Loading...
HomeMy WebLinkAboutContract 23-17 East Parkway Ave watershed detention basinCity o� Oshkosh Addendum No. 2 City Contract 23-17 EAST PARKWAY AVENUE WATERSHED DETENTION BASIN - CONSTRUCTION TO ALL CONTRACTORS: You are directed to make the following changes to City Contract 23-17: REPLACE the 23-17 Plan Set with the Revised 23-17 Plan Set, which is attached to this Addendum. If you have any questions regarding this Addendum, please contact me at (920) 236-5065 between the hours of 8:00 a,m. and 4:00 p.m. weekdays or Jeremy Thomas of AECOM at (847) 702-6639 or by email at ieremy.thomas@aecom.com. Sincerely, 4*'L 9kor Alyssa Deckert, P.E. Civil Engineering Supervisor AD/tlt 1:\ Engineering \2021 - 2030 Contracts\2023 CONTRACIS\23-17 B Parkway Det Page 1 of 1 Basin\ Project —information \Contract Info\Addendum\Addendum #2\23-17 Addendum k2 8-8-23.docx City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.cf.oshkosh.W.us CITY CONTRACT 23-17 EAST PARKWAY AVENUE WATERSHED DETENTION 100% i X DE��I�R,R�AWINGS 'ADDENDUM 1)� CITY OF OSH-K-SH WINNEBAGO COUNTY, WI 2023 INOE%OF DR WNOS PAGE NO. EST NO. SN � WpIpN SM G. l O wS:E NG.IEGT WFOPx4TON UNVEY LOOFINNIS C-i SpN CONiNO�P1A pNO—E0 GPAdNG PIpN iGMDWG OETPftS DVq OE - NG u srowl sEnEN PUN a pNorTiE.v 9 IS 54 T NMl NOTUMIOETPR u 0 W NO W �U Q= W Z O UJ U N�Z= a UQQO Im Y �YZc=3 Zw00- Oai•=u._ V F- O L A L O r '=aWF-z U W 0 U