Loading...
HomeMy WebLinkAbout0103576-Building (porch columns) OSHKOSH ON THE WATER Job Address 531 HAZEL ST Designer Category 141 - Exterior Remodeling Type · Building (~ Sign Zoning Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. FL Garage 0 Sq. Ft. · Poured Concrete O Floating Slab (~ Concrete Brock (~ Post Foundation Occupancy Permit Park Dedication CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner RANDY/RACHEL A GLAZER Contractor VANGUARD CONTRACTING Canopy (~ Fence O Raze Use/Nature of Work Class of Const: Rooms 0 Height Bedrooms 0 Stories Baths 0 (~ Pier (~ Other ~ Treated Wood Flood Plain # Dwelling Units 0 ~FR/ Replace 4 columns for the front porch and additional siding from permit #102194. 0 Ft. NO 103576 Create Date 08/18/2003 Plan Size [] Projection J Canopies Signs Height Permit # Structures 0 HVAC Contractor Electric Contractor Plumbing Contractor Fees: Valuation $3.000.00 Plan Approval Issued By: / [] Permit Voidedr $0.00 Permit Fee Paid $30.00 Park Dedication $0,00 Date 08/18/2003 Fthal/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~ ~-..~,.._~. -- =~'-~ .,¢~_.~,,F..~,,' Date ~ ~'~/ ~=¢:~)0 ~'~ Agent/Owner Address 522 STANLEY AVE Oshkosh WI 54901 - 0000 . Telephone Number 379-2573 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.