HomeMy WebLinkAbout0103585-Building (roof/deck/patio/steps)OSHKOSH
ON THE WATER
.lob Address 1229 CEAPE AVE
Designer
Category
Type
Zoning
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS G PUTZER JR
Contractor OWNER
No 103585
Create Date 08/19/2003
141 - Exterior Remodeling Plan
· Building (~ Sign (~ Canopy (~ Fence O Raze
Class of Const: Size
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete (~ Floating Slab
(~) Concrete Block (~ Post
Occupancy Permit
Park Dedication
Rooms 0 Height 0 Ft. [] Projection
Bedrooms 0 Stories Canopies
Baths 0 Signs
O Pier (~) Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Use/Nature
of Work
~FPJ Replace shingles, deck, patio and replace rear stairs. Deck and patio with trellis (already constructed) shall be separated by 5'-0"
or zoning compliance.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$5,950.00 Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided
Plumbing Contractor
$45.00 Park Dedication $0.00
Date 08/19/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
Signatureh°lder(s)and tos~~ap~v~als~re~rtingsuch activity.~ r~--~::~(.. , ~ ¥* Date
v AgenFOwner
Address 1229 CEAPE AVE OSHKOSH WI 54901 -5423 TelephoneNumbef~.~O~)?'Z/o-~"'~/
To schedule inspections please call the Inspection Request line at 236-5126 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: [7_7 '~ C~o.I
PROPERTY OWNEPJCONTRACTOR:
CONSTRUCTION DATA:
TYPE OF CONSTRUCTION:
New ConstnJcfion
(i.e. fence, pool, parking lot, sign, etc.)
ZONING,
Addition Alteration
COMPLIANCE CHECKLIST
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
. Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is
confon~ing and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is conforming and when no change is proposed.
L~APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: