HomeMy WebLinkAbout03-458.docNOVEMBER 11, 2003 03-458 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: INITIATED BY: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT NO. 02-13 DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: NORTHEAST ASPHALT, INC. W6380 Design Drive Greenville, WI 54942 Net Decrease to contract: ($28,306.45) PURPOSE: See attached Change Order. TO: Northeast Asphalt, Inc. W6380 Design Drive Greenville, WI 54942 CHANGE ORDER # I DATED: October 6, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 02-13 , is hereby amended NET DECREASE TO SECTION I - CONCRETE PAVING: NET INCREASE TO SECTION Il - STORM SEWER: NET INCREASE TO SECTION iii - SANITARY SEWER: NET DECREASE TO CONTRACT: ($28,306.45) $0,00 $o.o0 ($28,306.45) Recommended: Director of PubliC' Works BY: CITY OFOSHKOSH City Manager City Clerk AP~ ,~¢.~accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: Comptroller City Attorney CONTRACT: 02-13 CHANGE ORDER# I SECTION I -ASPHALT PAVING NUMBER CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN rTEM DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1. Approx. 700 cubic yards of excavation, complete as specified, per cubic yard 700.00 45.80 -654.20 $6.00 ($3,925.20~, 2. Approx. 3,350 square yard., ~f asphaltic pavement milling, complete as specified, per sq. yd. 3,350.00 3,160.20 -189.80 $2.00 ($379.60 3. Approx. 14,280 square ~,ards of asphaltic pavement pulverizing, .~omplete as specified, per sq. yd. 14,280.00 14,280.00 $0.50 4. ~,pprox. 3,250 tons of ~sphaltic concrete binder 'naterial, complete as specified, perton 3,250.00 2,618.60 -631.40 $26.00 ($16,416.40 5. ~,pprox. 2,420 tons of lasphaltic concrete surface imaterial, complete as specified, perton 2,420.00 2,281.60 -138.40 $28.00 ($3,875.20) 6. Approx. 2,390 tons of crushed stone base, compIete as specified, per ton 2,390.00 1,894.70 -495.30 $8.50 ($4,210.05 7. Adjust approx. 8 manholes complete as specified, each 8.00 8.00 $150.00 8. Preparation of foundation for asphalt paving on S. Washburn Street, complete as specified, tump sum 1.00 1.00 $8,700.00 9. Preparation of foundation for asphalt paving on Chestnut Street, complete as specified, lump sum 1.00 1.00 $2,500.00 SECTION I - (BiD iTEMS t - 9) - SUB-TOTALS $0.00 ($28,806.45) ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION I - ASPHALT PAVING INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE RRICE 1 Furnis'h and instalt 4" wrapped drain tile on S. Washburn Street at w. Waukau Avenue, per linear foot 25.00 25.00 $20.00 $500.00 ADDITIONAL WORK: c.o. # 1. (ITEM t) - SUB-TOTAL NET DECREASE TO SECTION t - $500.00 $0.00 ($28,306.45) Page1 CONTRACT: 02-13 CHANGE ORDER # 1 SECTION II - STORM SEWER N IoTME~MER DESCRIPTION QUANTITIEsCONTRACT INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREASE IN CONTRACT PRICE DECREASEIN CONTRACT PRICE 10. Furnish and install approx. three (3) Neenah R-1710 Storm Manhole Frames ,vith Type "B" solid lid with ~pen pick holes, non- 'ocking, complete as }ecified, each 3.00 3.00 $300.00 SECTION II - (BID ITEM 1) - SUB-TOTALS $0.00 $0.00 NET INCREASE TO SECTION II - $0.00 SECTION III - SANITARY SEWER ITEM NUMBER CONTRACT QUAN~TIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER INCREASEIN DECREASE IN CONTRACT CONTRACT PRICE PRICE 11. Furnish and install approx. two (2) Neenah R-1710 Sanitary Manhole Frames Type "B" solid lid w/self- sealing gasket and concealed pick holes, non- rocking, complete as specified, each 2.00 2.00 $300.00 SECTION III - (BID ITEM 1) · SUB-TOTALS $0.00 $0.00 NET INCREASE TO SECTION Ill - $0.00 NET INCREASE TO SECTIONS I, II, III NET DECREASE TO SECTIONS l, Il, III $500.00 ($28,806.45 NET DECREASE TO CONTRACT: ($28,306.45 Page 2