters\PSI Cover Ltr_6-29-22.docx Page 2 of 2 Enclosed with this letter are copies of the Scope of Services, Proposal Cost Breakdown, Boring Location Maps, Sample Boring Log, Standard Engineering Services Agreement, Sample Project Authorization Form, Professional Services Liability Insurance Requirements, and the Pollution Exposures Liability Insurance Requirements. The information contained within these enclosures shall become a part of the agreement with the Consultant selected to perform the Services. If you have any questions, please do not hesitate to contact us. Sincerely, Mike Blank Construction Management Supervisor MB/tlt Enclosures cc: James Rabe, P.E., CPESC, Director of Public Works Steven M. Gohde, P.E., Assistant Director of Public Works / Utilities General Manager Justin Gierach, P.E., Engineering Division Manager / City Engineer File DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Scope of Services_6-29-22.docx Page 1 of 6 SCOPE OF SERVICES FOR SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES 2023 CAPITAL IMPROVEMENT PROJECTS 1. The scope of services for this agreement is to identify subsurface conditions within the depths of various project excavations. The final reports are to provide a summarization of existing pavement and base coarse thicknesses; soil classifications; bedrock depth, if encountered; groundwater levels; and deep utility construction recommendations. Soil samples shall be split and provided to the Environmental Services Consultant for field screening and to identify potential environmentally-impacted soils. Reports shall be prepared in general accordance with normally-accepted geotechnical engineering practices. A total of 96 soil borings are anticipated for the following Capital Improvement projects: A. Coolidge Avenue (Bauman Street to the Fox River) 1. (2) – 20-ft. borings. 2. Pavement type is road mix with 2013 2” cold mix overlay. B. West Lincoln Avenue (Elmwood Avenue to Jackson Street) 1. (7) – 25-ft. borings. 2. Pavement type is 1977 hot mix asphalt. C. McKinley Street (West Lincoln Avenue to Scott Street) 1. (4) – 15-ft. borings. 2. Pavement type is 1905 road mix. D. Arthur Avenue (North Sawyer Street to Bauman Street) 1. (6) – 20-ft. borings. 2. Pavement type is 1929 hot mix asphalt. E. Tyler Avenue (North Sawyer Street to Bauman Street) 1. (6) – 25-ft. borings. 2. Pavement type is 1939 concrete. F. Bauman Street (Tyler Avenue to Van Buren Avenue) 1. (2) – 25-ft. borings. 2. Pavement type is 1925 road mix (2003 one inch (1”) hot mix asphalt overlay). G. Lake Butte Des Morts Drive (Ryf Road to Westwind Road) 1. (11) – 25-ft. borings. 2. Pavement type is 2010 concrete. H. Oak Street (East Irving Avenue to Siewert Trail) 1. (6) – 15-ft. borings. 2. Pavement type is 1988 7” concrete. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Scope of Services_6-29-22.docx Page 2 of 6 I. Beech Street (Congress Avenue to West Murdock Avenue) 1. (8) – 15-ft. borings. 2. Pavement type is 1980 7” concrete. J. Hollister Avenue (Algoma Boulevard to Sheridan Street) 1. (5) – 15-ft. borings. 2. Pavement type is 1995 7” concrete. K. Clarks Court (Hollister Avenue to the cul-de-sac) 1. (2) – 15-ft. borings. 2. Pavement type is 1980 hot mix. L. Lakeshore Park Trail 1. (7) – 10 ft. borings. 2. Pavement type is gravel and turf. M. Parking Lot Improvements (300 West Parking Lot – 115 Algoma Boulevard) 1. (3) – 15-ft. borings. 2. Pavement is asphalt parking lot. N. Parking Lot Improvements (400 West Parking Lot – 17 Church Avenue) 1. (4) – 15-ft. borings. 2. Pavement is asphalt parking lot. O. Miscellaneous Additional Project(s) 1. (5) – 15-ft. borings. 2. (5) – 20-ft. borings. 3. Miscellaneous borings for any potential project(s) added to the Capital Improvements Program. P. Environmental-Only Drilling 1. (10) – 10-ft. borings. 2. Environmental-only borings to document extent of potential contamination. 2. The City of Oshkosh (City) will perform the following tasks: A. Provide Geotechnical Services Provider with diagrams/maps indicating general locations and drilling depths of individual borings prior to work commencing. B. Retain services of an Environmental Services Consultant to provide suspect locations for sampling and other pertinent information, prior to drilling. C. Provide Geotechnical Services Provider with an engineering staff member to assist in boring layout. D. Provide Geotechnical Services Provider with final location diagrams with GPS coordinates. E. Provide ground elevations for each boring location for the Geotechnical Services Provider’s use in boring log development. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Scope of Services_6-29-22.docx Page 3 of 6 F. Set a “Pre-Construction Conference” with the Geotechnical Services Provider prior to starting work. The Environmental Services Consultant shall also be present at this meeting, as well, to discuss any issues and to coordinate the drilling schedule. Communication protocol will be established at this meeting. 3. The Geotechnical Services Provider will perform the following tasks: A. All items necessary to perform the tasks detailed in this Scope of Services. B. Subsurface Exploration and Reporting 1. Mark the borings in the field and coordinate with Digger’s Hotline. Re-marking of soil boring locations due to weather will be the responsibility of the Geotechnical Services Provider. 2. Set a meeting for boring layout per street with Environmental Services Consultant, all Digger’s Hotline locators, and City’s Project Manager. The City’s Utility Locator will NOT mark utilities down the entire street, due to the length of time this will take. The Geotechnical Services Provider shall provide a mark point and the City’s Utility Locator will locate within a designated radius (approximately 25’) around the specific boring locations. 3. Coordinate with the City’s Project Manager and Environmental Services Consultant Project Manager on drilling schedule and provide three (3) day notice of the onsite boring- layout meeting. 4. The Geotechnical Services Provider will provide e-mails daily to the City’s Project Manager and Environmental Services Consultant Project Manager, identifying which borings they intend to complete each day. 5. All streets are to remain open to traffic. The Geotechnical Services Provider will be responsible for furnishing all necessary barricades, flashers, flag persons, etc. to provide adequate traffic control and still maintain the accesses as described herein. The signs shall conform to Sections 637 and 643 of the State of Wisconsin Standard Specifications for Highway and Structure Construction. 6. If a particular boring cannot be accessed during drilling operations, the Geotechnical Services Provider shall work with the City to determine a revised location. 7. Follow standard geotechnical practices for subsurface sampling, borehole abandonment, and laboratory testing. 8. Perform standard geotechnical sampling with 1.5’ split-spoon samples, spaced 1’ (vertically) apart, starting at an even point below the pavement (i.e. 1’). Representative soil samples are to be obtained in the borings using split barrel techniques. Soil samples are then to be sealed immediately in the field and returned to the laboratory for further examination and testing. The Environmental Services Consultant shall be provided split- spoon samples of all soil boring samples. 9. If refusal is reached prior to the indicated drilling depth, contact the City immediately and locate an additional boring in the same vicinity. If this boring also has refusal at a depth similar to the initial boring, a collaborative decision will be made to determine whether or not rock coring is necessary. Boring lengths are selected based on the depths of the proposed utilities; therefore, accurate identification of material type to the indicated depth is necessary. Due to the depths of the proposed utilities and material type in Oshkosh, the Geotechnical Services Provider is required to anticipate hard drilling throughout. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Scope of Services_6-29-22.docx Page 4 of 6 10. Soil parameters for pavement design are not being requested at this time. Any laboratory testing is at the discretion of the Geotechnical Services Provider in order to provide services as detailed herein. At a minimum, moisture contents and unconfined compressive strengths should be noted on the soil boring diagrams. 11. Pavement shall be restored in-kind. It is the Geotechnical Services Provider’s responsibility to know current pavement type. 12. Groundwater elevations shall be estimated for every borehole. C. Field Coordination and Environmental 1. The Environmental Services Consultant will prepare and provide a “quick reference guide” for use by the Geotechnical Services Provider to provide additional information as to what types of environmental impacts may be encountered. Should the Geotechnical Services Provider encounter something they suspect is impacted, they shall notify the City’s Project Manager and the Environmental Services Consultant Project Manager immediately. 2. Representative soil samples are to be obtained in the borings using split barrel techniques. Soil samples are then to be sealed immediately in the field. Split samples are to remain cool until PID readings are taken by the Environmental Services Consultant. 3. Split samples shall be provided to the Environmental Services Consultant during drilling operations. D. Reporting Requirements 1. Project Overview. 2. Field Procedures. 3. Laboratory Procedures. 4. Exploration Results (broken down by street). 5. Considerations and Recommendations a. Recommendations for deep sanitary sewer construction are requested (i.e. slope stability and dewatering). b. Other information as appropriate. 6. General Qualifications. 7. Individual Soil Boring Logs. 8. Soil Boring Location Diagram. 9. Summary Table (separate table for each street) a. Boring Identification. b. Boring Depth (proposed and actual). c. Pavement Thickness. d. Base Coarse Thickness. e. Fill Thickness. f. Depth of Bedrock or Refusal, if present. 4. Project Deliverables A. Schedule of Project Deliverables 1. Coolidge Avenue report due Friday, November 18, 2022. 2. West Lincoln Avenue report due Thursday, September 8, 2022. 3. McKinley Street report due Thursday, September 8, 2022. 4. Arthur Avenue report due Friday, November 18, 2022. 5. Tyler Avenue report due Friday, November 18, 2022. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Scope of Services_6-29-22.docx Page 5 of 6 6. Bauman Street report due Friday, November 18, 2022. 7. Lake Butte Des Morts Drive report due Friday, August 26, 2022 OR SOONER. 8. Oak Street report due Friday, November 18, 2022. 9. Beech Street report due Friday, November 18, 2022. 10. Hollister Avenue report due Friday, November 18, 2022. 11. Clarks Court report due Friday, November 18, 2022. 12. Lakeshore Park Trail report due Friday, December 2, 2022. 13. Parking Lot Improvements report (to include both Parking Lot Improvements Projects listed above) due Friday, December 2, 2022. B. A separate report shall be prepared for each Project listed above. C. Drilling can be completed during the week at the Geotechnical Services Provider’s convenience, as long as the reports are submitted no later than their respective due dates. 5. Proposal Cost Breakdown A. Boring Layout 1. Cost to include coordination with Digger’s Hotline, Utility Locators, and the City’s Project Manager. 2. Cost to include laying out and marking the borings in the field. B. Mobilization/Daily Travel/Traffic Control for drilling (lump sum) 1. Additional payment for mobilization/daily travel/traffic control will not be considered if the total footage of drilling, including the contingency amount, is not exceeded. C. Soil Borings (per foot) 1. Cost to include proper borehole abandonment and street patching. 2. Cost to include providing cooled split samples to Environmental Services Consultant twice daily. 3. Unit cost will also be used for additional drilling, if needed. The Miscellaneous Additional Project(s) will be handled on a contingency basis, and are not guaranteed. 4. A contingency amount is added to the proposal cost breakdown sheets attached. 5. Anticipate hard drilling throughout the depths of the borings in this cost. A hard drilling surcharge, once the agreement has been awarded, will not be approved. D. Project Engineering and Reporting (lump sum) 1. Additional payment for project engineering and reporting will not be considered if the total footage of drilling, including the contingency amount, is not exceeded. E. Steam cleaning costs will be handled on a contingency basis. If drilling in areas of known contamination, steam cleaning is likely to be required. Steam cleaning shall be completed at the City of Oshkosh Wastewater Treatment Plant in the sweeper dump upon prior authorization by the City’s Project Manager. Do not cross contaminate samples. F. Rock coring will be handled on a contingency basis. Quantities are not guaranteed. Be prepared to rock core on a daily basis. G. Blind drilling will be handled on a contingency basis. Quantities are not guaranteed. One (1) possible example where blind drilling might be used is if a boring hits refusal prior to the indicated depth. Another boring would then be located a few feet away and blind drilled to the initial refusal depth. H. Environmental-only drilling will be handled on a contingency basis. Quantities are not guaranteed. Geotechnical information (e.g., blow counts, geotechnical laboratory analysis, etc.) will not be required for these soil borings. The Environmental Services Consultant must DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Scope of Services_6-29-22.docx Page 6 of 6 be present during these borings to gather soil information, screen soils at regular intervals, and collect samples for environmental laboratory analysis, as needed. I. Provide general rate sheets for items not covered in this Scope of Services. J. Miscellaneous Additional Projects work will be completed on a task order basis. The level of effort and associated unit rate costs will be negotiated per task order request. 6. Additional Information A. All work shall be performed by qualified personnel under the supervision of a Registered Professional Engineer in the State of Wisconsin. Reports shall bear the certificate and seal of said Professional Engineer. ASTM or other recognized standard test methods and soil classifications used in preparation of the reports shall be identified. The Geotechnical Services Provider shall take all necessary precautions to prevent damage to all adjacent property. The site is to be restored upon completion of drilling to its existing condition, including backfilling of borings and patching of slabs and pavements. The City is not responsible for the cost of repair or replacement of any drilling equipment utilized on this project due to difficult or adverse subsurface conditions. B. The entire soil profile is required from the surface to the indicated depth. C. Additional geotechnical recommendations may be required for the structural design of storm water junction chambers. Payment for these extra services will be negotiated at a later date, if necessary. D. The number of borings and depths are subject to change. Additional street borings or pond projects may be added to this agreement, or borings/work may be deleted at any time. E. It is the Geotechnical Services Provider’s responsibility to locate a dump site. The City will not provide a location to dump the material for non-impacted soil borings. Impacted soil borings will be containerized in drums and relocated to a dump site selected by the City’s Project Manager. F. This agreement will be per the City’s Agreement form only; unless the Geotechnical Services Provider has a previously-approved services agreement on file with the City. A sample agreement form is attached. The Geotechnical Services Provider’s standard or general services agreement language will NOT apply. G. Invoices for each Project shall only be submitted for payment after submittal of its report to the City. DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 1 of 9 PROPOSAL COST BREAKDOWN FOR SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES 2023 CAPITAL IMPROVEMENT PROJECTS COOLIDGE AVENUE (BAUMAN STREET TO THE FOX RIVER) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 40 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: COOLIDGE AVENUE $ WEST LINCOLN AVENUE (ELMWOOD AVENUE TO JACKSON STREET) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 175 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: WEST LINCOLN AVENUE $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 2 of 9 MCKINLEY STREET (WEST LINCOLN AVENUE TO SCOTT STREET) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 60 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: MCKINLEY STREET $ ARTHUR AVENUE (NORTH SAWYER STREET TO BAUMAN STREET) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 120 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: ARTHUR AVENUE $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 3 of 9 TYLER AVENUE (NORTH SAWYER STREET TO BAUMAN STREET) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 150 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: TYLER AVENUE $ BAUMAN STREET (TYLER AVENUE TO VAN BUREN AVENUE) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 50 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: BAUMAN STREET $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 4 of 9 LAKE BUTTE DES MORTS DRIVE (RYF ROAD TO WESTWIND ROAD) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 275 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: LAKE BUTTE DES MORTS DRIVE $ OAK STREET (EAST IRVING AVENUE TO SIEWERT TRAIL) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 90 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: OAK STREET $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 5 of 9 BEECH STREET (CONGRESS AVENUE TO WEST MURDOCK AVENUE) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 120 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: BEECH STREET $ HOLLISTER AVENUE (ALGOMA BOULEVARD TO SHERIDAN STREET) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 75 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: HOLLISTER AVENUE $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 6 of 9 CLARKS COURT (HOLLISTER AVENUE TO THE CUL-DE-SAC ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 30 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: CLARKS COURT $ LAKESHORE PARK TRAIL ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 70 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: LAKESHORE PARK TRAIL $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 7 of 9 PARKING LOT IMPROVEMENTS (300 WEST PARKING LOT – 115 ALGOMA BOULEVARD) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 45 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: 300 WEST PARKING LOT $ PARKING LOT IMPROVEMENTS (400 WEST PARKING LOT – 17 CHURCH AVENUE) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Lump Sum 1 $ $ 2. Mobilization/Daily Travel/Traffic Control Lump Sum 1 $ $ 3. Soil Borings Feet 60 $ $ 4. Project Engineering and Reporting Lump Sum 1 $ $ SUBTOTAL: 400 WEST PARKING LOT $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 8 of 9 MISCELLANEOUS ADDITIONAL PROJECT(S) ITEM DESCRIPTION UNIT EST. QTY. BID UNIT PRICE PRICE BID TOTAL 1. Boring Layout Per Bore 15 $ $ 2. Mobilization/Daily Travel/Traffic Control Per Bore 10 $ $ 3. Soil Borings Feet 250 $ $ 4. Project Engineering and Reporting Per Bore 10 $ $ SUBTOTAL: MISCELLANEOUS PROJECT(S) $ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\2023 Sub Inv\RFP\Proposal Cost Breakdown_6-24-22.docx Page 9 of 9 MISCELLANEOUS/UNDISTRIBUTED ITEMS STEAM CLEANING OF DRILLING EQUIPMENT (UNIT COST $__________) X 7 TIMES = $_____________________________ ROCK CORING (UNIT COST $__________) X 100 FEET = $_____________________________ SOIL BORINGS (UNIT COST $__________) X 100 FEET = $_____________________________ BLIND DRILLING (UNIT COST $__________) X 100 FEET = $_____________________________ ENVIRONMENTAL-ONLY DRILLING (UNIT COST $__________) X 100 FEET = $_____________________________ DRUMS FOR IMPACTED SOIL, INCLUDING RELOCATION TO CITY PROPERTY (UNIT COST $__________) X 5 DRUMS =$______________________________ TOTAL PROPOSAL COST $_______________________________ DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >>BAUMAN ST BAUMAN ST COOLIDGE AVCOOLIDGE AV 23-C-123-C-2 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsCoolidge Ave Ü06030Feet Legend >Coolidge Ave Soil Borings (20 ft Deep) Coolidge Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >>W LINCOLN AVW LINCOLN AV WRIGHT ST WRIGHT ST JACKSON ST JACKSON ST 23-L-123-L-2 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsWest Lincoln Avenue Ü08040Feet Legend >W Lincoln Ave Soil Borings (25 ft Deep) W Lincoln Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >>>W LINCOLN AVW LINCOLN AVCHERRY ST CHERRY ST WISCONSIN ST WISCONSIN ST 23-L-3 23-L-423-L-5 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsWest Lincoln Avenue Ü08040Feet Legend >W Lincoln Ave Soil Borings (25 ft Deep) W Lincoln Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >> > W LINCOLN AVW LINCOLN AV CHERRY ST CHERRY ST MC KINLEY ST MC KINLEY ST E L M W O O D A V E L M W O O D A V 23-L-6 23-L-7 23-L-8 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsWest Lincoln Avenue Ü08040Feet Legend >W Lincoln Ave Soil Borings (25 ft Deep) W Lincoln Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA > > > > SCOTT AVSCOTT AV MC KINLEY ST MC KINLEY STJOHN AVJOHN AV 23-M-1 23-M-2 23-M-3 23-M-4 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsMcKinley Street Ü08040Feet Legend >McKinley Street Soil Borings (15 ft Deep) McKinley Street Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >>> BBAAUU MM AA NN SS TT ARTHUR AVARTHUR AV JJOO SSSS LLYYNN SSTT 23-A-1 23-A-223-A-3 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsArthur Avenue Ü07035Feet Legend >Arthur Ave Soil Borings (20 ft Deep) Arthur Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >>> BBUUCCHHAANNAANN AAVV ARTHUR AVARTHUR AV 23-A-423-A-523-A-6 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsArthur Avenue Ü07035Feet Legend >Arthur Ave Soil Borings (20 ft Deep) Arthur Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >>>TYLER AVTYLER AV VAN BUREN AVVAN BUREN AV COOLIDGE AVCOOLIDGE AV BB AA UU MM AA N N SS TT 23-T-123-T-223-T-3 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsTyler Avenue Ü09045Feet Legend >Tyler Ave Soil Borings (25 ft Deep) Tyler Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA >>> VAN BUREN AVVAN BUREN AV TYLER AVTYLER AV COOLIDGE AVCOOLIDGE AV JOSSLYN ST JOSSLYN ST N SAWYER ST N SAWYER ST 23-T-423-T-523-T-6 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsTyler Avenue Ü09045Feet Legend >Tyler Ave Soil Borings (25 ft Deep) Tyler Ave Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA > > BB AA UU MM AA N N SS TT VAN BUREN AVVAN BUREN AV TYLER AVTYLER AV 23-B-1 23-B-2 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsBauman Street Ü06030Feet Legend >Bauman Street Soil Borings (25 ft Deep) Bauman Street Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA > S T E A R N S D R S T E A R N S D R WW SSNNEELLLL RRDD S T E A R N S D R S T E A R N S D R ·_45 23-BDM-1 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsButte Des Morts Dr. Ü03015Feet Legend >Butte Des Morts Dr Borings (25 ft deep) Butte Des Morts Dr Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA > OOMMNNII DDRR SSTTEEAARRNNSSDDRR ·_45 23-BDM-2 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsButte Des Morts Dr. Ü03015Feet Legend >Butte Des Morts Dr Borings (25 ft deep) Butte Des Morts Dr Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA > > > LL AA KK EE BB UU TT TT EE DD EE SS MM OO RR TT SS DD RR ·_45 ·_45 23-BDM-3 23-BDM-4 23-BDM-5 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsButte Des Morts Dr. Ü07537.5 Feet Legend >Butte Des Morts Dr Borings (25 ft deep) Butte Des Morts Dr Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA > > > S T E A R N S D R S T E A R N S D R LL AA KK EE BB UU TT TT EE DD EE SS MM OO RR TT SS DD RR ·_45 ·_45 23-BDM-6 23-BDM-7 23-BDM-8 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsButte Des Morts Dr. Ü07537.5 Feet Legend >Butte Des Morts Dr Borings (25 ft deep) Butte Des Morts Dr Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA > > > S T E A R N S D R S T E A R N S D R LL AA KK EE BB UU TT TT EE DD EE SS MM OO RR TT SS DD RR ·_45 ·_45 23-BDM-9 23-BDM-10 23-BDM-11 City of OshkoshEngineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 2023 ProposedSoil BoringsButte Des Morts Dr. Ü07537.5 Feet Legend >Butte Des Morts Dr Borings (25 ft deep) Butte Des Morts Dr Project Area Created by Eric Shew DocuSign Envelope ID: 0A4FCB36-3AE6-455D-AA70-88FE3ADCD9AA