Loading...
HomeMy WebLinkAboutRFP_(Part_1) 2023 CIP San & Storm televising I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Cover Letters\Speedy Clean Cover Ltr_7-5-22.docx Page 1 of 2 City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us July 5, 2022 Mr. Bill Peotter Speedy Clean Drain & Sewer 1380 Earl Street Menasha, WI 54952 E-Mail: info@speedycleaninc.com RE: Request for Proposal for Sanitary and Storm Sewer Main and Lateral Televising for 2023 Capital Improvement Projects Dear Bill, The City of Oshkosh is hereby requesting proposals be submitted for sanitary and storm sewer main and lateral televising of its 2023 Capital Improvement Projects. The proposal shall include at a minimum: related project experience and a breakdown of costs as requested in the enclosed Scope of Services. The proposals will be reviewed for completeness and how well it is demonstrated the needs of the City of Oshkosh can be met. The award of this work will not be based solely on the cost of the proposal. Questions regarding this Request for Proposal shall be e-mailed to me at mblank@ci.oshkosh.wi.us (with the subject heading of “2023 Sanitary and Storm Sewer Main and Lateral Televising RFP Questions”) by 12:00 noon on Thursday, July 14, 2022. The questions and appropriate responses will be distributed to all parties receiving this Request for Proposal by noon on Friday, July 15, 2022. Please submit one (1) hard copy and one (1) pdf copy of the proposal to Tracy Taylor no later than noon on Tuesday, July 19, 2022. It is anticipated the award of this agreement will be made by Tuesday, July 26, 2022. Please ensure you have the proper insurance paperwork, so the award is not delayed. Enclosed with this letter are copies of the Scope of Services, Proposal Cost Breakdown, Site Maps, Sample Standard Engineering Services Agreement, Sample Project Authorization Form, and City of Oshkosh Insurance Requirements. The information contained within these attachments shall become a part of the Agreement with the Consultant selected to perform these services. DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Cover Letters\Speedy Clean Cover Ltr_7-5-22.docx Page 2 of 2 If you have any questions, please do not hesitate to contact us. Sincerely, Mike Blank Construction Management Supervisor MB/tlt Enclosures cc: James Rabe, P.E., CPESC, Director of Public Works Steven M. Gohde, P.E., Assistant Director of Public Works / Utilities General Manager Justin Gierach, P.E, Engineering Division Manager / City Engineer DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 1 of 13 PROPOSAL COST BREAKDOWN FOR SANITARY AND STORM SEWER MAIN AND LATERAL TELEVISING 2023 CAPITAL IMPROVEMENT PROJECTS WEST LINCOLN AVENUE ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 23 $ $ 2. Sanitary Sewer Main Line Televising L.F. 5,400 $ $ 3. Sanitary Sewer Lateral Launch Each 95 $ $ 4. Sanitary Sewer Lateral Televising L.F. 3,800 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 10 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 400 $ $ 7. Storm Sewer Manhole Set-up Each 22 $ $ 8. Storm Sewer Main Line Televising L.F. 3,700 $ $ 9. Storm Sewer Lateral Launch Each 30 $ $ 10. Storm Sewer Lateral Televising L.F. 1,200 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 2,000 $ $ SUBTOTAL: WEST LINCOLN AVENUE $____________________________ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 2 of 13 MCKINLEY STREET ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 10 $ $ 2. Sanitary Sewer Main Line Televising L.F. 1,350 $ $ 3. Sanitary Sewer Lateral Launch Each 40 $ $ 4. Sanitary Sewer Lateral Televising L.F. 1,200 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 5 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 150 $ $ 7. Storm Sewer Manhole Set-up Each 10 $ $ 8. Storm Sewer Main Line Televising L.F. 1,300 $ $ 9. Storm Sewer Lateral Launch Each 12 $ $ 10. Storm Sewer Lateral Televising L.F. 360 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 650 $ $ SUBTOTAL: MCKINLEY STREET $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 3 of 13 ARTHUR AVENUE ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 8 $ $ 2. Sanitary Sewer Main Line Televising L.F. 2,000 $ $ 3. Sanitary Sewer Lateral Launch Each 50 $ $ 4. Sanitary Sewer Lateral Televising L.F. 2,300 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 8 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 360 $ $ 7. Storm Sewer Manhole Set-up Each 7 $ $ 8. Storm Sewer Main Line Televising L.F. 1,050 $ $ 9. Storm Sewer Lateral Launch Each 15 $ $ 10 Storm Sewer Lateral Televising L.F. 675 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 800 $ $ 12. Outfall Bagging 21” RCP Each 1 $ $ SUBTOTAL: ARTHUR AVENUE $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 4 of 13 TYLER AVENUE ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 17 $ $ 2. Sanitary Sewer Main Line Televising L.F. 3,100 $ $ 3. Sanitary Sewer Lateral Launch Each 50 $ $ 4. Sanitary Sewer Lateral Televising L.F. 1,500 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 10 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 300 $ $ 7. Storm Sewer Manhole Set-up Each 8 $ $ 8. Storm Sewer Main Line Televising L.F. 2,150 $ $ 9. Storm Sewer Lateral Launch Each 15 $ $ 10. Storm Sewer Lateral Televising L.F. 600 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 1,200 $ $ 12. Outfall Bagging 15” CMP Each 1 $ $ 13. Outfall Bagging 18” CMP Each 1 $ $ SUBTOTAL: TYLER AVENUE $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 5 of 13 BAUMAN STREET ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 14 $ $ 2. Sanitary Sewer Main Line Televising L.F. 2,800 $ $ 3. Sanitary Sewer Lateral Launch Each 40 $ $ 4. Sanitary Sewer Lateral Televising L.F. 2,000 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 6 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 240 $ $ 7. Storm Sewer Manhole Set-up Each 7 $ $ 8. Storm Sewer Main Line Televising L.F. 1,300 $ $ 9. Storm Sewer Lateral Launch Each 12 $ $ 10. Storm Sewer Lateral Televising L.F. 600 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 700 $ $ 12. Outfall Bagging 18” CMP Each 1 $ $ SUBTOTAL: BAUMAN STREET $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 6 of 13 OAK STREET ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 18 $ $ 2. Sanitary Sewer Main Line Televising L.F. 3,700 $ $ 3. Sanitary Sewer Lateral Launch Each 60 $ $ 4. Sanitary Sewer Lateral Televising L.F. 1,800 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 6 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 180 $ $ 7. Storm Sewer Manhole Set-up Each 19 $ $ 8. Storm Sewer Main Line Televising L.F. 3,150 $ $ 9. Storm Sewer Lateral Launch Each 55 $ $ 10. Storm Sewer Lateral Televising L.F. 1,650 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 450 $ $ SUBTOTAL: OAK STREET $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 7 of 13 BEECH STREET ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 11 $ $ 2. Sanitary Sewer Main Line Televising L.F. 2,300 $ $ 3. Sanitary Sewer Lateral Launch Each 70 $ $ 4. Sanitary Sewer Lateral Televising L.F. 2,800 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 7 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 280 $ $ 7. Storm Sewer Manhole Set-up Each 16 $ $ 8. Storm Sewer Main Line Televising L.F. 1,950 $ $ 9. Storm Sewer Lateral Launch Each 22 $ $ 10. Storm Sewer Lateral Televising L.F. 880 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 600 $ $ SUBTOTAL: BEECH STREET $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 8 of 13 HOLLISTER AVENUE ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 12 $ $ 2. Sanitary Sewer Main Line Televising L.F. 2,100 $ $ 3. Sanitary Sewer Lateral Launch Each 55 $ $ 4. Sanitary Sewer Lateral Televising L.F. 2,500 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 6 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 270 $ $ 7. Storm Sewer Manhole Set-up Each 10 $ $ 8. Storm Sewer Main Line Televising L.F. 1,700 $ $ 9. Storm Sewer Lateral Launch Each 18 $ $ 10. Storm Sewer Lateral Televising L.F. 720 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 500 $ $ SUBTOTAL: HOLLISTER AVENUE $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 9 of 13 CLARKS COURT ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 4 $ $ 2. Sanitary Sewer Main Line Televising L.F. 500 $ $ 3. Sanitary Sewer Lateral Launch Each 14 $ $ 4. Sanitary Sewer Lateral Televising L.F. 630 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 4 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 180 $ $ 7. Storm Sewer Manhole Set-up Each 5 $ $ 8. Storm Sewer Main Line Televising L.F. 500 $ $ 9. Storm Sewer Lateral Launch Each 4 $ $ 10. Storm Sewer Lateral Televising L.F. 180 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 100 $ $ SUBTOTAL: CLARKS COURT $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 10 of 13 NORTH SAWYER STREET ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 7 $ $ 2. Sanitary Sewer Main Line Televising L.F. 1,400 $ $ 3. Sanitary Sewer Lateral Launch Each 40 $ $ 4. Sanitary Sewer Lateral Televising L.F. 2,450 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 6 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 300 $ $ 11. Heavy Cleaning Less Than 36” Diameter L.F. 250 $ $ SUBTOTAL: NORTH SAWYER STREET $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 11 of 13 400 WEST PARKING LOT ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Storm Sewer Manhole Set-up Each 6 $ $ 2. Storm Sewer Main Line Televising L.F. 650 $ $ 3. Storm Sewer Lateral Launch Each 15 $ $ 4. Storm Sewer Lateral Televising L.F. 900 $0 $ 5. Heavy Cleaning Less Than 36” Diameter L.F. 300 $0 $ SUBTOTAL: 400 WEST PARKING LOT $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 12 of 13 MISCELLANEOUS PROJECTS ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL PRICE 1. Sanitary Sewer Manhole Set-up Each 10 $ $ 2. Sanitary Sewer Main Line Televising L.F. 4,000 $ $ 3. Sanitary Sewer Lateral Launch Each 40 $ $ 4. Sanitary Sewer Lateral Televising L.F. 2,000 $ $ 5. Sanitary Sewer Lateral Televising From Inside the Building Set-up Each 15 $ $ 6. Sanitary Sewer Lateral Televising from Inside the Building L.F. 750 $ $ 7. Heavy Cleaning less than 36” diameter L.F. 800 $ $ SUBTOTAL: MISCELLANEOUS PROJECTS $ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\Proposal Cost Breakdown_7-5-22.docx Page 13 of 13 TOTALS SUBTOTAL: WEST LINCOLN AVENUE $ SUBTOTAL: MCKINLEY STREET $ SUBTOTAL: ARTHUR AVENUE $ SUBTOTAL: TYLER AVENUE $ SUBTOTAL: BAUMAN STREET $ SUBTOTAL: OAK STREET $ SUBTOTAL: BEECH STREET $ SUBTOTAL: HOLLISTER AVENUE $ SUBTOTAL: CLARKS COURT $ SUBTOTAL: NORTH SAWYER STREET $ SUBTOTAL: 400 WEST PARKING LOT $ SUBTOTAL: MISCELLANEOUS PROJECTS $ TOTAL PROPOSAL COST $________________________________ DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\SOW with main line televising_7-5-22.docx Page 1 of 5 SCOPE OF SERVICES FOR SANITARY AND STORM SEWER MAIN AND LATERAL TELEVISING 2023 CAPITAL IMPROVEMENT PROJECTS 1. The scope of this agreement consists of furnishing all labor, equipment, materials, electrical power, and traffic control necessary to provide sanitary and storm sewer main and lateral televising as indicated herein. A. Approximately 46,500 feet of sanitary and storm sewer main and 829 sanitary and storm laterals are anticipated for the following 2022 Capital Improvement Program: 1. West Lincoln Avenue (Sanitary and Storm) a. West Lincoln Avenue (Elmwood Avenue to Jackson Street). 2. McKinley Street (Sanitary and Storm) a. McKinley Street (West Lincoln Avenue to Scott Avenue). 3. Arthur Avenue (Sanitary and Storm) a. Arthur Avenue (North Sawyer Street to Bauman Street). 4. Tyler Avenue (Sanitary and Storm) a. Tyler Avenue (North Sawyer Street to Bauman Street). 5. Bauman Street (Sanitary and Storm) a. Bauman Street (Coolidge Avenue to Pierce Avenue). 6. Oak Street (Sanitary and Storm) a. Oak Street (East Irving Avenue to Siewert Trail) 7. Beech Street (Sanitary and Storm) a. Beech Street (Congress Avenue to West Murdock Avenue) 8. Hollister Avenue (Sanitary and Storm) a. Hollister Avenue (Algoma Boulevard to Sheridan Street) 9. Clarks Court (Sanitary and Storm) a. Clarks Court (Hollister Avenue to the cul-de-sac) 10. North Sawyer Street (Sanitary) a. North Sawyer Street (Buchanan Avenue to Coolidge Avenue) 11. Parking Lot Improvements (Storm) a. 400 West Parking Lot – 17 Church Avenue 12. Miscellaneous Projects a. Miscellaneous other locations to be possibly added at a later date. 13. Including at least one (1) parcel on all cross streets and ends, which may include more than one (1) main line segment. All laterals in a segment shall be televised. B. Heavy cleaning where approved by the Engineer. C. Bagging and dewatering of the selected storm sewer outfalls. 2. The City of Oshkosh (City) will perform the following tasks: A. Provide an engineering staff member to assist in locating all manholes. 1. Engineering Staff will be available Monday through Friday (except recognized City Holidays) from 8:00 a.m. to 4:30 p.m. B. Pre-clean sanitary sewer mains. 1. The City will clean the first time. If a second cleaning is required, the Consultant shall be on site to ensure enough cleaning has been completed for the necessary videoing operations (Consultant would assist with videoing while cleaning is being done). DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\SOW with main line televising_7-5-22.docx Page 2 of 5 a. If it is determined by the Engineer that “Heavy Cleaning” is needed, the City will pay for Heavy Cleaning under that Item. C. Provide initial notification to property owners of televising work that will be taking place. 3. Television Inspection A. The Consultant shall furnish all labor, equipment, and materials necessary to perform closed circuit television inspection of sanitary and storm sewer main line and laterals within designated main line sections. B. Laterals shall be televised as far as possible. If the lateral camera cannot go further than ten feet (10’) beyond the road right-of-way (usually back of sidewalk), then the Consultant shall make arrangements with the property owner to televise the remaining portion of the lateral from inside the building. C. The Consultant shall have access to equipment necessary to perform televising in mains less than thirty six inches (36”) in size for the sanitary and thirty eight inches by sixty inches (38” x 60”) in size for the storm sewer. D. The view seen by the television camera shall be transmitted to a monitor located inside a mobile TV studio, which has the capabilities to produce a DVD copy. The Consultant’s mobile studio shall be large enough to accommodate up to three (3) people for the purpose of viewing the monitor while the inspection is in progress. The City shall have access to view the television screen at all times. E. Televising shall be in compliance with NASSCO’s PACP. F. Technicians shall be PACP-certified by NASSCO. Consultant shall submit verification of certification prior to commencing work. G. Provide five (5) working days’ notice to the City prior to commencing work. H. Provide three (3) working days’ notice to the City if sanitary and storm sewer mains cannot be accessed and need to be cleaned. 4. Display A. The “Work Order” shall consist of the following information and shall be displayed at the beginning and end of the segment. The Work Order shall be displayed for a minimum of fifteen (15) seconds or as long as it takes to say the information at the beginning. This Work Order shall be displayed once again at the end of the segment for a minimum of five (5) seconds. The computerized voice shall not be used for the beginning and ending Work Order information. Work Order Display – Laterals Address: Manhole ID that main line camera is in: Distance from manhole: Sewer Lateral Type: “Sanitary Lateral”. Weather: Date: Name of Technician: Work Order Display – Main Line Tag-ID#: (both manholes ID #’s _date). DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\SOW with main line televising_7-5-22.docx Page 3 of 5 City: Street Block: Upstream MH: ID #. Downstream MH: ID #. Camera Direction: Sewer Use: Weather: Date: Name of Technician: Comments: The counter and date shall be displayed for the entire length of the segment. The Consultant shall display all incidents for a minimum of five (5) seconds. The computerized voice also may not be used for incidents. 5. Folder and File Naming A. Files should be organized per street with the Folder titled as follows: “Street Name” (i.e. West 24th Avenue). B. Within the street name folder, there shall be a manhole segment folder containing the mainline inspection report and each lateral report within a particular segment. C. Each lateral shall be an individual folder within the manhole segment folder and shall be titled as follows: “Building Address – lateral distance at the main from manhole MH manhole#” (i.e. 564 W 24th Ave – 251ftMH0821). D. Each lateral folder shall contain both the lateral report and video footage of the particular Building Address. E. Alternates to this filing system shall be approved by Engineer. 6. Project Deliverables A. Schedule of Project Deliverables 1. West Lincoln Avenue due Thursday, September 8, 2022. 2. McKinley Street due Thursday, September 8, 2022. 3. Arthur Avenue due Friday, November 18, 2022. 4. Tyler Avenue due Friday, November 18, 2022. 5. Bauman Street due Friday, November 18, 2022. 6. Oak Street due Friday, November 18, 2022. 7. Beech Street due Friday, November 18, 2022. 8. Hollister Avenue due Friday, November 18, 2022. 9. Clarks Court due Friday, November 18, 2022. 10. North Sawyer Street due Friday, November 18, 2022. 11. 400 West Parking Lot: Friday, December 2, 2022. B. Main Line Inspection Report 1. The report shall include information consistent with NASSCO PACP. C. Lateral Inspection Report DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\SOW with main line televising_7-5-22.docx Page 4 of 5 1. The lateral report shall include the distance from manhole at the main; material type; any transitions or restrictions in the pipe with their respective locations; repairs that have been done to the pipe; locations of dips, cracks, roots, or any other defects; and locations of any taps/connections. The report shall also include any other pertinent information found during televising and information consistent with NASSCO PACP. D. Video 1. The video recording shall be in a format viewable via Windows Media Player. 2. See Paragraph 4 for video display requirements. E. The Consultant shall deliver one (1) external hard drive copy by the dates indicated above. The external hard drive will become the property of the City. The cost of furnishing, producing, programming, copying, and any other miscellaneous costs shall be included in the proposed price for televising. F. The Consultant shall also deliver one (1) bound copy of the reports organized per City area and street. G. Provide lateral locations at the City’s right-of-way (typically back of sidewalk). This is to be done with a device capable of tracing the location of the camera head. The lateral location is then to be marked where it crosses the right-of-way with a pink paint mark on the sidewalk and with a six-inch (6”) survey stake pounded flush with the existing ground. A lath shall then be placed behind the stake with the corresponding address written on it. The lath shall also be painted “pink” along with the stake top. Once a block is completed and located, contact the City so GPS shots can be taken. 7. Traffic Control A. All streets are to remain open to traffic. The Consultant will be responsible to furnish all necessary barricades, flares or flashers, flag persons, etc. to provide adequate traffic control and still maintain the accesses as described herein. The signs shall conform to Sections 637 and 643 of the State of Wisconsin Standard Specifications for Highway and Structure Construction. 8. Proposal Cost Breakdown A. Sanitary Sewer Manhole Set-up (each) 1. Set-up cost to include any time and expenses required in order to gain entry into the sanitary sewer manhole and travel through the sewer main. 2. Should the Consultant televise multiple segments in a row from one (1) manhole, only one (1) set-up will be considered. Estimated quantities are one (1) set-up per segment. 3. This cost to also include mobilization, daily travel, and traffic control. B. Sanitary Sewer Main Line Televising 1. Includes all costs associated with providing sanitary sewer main line television inspection as described above. C. Sanitary Sewer Lateral Launch (each) 1. Cost to include effort to launch lateral camera from main line camera into the sanitary sewer lateral. 2. Only one (1) launch per lateral done from the main will be paid. D. Sanitary Sewer Lateral Televising (linear foot) 1. Cost to include televising of the sanitary sewer lateral from the main as described above. 2. Cost to provide deliverables as described above. E. Sanitary Sewer Lateral Televising from Inside the Building Set-up (each) DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C I:\Engineering\I & I Work\Sanitary Laterals\Televising\2023\RFP\SOW with main line televising_7-5-22.docx Page 5 of 5 1. Set-up cost to include any time and expense required in order to gain entry into the sanitary sewer lateral from inside the building. 2. Only one (1) set-up per sanitary sewer lateral will be considered. Estimated quantities are calculated as twenty-five percent (25%) of the anticipated Lateral Launches. 3. Cost to include coordination with property owners and set-up. F. Sanitary Sewer Lateral Televising from Inside the Building (linear foot) 1. Includes all costs necessary to televise the lateral from inside the building with same requirements, including deliverables, as described above. 2. Cost to include coordination with property owners, footage, and deliverables. 3. Estimated quantities are calculated as twenty-five (25%) of the estimated Lateral Footage quantity. G. Storm Sewer Manhole Set-up (each) 1. Set-up cost to include any time and expenses required in order to gain entry into the storm sewer manhole and travel through the sewer main. 2. Should the Consultant televise multiple segments in a row from one (1) manhole, only one (1) set-up will be considered. Estimated quantities are one (1) set-up per segment. 3. This cost to also include mobilization, daily travel, and traffic control. H. Storm Sewer Main Line Televising 1. Includes all costs associated with providing storm sewer main line television inspection as described above. I. Storm Sewer Lateral Launch (each) 1. Cost to include effort to launch lateral camera from main line camera into the storm sewer lateral. 2. Only one (1) launch per lateral done from the main will be paid. J. Storm Sewer Lateral Televising (linear foot) 1. Cost to include televising of the storm sewer lateral from the main as described above. 2. Cost to provide deliverables as described above. K. Heavy Cleaning Less Than Thirty-Six Inches (36”) Diameter (linear foot) 1. Cost to include the mobilization of the necessary equipment, setup, cleaning sanitary or storm sewers, and restoration of the site. L. Heavy Cleaning Greater Than or Equal to Thirty-Six Inches (36”) Diameter (linear foot) 1. Cost to include the mobilization of the necessary equipment, setup, cleaning sanitary or storm sewers, and restoration of the site. M. Outfall Bagging and Dewatering (each) 1. Cost to include the mobilization of the necessary equipment, setup, dewatering, and restoration of the site. 9. Additional Information A. This agreement will be per the City’s Agreement form only. A sample agreement form is attached to this Request for Proposal. B. All quantities in the cost breakdown are estimated and are not guaranteed. C. The proposals will be reviewed for completeness and how well it is demonstrated the needs of the City can be met. The award of this work will not be based solely on cost of the proposal. DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C March 12, 2022City of OshkoshEngineering Division Created by: Eric Shew Sewer TelevisingW Lincoln AveElmwood Ave to Jackson St Legend #S Sanitary manholes Sanitary sewer %U Storm manholes Storm sewer %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U %U (X (X (X (X (X (X (X (X (X (X 8 0 2 8 0 8 8 0 0 8 0 1 7 5 0 723727 8 1 6 8 2 0 833831 827 712720 830 826 822 814 810 708 700716 827 823 821 817 813 826 822 820 814 810 628 750 740 720 623623A623B 826A 811 827A 819A 814A 830A 05-537 05-536 05-535 05-534 05-533 05-532 05-531 05-52905-528 05-504 05-503 05-502 05-501 05-500 05-499 05-30605-324 05-321 05-320 05-304 05-303 05-302 05-301 05-488 05-47805-477 05-475 05-130 05-131 05-115 05-11905-11805-117 E L M W O O D A V E L M W O O D A V CHERRY ST CHERRY ST WW LLIINNCCOOLLNN AAVV MC KINLEY ST MC KINLEY ST 0 70 14035Feet NOTICE AND DISCLAIMER City of Oshkosh maps and GIS data are intended to be used for reference purposes only. The maps and GIS Data are not intended to be used to independently verify information identified. While the City attempts to maintain complete and accurate maps, these maps and data are primarily compilations of information provided by various sources. Therefore, anyone viewing these maps is expected to verify the information they are interested in through other sources such as Diggers Hotline, other public maps, official and unofficial land records, field surveys and inspections, and other records held by property owners and/or property users. Persons using City maps and/or data do so at their own risk. Property owners are solely responsible for underground facilities and all other features related to their property. The City of Oshkosh shall not be responsible for any problems or damages resulting from the use of City maps and/or data. Persons believing that City maps and/or contain inaccuracies or incomplete information are requested to bring these issues to the City’s attention. . DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C March 12, 2022City of OshkoshEngineering Division Created by: Eric Shew Sewer TelevisingW Lincoln AveElmwood Ave to Jackson St Legend #S Sanitary manholes Sanitary sewer %U Storm manholes Storm sewer %U %U %U %U %U %U %U %U %U %U %U %U (X (X (X (X (X (X (X (X (X (X 514520 814 820 723727 515 712720 814A 820A 838 830 826 822 814 810 708 700716 835 827 823 821 817 813 832 826 822 820 814 810 628 620 612614 608A608 600602 817 526 751 753 750 740 720 745 741 735 731 527 523 519 744 740 732 623 825 835 734 830#1 623A623B 605607 826A 811 838A 827A 817A 814A 830#2 830#3 830#4 830#5 830#6 830#7 830#8 615A615B615C615D 725 #1 725 #2 725 #3 725 #4 728 #1 728 #2 728 #3 728 #4 621 525 746 746A 830A 05-420 05-421 05-306 05-304 05-303 05-302 05-301 05-286 05-287 05-343 05-288 05-342 05-135 05-133 05-132 05-12205-120 05-128 05-127 05-130 05-121 05-119 WISCONSIN ST WISCONSIN ST CHERRY ST CHERRY ST W LINCOLN AVW LINCOLN AV 0 70 14035Feet NOTICE AND DISCLAIMER City of Oshkosh maps and GIS data are intended to be used for reference purposes only. The maps and GIS Data are not intended to be used to independently verify information identified. While the City attempts to maintain complete and accurate maps, these maps and data are primarily compilations of information provided by various sources. Therefore, anyone viewing these maps is expected to verify the information they are interested in through other sources such as Diggers Hotline, other public maps, official and unofficial land records, field surveys and inspections, and other records held by property owners and/or property users. Persons using City maps and/or data do so at their own risk. Property owners are solely responsible for underground facilities and all other features related to their property. The City of Oshkosh shall not be responsible for any problems or damages resulting from the use of City maps and/or data. Persons believing that City maps and/or contain inaccuracies or incomplete information are requested to bring these issues to the City’s attention. . DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C March 12, 2022City of OshkoshEngineering Division Created by: Eric Shew Sewer TelevisingW Lincoln AveElmwood Ave to Jackson St Legend #S Sanitary manholes Sanitary sewer %U Storm manholes Storm sewer %U%U %U%U %U %U %U %U %U %U %U %U %U %U %U %U %U%U %U %U%U %U%U%U%U %U %U %U %U %U (X (X (X (X (X (X (X (X (X (X (X (X (X (X (X (X (X 811 805 410420 815 823 500510514520 817 821 829 814 820 515 511 824 820 829 814 810 802 752 746 742 734 730 724 814A 820A 526 511A527523519 503 744 740 732 735A 752A 737 733 727 728 734 738 740 750 417 751 747 739 735 731 814 820 826 828 734 830#1 511B 821A 824A 829A 805A 726 734A 817A 830#2 830#3 830#4 830#5 830#6 830#7 830#8 506 728 #1 728 #2 728 #3 728 #4 525 746 746A 810A 05-420 05-421 10-542 05-103 05-42805-429 05-43010-684 10-102 10-100 10-101 05-10010-10305-102 10-68305-427 05-290 05-286 05-287 05-343 05-338 05-292 05-170 05-342 05-341 05-291 10-492 05-413 05-41105-412 05-410 05-126 05-125 05-136 05-135 05-132 05-122 05-128 05-123 05-12405-121 JACKSON ST JACKSON ST WISCONSIN ST WISCONSIN ST WRIGHT ST WRIGHT ST W LINCOLN AVW LINCOLN AV 0 60 12030Feet NOTICE AND DISCLAIMER City of Oshkosh maps and GIS data are intended to be used for reference purposes only. The maps and GIS Data are not intended to be used to independently verify information identified. While the City attempts to maintain complete and accurate maps, these maps and data are primarily compilations of information provided by various sources. Therefore, anyone viewing these maps is expected to verify the information they are interested in through other sources such as Diggers Hotline, other public maps, official and unofficial land records, field surveys and inspections, and other records held by property owners and/or property users. Persons using City maps and/or data do so at their own risk. Property owners are solely responsible for underground facilities and all other features related to their property. The City of Oshkosh shall not be responsible for any problems or damages resulting from the use of City maps and/or data. Persons believing that City maps and/or contain inaccuracies or incomplete information are requested to bring these issues to the City’s attention. . DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C March 12, 2022City of OshkoshEngineering Division Created by: Eric Shew Sewer TelevisingW Lincoln AveW Lincoln Ave-Wisconsin Intersection Legend #S Sanitary manholes Sanitary sewer %U Storm manholes Storm sewer%U (X (X (X 6 0 0602 5 2 6 751 753 52 7 5 2 3605525 74 6 74 6 A 05-287 05-122 05-120 05-121 WISCONSIN ST WISCONSIN ST W LINCOLN AVW LINCOLN AV 0 10 205Feet NOTICE AND DISCLAIMER City of Oshkosh maps and GIS data are intended to be used for reference purposes only. The maps and GIS Data are not intended to be used to independently verify information identified. While the City attempts to maintain complete and accurate maps, these maps and data are primarily compilations of information provided by various sources. Therefore, anyone viewing these maps is expected to verify the information they are interested in through other sources such as Diggers Hotline, other public maps, official and unofficial land records, field surveys and inspections, and other records held by property owners and/or property users. Persons using City maps and/or data do so at their own risk. Property owners are solely responsible for underground facilities and all other features related to their property. The City of Oshkosh shall not be responsible for any problems or damages resulting from the use of City maps and/or data. Persons believing that City maps and/or contain inaccuracies or incomplete information are requested to bring these issues to the City’s attention. . DocuSign Envelope ID: AC6161A4-5F30-4A62-9335-EC8DF8200E0C