Loading...
HomeMy WebLinkAbout0103503 VOID103503 CITY OF OSHKOSHNo V O I D OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER CHARLES RADTKE / SUSAN FRANTA Job Address2405 NICOLE CTOwnerCreate Date08/13/2003 DesignerContractorTOM WILLIAMS BUILDING CONTRACTOR Category111 - Single Family AdditionPlan TypeBuildingSignCanopyFenceRaze ZoningClass of Const:8Size12X16 Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 0Sq. Ft.Bedrooms0Stories1Canopies0 Garage192Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitRequiredFlood PlainNoHeight PermitNot Required Park DedicationNot Required# Dwelling Units0# Structures1 sfr/ 12X16 Attached Garage Addition to existing garage. Use/Nature of Work HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$14,000.00Plan Approval$0.00Permit Fee Paid$77.00Park Dedication$0.00 08/13/200300/00/0000 Issued By:DateFinal/O.P. üüPermit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner 501 IOWA STREETOSHKOSHWI549020000233-7817 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: :~ C/~O~,. ~,~j~j,~ ~',-~ · PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: New Construction TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) ZONING Addition Alteration COMPLIANCE CHECKLIST DEFICIENT Use Lot Width Lot Area Lot Area Per Family Flood Plain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Mechanical Equip. Screening COMMENTS REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: ~.~-~'---"---~ DATE: