HomeMy WebLinkAbout0103600-Building (shed) CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner DONALD JNERNA SCHUMACHER
Designer Contractor OWNER
Category 151 - New Utility Buildings-Sheds (Residential) Plan
Type · Building (~ Sign (~ Canopy C) Fence (~) Raze
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete C) Floating Slab C) Pier C) Other
C) concrete Block (~ Post C) Treated Wood
Occupancy Permit Flood Plain __ Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
OSHKOSH
ON THE WATER
Job Address 1507 FAIRLAWN ST
No 103600
Create Date 08/19/2003
Size
[] Projection
Canopies 0
Signs 0
Use/Nature ~FR/ Placing an 6' x l 0' shed in the side yard of a comer lot. The shed shall be setback 25' from the sidewalk and 7.5'from theside
of Work )roperfy line.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$1,250.00 Plan Approval
$0.00 Permit Fee Paid
[] Perrnit Voided J
Plumbing Contractor
$25.00 Park Dedication $0.00
Date 08/19/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit app[ication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secg,'~hany necessary approvals b(}fpre s,~rting such activity.
Address 1507 FAIRLAWN ST ~/ OSHKOSH WI 54902 - 6346 Telephone Number
To schedule inspections please call the Inspection Request Ii,e at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready,
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION:
PROPERTY OWNEPJCONTRACTOR:
ZONING...
CONSTRUCTION DATA: New Construction
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
COMPLIANCE CHECKLIST
Addition
Alteration
~ Iz~-~
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with p.C. or
BZA Conditions of Approval
· Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is conforming~d when no change is proposed.
. [/ APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY:
DATE: