Loading...
HomeMy WebLinkAbout0103599-Building (door)OSHKOSH ON THE WATER ,Jeb Address 2391 GOLDEN AVE Designer Category 141 - Exterior Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEL V/CYNTH WIEDENHAFT Contractor STANLEY LEACH-BUILDER Type · Building (~) Sign C) canopy (~) Fence (~ Raze No 103599 Create Date 08/19/2003 Plan Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 9 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete (~ Floating Slab (~ Pier (~) Other (~ Concrete Block (~ Post O Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ~FR/Installing a 2'8" door in place of an existing window. A permit has previously been taken out for the exit. This permit does not of Work nclude the required electrical permit for providing a light off the exit. HVAC Contractor Electric Contractor Fees: Valuatio~ Issued By: $1,800.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided Plumbing Contractor $25.00 Park Dedication $0.00 Date 08/19/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an¢ to secure a0y necessary ~pprovals before starting such activity. Signature ~,,,,, ~J~ /-~ Dar ( ~. ¢ ' - ' " Agent/Owner % Address 5~,99 SHERMAN RD OSHKOSH WI 54901 - 0000 Telephone Number 235-2530 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.