Loading...
HomeMy WebLinkAbout0103623-Building (roof) CITY OF OSHKOSH No '103623 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1011 E IRVING AVE Owner RUSSELL L C KILPELA/MARGARET WIE Create Date 08/20/2003 Designer Contractor OWNER Category 141 - Extedor Remodeling Plan Type · Building (~ Sign (~ Canopy (~ Fence (~ Raze J Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete O Floating Slab O Pier ~) Other (~ Concrete Block (~) Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ;)uplex-Rental/ Reroofing house, replacing guardrail on front 2nd floor outside balcony and replacing 10-t 5 windows. (Renew Building of Work ~ermit #95995) HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ $5,500.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $45.00 Park Dedication $0.00 Date 08/20/2003 Final/O.P. 00/00/0000 [] Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in th~s permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and,~o secure arj~'r'r~cessary approvals I~ef~re, starting such activity. Signature~ 2~ ~..z.~ Date ~ ~- J Age'n~'~'~'~'~'~'~'~ner Address 2560 HEARTHSTONE DR OSHKOSH WI 54901 - 1598 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.