Loading...
HomeMy WebLinkAbout03-494DECEMBER 9, 2003 03-494 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS - FIRST ADDITION TO QUAIL RUN FARM SUBDIVSlON INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the Wisconsin Statutes, for public improvements and services, for the premises described in the attached Waiver is accepted and approved. WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES The undersigned, owner of property benefited by the following improvements to be made by the City of Oshkosh, Winnebago County, State of Wisconsin, to wit: For public construction, surveying and inspection of sidewalk and storm sewer (outside of right- of-way) concrete paving and for the design of the concrete paving and storm sewer (outside of fight-of-way). For Private construction and public surveying and inspection for sanitary sewer, storm sewer, water main, laterals, grading and graveling.. In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I hereby admit that such public improvement will benefit said property and consent to the levying of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I hereby waive all special assessment notices and hearings required by Section 66.0703 of the Wisconsin Statutes; and I further agree and admit that the benefit of my property fi.om the construction of such improvements is in proportion to the footage thereofi Description of Premises First Addition to Quail Run Farm Subdivision Lots 19-35 (17 Lots) and 30utlots Quail Run Drive Sanitary Sewer (Private Construction) Estimated Construction Cost 6% Survey and Inspection 2. Water Main (Private Construction) Estimated Construction Cost 6% Survey and Inspection Sanitary and Water Laterals (Private Construction) Estimated Construction Cost 6% Survey and Inspection $45,189 Private $ 2,711 Invoice $55,237 Private $ 3,314 Invoice $18,929 Private $ 1,136 Invoice Page 2 First Addition to Quail Run Farm Subdivision Storm Sewer Laterals (Private Construction) Estimated Construction Cost 6% Survey and Inspection $7,342 Private $ 441 Invoice 5. Storm Sewer (Pr/vate Construction) Estimated Construction Cost 6% Survey and Inspection $ 9,188 Private $ 552 Invoice 6. Storm Sewer (Public Construction - Outside of Right-of-Way) Estimated Assessable portion of Construction Cost 6% Survey and Inspection 6% Design $ 50,000 Public $ 3,000 $ 3,000 Total $56,000 Lots 19-35 ($56,000/17 lots) = $3,294/1ot ASSESS Sidewalk (Public Construction) Assessment Rate = $20.00 per front foot of each lot Includes 6% for inspection and surveying. Includes Handicap ramps Lot # Front Feet Sidewalk 19 14L95 $2,839.00 20 80.13 $1,602.60 21 130.86 $2,617.20 22 I25.03 $2,500.60 23 105.36 $2,107.20 24 101.84 $2,036.80 25 162.57 $3,251.40 26 157.25 $3,145.00 27 163.85 $3,277.60 28 161.26 $3,225.20 29 118.99 $2,379.80 30 199.77 $3,995.40 31 161.32 $3,226.40 32 171.48 $3,429.60 33 313.48 $6,269.60 34 282.29 $5,645.80 35 70.25 $1,405.00 Total 2,647.68 $52,953.60 Grading and Graveling (Private Construction) Center Line Feet ofRoad~vay = 1446 Lf. Cost per Center Line Foot = $36.00/Lf Estimated Construct/on Cost 6% Survey and Inspection $52,056.00 $ 3,123.00 9. Concrete Paving (Public Construction - Year 2006) Center Line Feet of Roadway = 1446 Lf. Cost per Center Line Foot = $125.00/lf Estimated Construction Cost 6% Survey and Inspection 6% Design $180,750.00 $ 10,845.00 $ 10,845.00 Paving Includes sidewalk construction for Outlots (1, 2 & 3) (Public Construction) Outlot 1 62.46 $1,I74.25 Outlot 2 289.96 $5,451.25 Outlot 3 30.10 $ 565.88 Subtotal 382.52 Subtotal $7,191.38 6% Survey & Inspection $ 459.00 Total $218,188.00 Lots 19-35 ($218,188.00/17 lots) = $12,834.00/'Lot ASSESS 3 - Year Letter of Credit for Private Construction = $197,941.00 3 - Year Letter of Credit for Public Services = $11,277.00 2 - Year Letter of Credit Guarantee After Acceptance of Private Construction = $37,588.00 Signature of Owner: Date