Loading...
HomeMy WebLinkAbout03-513DECEMBER 23, 2003 03-513 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: INITIATED BY: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT 02-03B DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: DORNER-STAHL, INC. PO Box 129 Luxemburg, WI 54217-0129 Net Decrease to contract: ($17,210.65) PURPOSE: See attached Change Order. TO: Dorner-Stahl, Inc. P. O. Box 129 Luxemburg, WI 54217 CHANGE ORDER # 1 DATED: December 1, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 02-03B , is hereby amended NET DECREASE TO SECTION I - CONCRETE PAVING: ($17,210.65) Recommended: Director of Public WOCKS BY: CITY OF OSHKOSH City Manager City Clerk ~___..~Approv/~and acc~ / C/n~ra~tor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: Comptroller City Attorney CONTRACT: 02-03B CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ITEM NUMBER DESCRIPTION CONTRACT NET NET COST PER QUANTITIES INCREASE DECREASE UNIT ~CREASE ~ CONTRACT PRICE DECREASEIN CONTRACT PRICE 1B. Approx. 1,260 square /ards of pavement removal, complete as specified, per square yard 1,260.00 984.80 -275.20 $5.00 ($1,376.00 2B. Approx. 10,225 square feet of sidewalk and driveway removal, complete as specified, per square foot 10,225.00 10,310.00 85.00 $0.45 $38.25 3B. Approx. 4,800 cubic yards of excavation, complete as specified, per cubic yard 4,800.00 4,274.40 -525.60 $5.00 ($2,628.00 4B. Approx. 8,180 square Cards of 7" non-reinforced concrete pavement, including integral curb, 5" base material & grading, complete as specified, per square yard 8,180.00 8,159.20 -20.80 $20.00 ($416.00) 5B. Approx. 445 linear feet of 12" radius curb & head, complete as specified, per linear foot 445.00 442.40 -2.60 $10.00 ($26.00) 6B. Approx. 235 linear feet of standard 30" curb & gutter, complete as specified, per linear foot 235.00 247.10 12.10 $20.00 $242.00 7B. No Bid Item aB. Approx. 2,785 square feet of 4" concrete sidewalk, complete as specified, per square foot 2,785.00 3,064.60 279.60 $2.40 $671.05 aB. Approx. 9,680 square feet of 6" concrete sidewalk & driveway, complete as specified, per square foot 9,680.00 10,154.80 474.80 $2.80 $1,329.44 10B. No Bid Item 11B. Approx. 635 square yards of 3" asphaltic concrete Lransition, complete as specified, per square yard 635.00 649.70 14.70 $19.00 $279.30 12B. Approx. 875 square yards of 5" asphaltic concrete [ransition, complete as specified, per square yard 875.00 976.90 101.90 $20.00 $2,038.00 Page 1 CONTRACT: 02-03B CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST P£R INCREASE IN DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES: INCREASE DECREASE UNIT PRICE PRICE 13B. Furnish and installapprox. 1,925 tons of crushed stone base course, complete as specified, per ton 1,925.00 0.00 -1,925.00 $8.50 ($16,362.50 14B. Approx. 640 linear feet of sawing, complete as specified, per linear foot 640.00 304.30 -335.70 $2.05 ($688.19 15B. No Bid Item 16B. Adjust approx. 53 manholes and inlets, complete as specified, each 53.00 53.00 $230.00 17B. Furnish and install approx. 4 trees, complete as specified, each 4.00 3.00 -1.00 $400.00 ($400.00) 18B.. No Bid Item 19B. Remove approx. 36 I.D. of trees and stumps, complete as specified, per inch diameter 36.0( 40.00 4.00 $22.00 $88.00 20B. No Bid Item 21B. Terrace work on Powers Street, complete as specified, lump sum 1.00 1.00 $13,000.00 SECTION I - (BID ITEMS lB - 21B) - SUB-TOTALS $4,686.04 ($21,896.69) NET DECREASE TO CONTRACT: ($17,210.65) Page 2