WHEREAS, the Common Council of the City of Oshkosh, Winnebago County,
Wisconsin (the "Council") intends to incur and pay, or has incurred and paid, capital
expenditures aggregating approximately, $3,500,000 (the "Capital Expenditures") for the
property, project or program described on Exhibit A, which is hereby incorporated herein
by this reference and made a part hereof to the same extent as if set out in full herein
(said property, project or program is hereinafter referred to as the "Project"); and
WHEREAS, payment of the Capital Expenditures will be, or has been financed,
in whole or in part, on an interim basis from moneys other than proceeds of a borrowing,
(collectively, the "Temporary Advances"); and
WHEREAS, it is reasonably expected that the Temporary Advances will be
reimbursed with the proceeds of one or more borrowings not later than 18 months after
the later of (i) the date on which the first Capital Expenditure financed by a Temporary
Advance was paid, or (ii) the date on which the Project is placed in service or
abandoned (but in no event more that 3 years after the date on which the first Capital
Expenditure financed by a Temporary Advance was paid); and
WHEREAS, except for architectural, engineering and similar preliminary
expenditures incurred prior to the acquisition or commencement of construction of the
Project (but not including land acquisition, site preparation and other similar costs
incident to the acquisition or commencement of construction of the Project), this
resolution is being adopted prior to or within 60 days of the first Capital Expenditure
financed by a Temporary Advance;
NOW, THEREFORE, BE IT RESOLVED, by the Common Council of the City of
Oshkosh, that the Council hereby declares its official intent for purposes of Treasury
Regulation Section 1.150-2 to reimburse the Capital Expenditures for the Project
Financed by Temporary Advances with the proceeds of one or more borrowings, the
maximum aggregate principal amount of which is not expected to exceed $ 3,500,000.
BE IT FURTHER RESOLVED that this resolution shall be made available for
public inspection pursuant to Chapter 19, of the Wisconsin Statutes.
Adopted:
Approved:
,2003
,2003
Stephen Hintz, Mayor
Pamela Ubrig, City Clerk
EXHIBIT A
WASTEWATER TREATMENT FACILITY IMPROVEMENTS
The Project includes the legal, financial, planning, design, and construction services; the
construction of new electrical power generation and control facilities; and renovation
and rehabilitation of existing electrical power control and distribution facilities at the City
of Oshkosh Wastewater Treatment Plant. Planning for the Project is documented in
December 6, 2002 and April 2, 2003 Engineering Report / Facilities Planning letters to
the Wisconsin Department of Natural Resources, prepared by Strand Associates, Inc.
The project includes the engine generation equipment and other supporting facilities
and improvements. Two 880 't<Y\I natural gas fired engine generators will be located in
a new structure located in the south east corner of the treatment plant along Dempsey
Drive. Space will be provided in the structure for a future third generator. Also included
in the project are switch gear to interface the generators with utility power and the
treatment plant, new service entrance switch gear for utility power, replacement of
electrical conductors to several treatment plant unit substations, renovation of the
automated control system serving the treatment plant, and improvements to the
ventilation system serving the treatment facility laboratory. Relocation of intercepting
sewers along Dempsey Drive will be required to accommodate the engine generator
facility.