HomeMy WebLinkAbout22-20_CO__1_(FINAL)TO: WOOD SEWER & EXCAVATING CHANGE ORDER #1 (FINAL) E9238 COUNTY RD X NEW LONDON, WI 54961 Your present contract with the City of Oshkosh, Contract No. 22-20, awarded March 22, 2022, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($55,668.60) NET DECREASE TO CONTRACT ($55,668.60) SECTION I TOTALS BID TOTAL $445,364.40 $445,364.40 CO #1 ($55,668.60)($55,668.60) CONTRACT TOTAL $389,695.80 $389,695.80 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: DECEMBER 14, 2022 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ DocuSign Envelope ID: CB1B8D56-BB3F-4A1E-A403-7D1D519DC221 CONTRACT 22-20 CHANGE ORDER #1 (FINAL) 22-20 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1100 Removing pavement; complete as specified Square Yards 123.00 78.48 -44.52 $8.00 ($356.16) 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 2,845.00 2,339.88 -505.12 $1.00 ($505.12) 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 1,209.00 1,075.29 -133.71 $98.00 ($13,103.58) 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 140.00 140.00 $102.00 1336 3" asphalt pavement over 6" concrete pavement removal and replacement; including full-depth saw cutting; pavement ties; dowel bars' integral curb and gutter; turf restoration; tack coat; fine grading; and traffic control; complete as specified Square Yards 57.00 50.10 -6.90 $128.00 ($883.20) 1370 Turf restoration; complete as specified Square Yards 452.51 502.23 49.72 $10.00 $497.20 1448 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 31.00 47.00 16.00 $45.00 $720.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 1,700.00 1,600.00 -100.00 $8.00 ($800.00) 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,159.00 740.00 -419.00 $8.50 ($3,561.50) 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 940.00 765.00 -175.00 $3.00 ($525.00) Page 2 of 4 DocuSign Envelope ID: CB1B8D56-BB3F-4A1E-A403-7D1D519DC221 CONTRACT 22-20 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 112.00 144.00 32.00 $9.00 $288.00 1700 Sawing existing pavement; complete as specified Linear Feet 136.00 152.00 16.00 $2.50 $40.00 1906 4" asphaltic pavement LT with 10" CABC and grading; complete as specified Square Yards 120.00 65.84 -54.16 $61.00 ($3,303.76) 1916 4" asphaltic pavement LT with 6" CABC and grading; complete as specified Square Yards 13.00 0.00 -13.00 $60.00 ($780.00) 2001 Furnish and install 8" storm sewer; complete as specified Linear Feet 81.00 63.00 -18.00 $88.00 ($1,584.00) 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 1,075.00 801.60 -273.40 $92.00 ($25,152.80) 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 8.20 7.95 -0.25 $510.00 ($127.50) 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 5.00 5.00 $2,100.00 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 1,002.00 947.80 -54.20 $102.90 ($5,577.18) 2404 Furnish and install storm sewer marker balls; complete as specified Each 74.00 71.00 -3.00 $38.00 ($114.00) 2406 Furnish and install storm sewer clay dams; complete as specified Each 37.00 35.00 -2.00 $90.00 ($180.00) 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 10.00 10.00 $650.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 115.00 112.00 -3.00 $80.00 ($240.00) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 56.00 54.00 -2.00 $10.00 ($20.00) 2850 Connect to existing storm sewer main; complete as specified Each 23.00 22.00 -1.00 $400.00 ($400.00) Page 3 of 4 DocuSign Envelope ID: CB1B8D56-BB3F-4A1E-A403-7D1D519DC221 CONTRACT 22-20 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2856 Connect to existing storm sewer manhole; complete as specified Each 2.00 2.00 $660.00 2858 Connect to existing storm sewer inlet; complete as specified Each 5.00 5.00 $620.00 SECTION I (BID ITEMS 1100 - 2858) - SUBTOTAL: $1,545.20 ($57,213.80) NET DECREASE TO SECTION I: ($55,668.60) ($55,668.60)NET DECREASE TO CONTRACT: Page 4 of 4 DocuSign Envelope ID: CB1B8D56-BB3F-4A1E-A403-7D1D519DC221