HomeMy WebLinkAbout01-405.docORIGINAL RESOLUTION PRESENTED TO COUNCIL - SEE 01-405 & 01-405E FOR ACTIONS
OCTOBER 9, 2001
01-405 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE:
GRANT CONDITIONAL USE PERMITS; APPROVE FINAL
PLANNED DEVELOPMENTS:
(A) NE CORNER RUSH AVENUE & DOVE STREET
(B) W. 28TH AVENUE
(C) PEARL AVENUE, SOUTH OF ROCKWELL AVENUE
(D) 1990 MENARD DRIVE
(E) 902 TAFT AVENUE
INITIATED BY:
(A) EFRAIN LOPEZ, OWNER;
(B) CITY OF OSHKOSH, OWNER;
(C) WISCONSIN PUBLIC SERVICE;
(D) BRIAN FISCHER, PETITIONER;
(E) HARBOR WAY CONDOS
PLAN COMMISSION RECOMMENDATION: All approved
BE IT RESOLVED by the Common Council of the City of Oshkosh that
conditional use permits are hereby granted for the following properties under Section
30-11 of the Oshkosh Zoning Ordinance, and that said permits are granted with
conditions, if any, as noted for each respective property, and the Planned District
Overlay and final development plans, per the attached exhibits, are hereby approved.
A) NE Corner Rush Avenue and Dove Street
A conditional use permit to construct a parking lot and dumpster enclosure on properties
known as 1212 & 1220 Rush Avenue, per the attached "Exhibit A", with the following
conditions:
2)
3)
A landscape plan be submitted to, and approved by, the Department of
Community Development prior to issuance of a building permit. Said landscape
plan shall provide and increase the level of landscaping treatments to mitigate
the proposed development's impact on the surrounding residential uses.
Brick materials be used in the construction of the west, north and south walls of
the dumpster enclosure, with the balance of the dumpster screened per Zoning
Ordinance requirements.
Use of the parking lot property and associated improvements be deed restricted
and filed with the Register of Deeds for use by the property at 519 N. Sawyer
Street only. Said deed restriction shall be approved by the City Attorney's office
prior to filing.
OCTOBER 9, 2001
01-405 RESOLUTION
CONT'D
B) W. 28th Avenue
A conditional use permit for construction of an 11'6" x 15'6" structure to house a backup
generator for the City's lift station, per the attached "Exhibit B", with the following
conditions:
1) A landscape plan, which provides a sufficient level of landscape treatment to de-
emphasize the appearance of the east elevation of the structure, be submitted to, and
approved by, the Department of Community Development.
2) The 28th Avenue side of the building be landscaped.
3) The proposed building be constructed to the east of the existing structure on this
site.
C) Pearl Avenue, south of Rockwell Avenue
A conditional use permit for construction of a 16' x 24' structure for mechanical
equipment for a district gas regulation station, per the attached "Exhibit C", with the
condition that a landscape plan that provides a sufficient level of landscape treatment to
replace the trees to be removed and properly landscape the structure, be submitted to,
and approved by, the Department of Community Development.
D) 1990 Menard Drive
A conditional use permit for a planned commercial development to construct a 957 sq.
ft. drive thru espresso cafe, per the attached "Exhibit D", with the following conditions:
1) A landscape plan, with an enhanced level of landscaping provided along the
north property line where the proposed development will encroach closer to the north
property line, be submitted to, and approved by, the Department of Community
Development prior to issuance of a building permit.
2) The dumpster area be solidly screened per the requirements of the Zoning
Ordinance with a minimum 6 ft. high fence.
3) Cross access and cross parking agreements be provided and filed with the
Register of Deeds office.
E) 902 Taft Avenue
A conditional use permit for a planned residential development for construction of 36
living units in 22 structures, and associated amenities, to be constructed in phases, per
the attached "Exhibit E", with the following conditions:
OCTOBER 9, 2001
01-405 RESOLUTION
CONT'D
E) 902 Taft Avenue (cont'd)
1) Floodplain issues be resolved by construction phase prior to issuance of building
permits.
2) The developer/owner coordinate relocation of public utilities on site and provide
for the entire cost to relay public utilities and provide new easements to plans and
specifications approved by the Department of Public Works, prior to issuance of building
permits in Phases II and III.
3) Proposed units 23 and 24 be reconfigured to meet all setback and transitional
yard requirements.
4) A landscape plan, with an enhanced level of treatments where transitional yard
setback reductions have been granted, be submitted to, and approved by, the
Department of Community Development prior to issuance of building permits.
5) Transitional yard reductions be granted for the access drives in Phase I, along
the south property line, and those drives that serve units 8, 9, 25 and 26 as requested.
6) Modification to allow reductions in the minimum separation between structures is
approved.
7) Modification to allow more than a one single or a two family structure on the
same lot is approved.