HomeMy WebLinkAbout03-512DECEMBER 23, 2003 03-512 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: INITIATED BY: CHANGE ORDER NO. 4, PUBLIC WORKS CONTRACT 02-03A DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: DORNER-STAHL, INC. PO Box 129 Luxemburg, WI 54217-0129 Net Decrease to contract: ($57,088.43) PURPOSE: See attached Change Order. TO: Domer-Stahl, Inc. P. O. Box 129 Luxemburg, WI 54217-0129 CHANGE ORDER# 4 DATED: December 1, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 02-03A , is hereby amended NET DECREASE TO SECTION I - CONCRETE PAVING: ($57,088.43) Recommended: _.%,,'J c. Director of Public Works CITY OF OSHKOSH BY: City Manager City Clerk Fo'ntr3ctor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: Comptroller City Attorney CONTRACT: 02-03A CHANGE ORDER#4 SECTION ! - CONCRETE PAVING ITEM DESCRIPTION NUMBER CONTRACT QUANTITIES INSTALLED QUANTITIES NET NET INCREASE DECREASE COSTPER UNIT CONTRACT PRICE DECREASE IN CONTRACT PRICE lA. Approx. 4,700 square Fards of pavement removal, complete as specified, per square yard 4,700.00 4,960.60 260.60 $3.00 $781.80 2A. Approx. 47,550 square feet 3f sidewalk and driveway removal, complete as ~pecified, per square foot 47,550.00 50,361.55 2,811.55 $0.40 $1,124.62 3A. Approx. 20,880 cubic yards 3f excavation, complete as specified, per cubic yard 20,880.00 19,507.10 -1,372.90 $5.00 ($6,864.50 4A. Approx. 34,315 square iyards of 7" non-reinforced iconcrete pavement, !including integral curb, 5" ~ase material & grading, :omplete as specified, per ~squareyard 34,315.00 34,422.90 107.90 $20.00 $2,158.00 5A. Approx: 1,510 linear feet of i12" radius curb & head, Icomplete as specified, per ilinear foot 1,510.00 1,470.30 -39.70 $5.00 ($198.50) 6A. !Approx. 1,630 linear feet of standard 30" curb & gutter, complete as specified, per linear foot 1,630.00 1,584.60 -45.40 $8.00 ($363.20) 7A. Approx. 10 linear feet of 6" x 18" curb, complete as specified, per linear foot 10.00 11.40 1.40 $15.00 $21.00 SA. Approx. 32,075 square feet of 4" concrete sidewalk, complete as specified, per square foot 32,075.00 33,546.00 1,471.00 $2.35 $3,456.85 9A. Approx. 32,075 square feet of 6" concrete sidewalk & driveway, complete as specified, per square foot 32,075.00 30,241.60 -1,833.40 $2.80 ($5,133.52 10A. Approx. 575 square yards of 3" thick asphaltic concrete driveway, complete as specified, per square yard 575.00 546.00 -29.00 $23.80 ($690.20 Page 1 CONTRACT: 02-03A CHANGE ORDER # 4 INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 11A. Approx. 1,210 square yards of 3" asphaltic concrete transition, complete as specified, per squareyard 1,210.00 1,201.40 -8.60 $18.75 ($161.25) 12A. Approx. 475 square yards of 5" asphaltic concrete transition, complete as specified, per square yard 475.00 480.30 5.30 $24.25 $128.53 13A. Furnish and install approx. 14,500 tons of crushed stone base course, complete as specified, per ton 14,500.00 8,330.30 -6,169.70 $8.25 ($50,900.03 14A. Approx. 3,280 linear feet of sawing, complete as specified, per linear foot 3,280.00 3,245.50 -34.50 $2.05 ($70.73) 15A. Furnish and install approx. 610 pavement ties, complete as specified, each 610.00 511.00 -99.00 $6.00 ($594.00) 16A. Adjust approx. 190 manholes and inlets, complete as specified, each 190.00 185.00 -5.00 $230.00 ($1,150.00 17A. Furnish and install approx. 10 trees, complete as specified, each 10.00 10.00 $400.00 18A. Remove approx. 35 I.D. of stumps, complete as specified, per inch diameter 35.00 52.00 17.00 $20.00 $340.00 19A. Remove approx. 175 I.D. of trees and stumps, complete as specified, per inch diameter 175.00 239.30 64.30 $19.00 $1,221.70 20A. Furnish and installapprox. 660 linear feet of No. 4 reinforcing bars, complete as specified, per linear foot 660.00 360.00 -300.00 $0.65 ($195.00) 21A. Terrace work on Bay Street, complete as specified, lump sum 1.00 1.00 $4,560.00 22A. Terrace work on Cleveland Avenue, complete as specified, lump sum 1.00 1.00 $3,868.00 23A. Terrace work on Dove Street, complete as specified, lump sum 1.00 1.00 $9,085.00 Page 2 CONTRACT: 02-03A CHANGE ORDER#4 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 24A. Terrace work on Huron Avenue, complete as specified, lump sum 1.00 1.00 $7,204.00 25A. Terrace work on Josslyn Street, complete as specified, lump sum 1.00 1.00 $17,605.00 26A. Terrace work on Oak Street, complete as specified, lump sum 1.00 1.00 $2,758.00 27A. Terrace work on Tennessee Avenue, complete as specified, lump sum 1.001 1.00 $6,954.00 SECTION I - (BID ITEMS lA - 27A) - SUB-TOTALS $9,232.50 ($66,320.93) ADDITONAL WORK REQUIRED: C.C. # '1 - SECTION I - CONCRETE PAVING ITEM DESCRIP~ON CONTRACT NUMBER QUAN~ES INSTALLED NET QUAN~ES INCREASE NET DECREASE COSTPER UNIT INCREASEINIDECREASEIN CONTRACT CONTRACT PR CE PR CE 1. Additional concrete paving replacement on Taft Avenue, from Josslyn St. to Bauman St. I-A. Pavement removal, per sq. yard 986.80 986.80 $3.00 I-B. New7" non-reinforced concrete pavement including integral curb and grading (base in place), per sq. yard 986.80 988.80 $20.00 1-C. Concrete sawing,per lin. ft. 177.60 177.60 $2.05 1-D. Pavement ties 60.00 60.00 $6.00 ADDITIONAL WORK: C.C. # 1 - (ITEMS lA -1D) - SUB-TOTAL $0.00 NET DECREASE TO SECTION I - ($57,088.43 $0.00 NET DECREASE TO CONTRACT: ($57,088.43 Page 3