HomeMy WebLinkAbout22-11 CO #1 (Final)_8-22-23TO: WOOD SEWER & EXCAVATING
E9238 COUNTY ROAD X
NEW LONDON, WI 54961
Your present contract with the City of Oshkosh, Contract No. 22-11, awarded July 26, 2022, is hereby
amended and changed as follows:
($51,396.11)
$6,527.00
($44,869.11)
$533,527.50 $533,527.50
($44,869.11)($44,869.11)
$488,658.39 $488,658.39
CITY OF OSHKOSH
BY:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
BID TOTAL
CO #1
CONTRACT TOTAL
CHANGE ORDER #1 FINAL
DATE: AUGUST 22, 2023
NET DECREASE TO SECTION I:
NET INCREASE TO ADDITIONAL WORK:
NET DECREASE TO CONTRACT
______________________________
Comptroller
______________________________
Contractor
______________________________
Approved and accepted:
______________________________
City Manager
City Clerk
______________________________
DocuSign Envelope ID: 7320847E-2306-49A9-BCD0-D49F348154ED
CONTRACT 22-11 CO #1 (FINAL)
22-11
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1050
Mobilization; complete as
specified
Lump
Sum 1.00 1.00 $24,500.00
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified
Square
Feet 750.00 681.30 -68.70 $1.75 ($120.23)
1308
7" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and fine
grading; turf restoration; and
traffic control; complete as
specified
Square
Yards 800.00 493.70 -306.30 $88.00 ($26,954.40)
1309
7" concrete pavement HES
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and fine
grading; turf restoration; and
traffic control; complete as
specified
Square
Yards 50.00 103.10 53.10 $108.00 $5,734.80
1318
8" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and fine
grading; turf restoration; and
traffic control; complete as
specified
Square
Yards 50.00 0.00 -50.00 $99.00 ($4,950.00)
1319
8" concrete pavement HES
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and fine
grading; turf restoration; and
traffic control; complete as
specified
Square
Yards 450.00 402.30 -47.70 $115.00 ($5,485.50)
1370
Turf restoration; complete as
specified
Square
Yards 100.00 108.20 8.20 $18.00 $147.60
1373
Replace and set CITY-
supplied manhole castings
and frames; complete as
specified Each 88.00 92.00 4.00 $410.00 $1,640.00
1374
Furnish and install concrete
adjustment rings; complete as
specified
Vertical
Feet 45.00 33.22 -11.78 $360.00 ($4,240.80)
1375
Furnish and install rubber
adjustment rings; complete as
specified
Vertical
Feet 5.00 4.02 -0.98 $890.00 ($872.20)
Page 2 of 6
DocuSign Envelope ID: 7320847E-2306-49A9-BCD0-D49F348154ED
CONTRACT 22-11 CO #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1376
Tuck point manholes;
complete as specified Each 15.00 16.00 1.00 $189.00 $189.00
1380
Cold weather covering
(concrete pavement) - single
visquine; complete as
specified
Square
Yards 150.00 123.60 -26.40 $1.00 ($26.40)
1382
Cold weather covering
(concrete pavement) - double
visquine; complete as
specified
Square
Yards 50.00 42.90 -7.10 $2.00 ($14.20)
1390
Up-charge for late season
cold weather concrete
pavement; complete as
specified
Cubic
Yards 200.00 53.40 -146.60 $12.00 ($1,759.20)
1500
4" concrete sidewalk with 3"
CABC and grading; complete
as specified
Square
Feet 250.00 186.30 -63.70 $12.50 ($796.25)
1510
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
specified
Square
Feet 500.00 495.00 -5.00 $13.50 ($67.50)
1540
Curb ramp detectable
warning field (natural/non-
painted); complete as
specified
Square
Feet 16.00 16.00 $50.00
1550
No. 4 reinforcing rods -
deformed; epoxy-coated;
complete as specified
Linear
Feet 30.00 0.00 -30.00 $5.00 ($150.00)
1560
Drilled No. 4 sidewalk tie bars
- deformed; epoxy-coated;
complete as specified Each 10.00 36.00 26.00 $15.00 $390.00
1904
Remove and replace HMA
pavement; including sawing;
fine grading; turf restoration;
and traffic control; complete
as specified
Square
Yards 275.00 288.10 13.10 $80.00 $1,048.00
1918
Asphaltic cold weather
paving; complete as specified
Square
Yards 100.00 126.70 26.70 $10.00 $267.00
1930
Temporary cold mix asphaltic
patch; complete as specified
Square
Yards 200.00 42.60 -157.40 $0.01 ($1.57)
3000
Furnish and install 8" sanitary
sewer (relay); complete as
specified
Linear
Feet 25.00 33.00 8.00 $90.00 $720.00
3002
Furnish and install 10"
sanitary sewer (relay);
complete as specified
Linear
Feet 10.00 5.00 -5.00 $135.00 ($675.00)
Page 3 of 6
DocuSign Envelope ID: 7320847E-2306-49A9-BCD0-D49F348154ED
CONTRACT 22-11 CO #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3008
Furnish and install 18"
sanitary sewer (relay);
complete as specified
Linear
Feet 10.00 4.00 -6.00 $188.00 ($1,128.00)
3010
Furnish and install 21"
sanitary sewer (relay);
complete as specified
Linear
Feet 25.00 11.00 -14.00 $212.00 ($2,968.00)
3012
Furnish and install 24"
sanitary sewer (relay);
complete as specified
Linear
Feet 10.00 5.00 -5.00 $252.00 ($1,260.00)
3100
Furnish and install standard
sanitary sewer manhole (4'
diameter); complete as
specified
Vertical
Feet 6.00 5.83 -0.17 $1,050.00 ($178.50)
3101
Furnish and install standard
sanitary sewer manhole (4'
diameter) with slurry backfill;
complete as specified
Vertical
Feet 18.00 18.40 0.40 $1,500.00 $600.00
3103
Furnish and install standard
sanitary sewer manhole (5'
diameter) with slurry backfill;
complete as specified
Vertical
Feet 1.00 0.00 -1.00 $1,900.00 ($1,900.00)
3105
Furnish and install standard
sanitary sewer manhole (6'
diameter) with slurry backfill;
complete as specified
Vertical
Feet 8.50 8.00 -0.50 $2,600.00 ($1,300.00)
3114
Furnish and install external
sanitary sewer manhole
chimney seal; complete as
specified Each 85.00 83.00 -2.00 $780.00 ($1,560.00)
3116
Furnish and install external
sanitary sewer manhole
chimney seal extension;
complete as specified Each 13.00 6.00 -7.00 $420.00 ($2,940.00)
3118
Furnish and install internal
sanitary sewer manhole
chimney seal; complete as
specified Each 5.00 2.00 -3.00 $510.00 ($1,530.00)
3120
Furnish and install internal
sanitary sewer manhole
chimney seal extension;
complete as specified Each 1.00 1.00 $460.00
3123
Reconstruct sanitary sewer
manhole (4' diameter) with
slurry backfill; complete as
specified
Vertical
Feet 105.00 103.62 -1.38 $900.00 ($1,242.00)
3160
Pour and reshape manhole
bench; complete as specified Each 6.00 7.00 1.00 $1,113.00 $1,113.00
Page 4 of 6
DocuSign Envelope ID: 7320847E-2306-49A9-BCD0-D49F348154ED
CONTRACT 22-11 CO #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3210
Furnish and install 8" x 6"
sanitary sewer factory wyes
or tees; complete as specified Each 1.00 1.00 $500.00
3222
Furnish and install 6" sanitary
sewer "Insert-A-Tee" or "Kor-
N-Tee"; complete as specified Each 1.00 1.00 $600.00
3234
Furnish and install 4"/6"
sanitary sewer lateral (relay);
complete as specified
Linear
Feet 20.00 10.00 -10.00 $75.00 ($750.00)
3235
Furnish and install 4"/6"
sanitary sewer riser (relay);
complete as specified
Linear
Feet 5.00 0.00 -5.00 $93.00 ($465.00)
3236
Furnish and install sanitary
sewer lateral marker balls;
complete as specified Each 3.00 2.00 -1.00 $55.00 ($55.00)
3300
Furnish and install connection
to existing 8" sanitary sewer
mains; complete as specified Each 2.00 4.00 2.00 $1,000.00 $2,000.00
3302
Furnish and install connection
to existing 10" sanitary sewer
mains; complete as specified Each 1.00 1.00 $1,120.00
3308
Furnish and install connection
to existing 18" sanitary sewer
mains; complete as specified Each 1.00 1.00 $1,190.00
3310
Furnish and install connection
to existing 21" sanitary sewer
mains; complete as specified Each 3.00 3.00 $1,320.00
3312
Furnish and install connection
to existing 24" sanitary sewer
mains; complete as specified Each 1.00 1.00 $1,650.00
3892
Excavation special (sanitary);
complete as specified Tons 10.00 0.00 -10.00 $50.00 ($500.00)
3974
Furnish sanitary sewer
manhole grouting setup;
complete as specified Each 7.00 7.00 $1,600.00
3975
Furnish and install sanitary
sewer manhole grouting;
complete as specified Gallons 50.00 155.26 105.26 $10.50 $1,105.24
3976
Furnish sanitary sewer
manhole cementitious liner
setup; complete as specified Each 2.00 1.00 -1.00 $1,600.00 ($1,600.00)
Page 5 of 6
DocuSign Envelope ID: 7320847E-2306-49A9-BCD0-D49F348154ED
CONTRACT 22-11 CO #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3977
Furnish and install sanitary
sewer structural cementitious
liner-PERMACAST by AP/M
PERMAFORM; complete as
specified
Vertical
Feet 10.00 5.90 -4.10 $210.00 ($861.00)
SECTION I - (BID ITEMS 1050-3977) - SUBTOTAL $14,954.64 ($66,350.75)
($51,396.11)
ADDITIONAL WORK REQUIRED: CO #1
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-30000
W. Waukau spot repair (8'
sanitary sewer); complete as
specified
Lump
Sum 0.00 1.00 1.00 $6,527.00 $6,527.00
ADDITIONAL WORK REQUIRED: CO #1 (BID ITEM 1-30000) SUBTOTAL:$6,527.00 $0.00
$6,527.00
NET DECREASE TO SECTION I ($51,396.11)
NET INCREASE TO ADDITIONAL WORK CO #1: $6,527.00
NET DECREASE TO CONTRACT:($44,869.11)
NET INCREASE:
NET DECREASE TO SECTION I:
Page 6 of 6