Loading...
HomeMy WebLinkAbout0103585-Building (roof/deck/patio/steps)OSHKOSH ON THE WATER .lob Address 1229 CEAPE AVE Designer Category Type Zoning CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS G PUTZER JR Contractor OWNER No 103585 Create Date 08/19/2003 141 - Exterior Remodeling Plan · Building (~ Sign (~ Canopy (~ Fence O Raze Class of Const: Size Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~ Floating Slab (~) Concrete Block (~ Post Occupancy Permit Park Dedication Rooms 0 Height 0 Ft. [] Projection Bedrooms 0 Stories Canopies Baths 0 Signs O Pier (~) Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Use/Nature of Work ~FPJ Replace shingles, deck, patio and replace rear stairs. Deck and patio with trellis (already constructed) shall be separated by 5'-0" or zoning compliance. HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ $5,950.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided Plumbing Contractor $45.00 Park Dedication $0.00 Date 08/19/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement Signatureh°lder(s)and tos~~ap~v~als~re~rtingsuch activity.~ r~--~::~(.. , ~ ¥* Date v AgenFOwner Address 1229 CEAPE AVE OSHKOSH WI 54901 -5423 TelephoneNumbef~.~O~)?'Z/o-~"'~/ To schedule inspections please call the Inspection Request line at 236-5126 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: [7_7 '~ C~o.I PROPERTY OWNEPJCONTRACTOR: CONSTRUCTION DATA: TYPE OF CONSTRUCTION: New ConstnJcfion (i.e. fence, pool, parking lot, sign, etc.) ZONING, Addition Alteration COMPLIANCE CHECKLIST DEFICIENT COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard . Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is confon~ing and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. L~APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: