Loading...
HomeMy WebLinkAbout0103577-Building (soffit/fascia/windows)OSHKOSH ON THE WATER Job Address 944 EVANS ST Designer Category 141 - Exterior Remodeling CITY OF OSHKOSH No 103577 BUILDING PERMIT - APPLICATION AND RECORD Owner ANTHONYJ WAY/PAULAM KIESLING Create Date 08/18/2003 Contractor VANGUARD CONTRACTING Plan Type · Building O Sign O Canopy ~) Fence O Raze Zoning Claes of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete O Floating Slab ~) Pier ~) Other ~) Concrete Block ~) Post (~) Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Size [] ProjectionI Canopies Signs 0 0 Use/Nature SFPJ Replacing soffit, fascia, wrapping post and replacing screen panels with windows. Any windows within 2' of the door shall be of Work tempered glass. No structural work. HVAC Contractor Electric Contractor Plumbing Contractor Fees: Valuation Issued By: ~ $4,000.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided [ $35.00 Park Dedication $0.00 Date 08/18/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starling such activity. Signature )L.~ ~...~ Date ~'~///~/~;~ Agent/Owner Address 522 STANLEYAVE Oshkosh WI 54901 - 0000 Telephone Number 379-2573 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.