Loading...
HomeMy WebLinkAbout0103567-Building (shed)OSHKOSH ON THE WATER .Job Address 1119 WAUGOO AVE Designer Category 151 - New Utility Buildings-Sheds (Residential) Plan Type · Building (~) Sign (~ Canopy (~) Fence (~ Raze .Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~) Floating Slab (~ Pier O Other (~ Concrete Block (~) Post (~ Treated Wood Occupancy Permit Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures 0 CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner WiLLIAM/HEATHER KAMETLER Create Date Contractor OWNER No 103567 08/18/2003 Size [] Projection J Canopies 0 Signs 0 Use/Nature of Work I~FR/ Constructing a 8' x 12' shed in the rear yard. Shed shall be anchored to the ground to resist movement. L HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ $900.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $20.00 Park Dedication $0.00 Date 08/18/2003 Final/O.P. 00/00/0000 in the performance of this work I agree to perform all work pursuant to rules governing [he described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~ ,;~."~i]~.~/ /~'~-,/"~,., Date Agent/Owner Address 1119 WAUGOO AVE OSHKOSH WI 54901 - 5464 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.