HomeMy WebLinkAbout0103623-Building (roof) CITY OF OSHKOSH No '103623
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1011 E IRVING AVE Owner RUSSELL L C KILPELA/MARGARET WIE Create Date 08/20/2003
Designer Contractor OWNER
Category 141 - Extedor Remodeling Plan
Type · Building (~ Sign (~ Canopy (~ Fence (~ Raze J
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation · Poured Concrete O Floating Slab O Pier ~) Other
(~ Concrete Block (~) Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature ;)uplex-Rental/ Reroofing house, replacing guardrail on front 2nd floor outside balcony and replacing 10-t 5 windows. (Renew Building
of Work ~ermit #95995)
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$5,500.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $45.00 Park Dedication $0.00
Date 08/20/2003 Final/O.P. 00/00/0000
[] Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in th~s permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and,~o secure arj~'r'r~cessary approvals I~ef~re, starting such activity.
Signature~ 2~ ~..z.~ Date
~ ~- J Age'n~'~'~'~'~'~'~'~ner
Address 2560 HEARTHSTONE DR OSHKOSH WI 54901 - 1598 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.