HomeMy WebLinkAbout03-241.docAUGUST 12, 2003 03-241 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: CHANGE ORDER NO. 1-6, PUBLIC WORKS CONTRACT 02-01 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: LUNDA CONSTRUCTION COMPANY PO Box 669 Black River Falls, WI 54615 Change Order No. 1 - Decrease in Contract Change Order No. 2 - Increase in Contract Change Order No. 3 - Increase in Contract Change Order No. 4 - No monetary change to contract. Change Order No. 5 - Increase in contract Change Order No. 6 - Increase in contract ($7,500.00 $2,100.00 $70,344.00 $6,003.59 $4O5.3O PURPOSE: See attached Change Orders. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 - Water Utility - Constr. in Progress CHANGE ORDER CITY OF OSHKOSH, WI CITY CONTRACT 02-01, RAW WATER INTAKE AND TRANSMISSION MAIN Order No. 1 Date: June 9, 2003 Agreement Date: May 28, 2002 NAME OF PROJECT: City Contract 02-01, Raw Water Intake and Transmission Main OWNER: City of Oshkosh CONTRACTOR: Lunda Construction Company The following changes are hereby made to the CONTRACT DOCUMENTS: Contractor is hereby authorized to access Lake Winnebago from the temporary storage and work area on and adjacent to Lake Shore Drive east of the Water Treatment Plant (WTP) site. This authorization is subject to the conditions stipulated in the attached letter dated June 26, 2002 from David C. Patek of the City of Oshkosh to Paul Gevers of Lunda Construction Company. Contractor's designated storage and work areas east of the WTP and in the vicinity of the proposed Divemion Vault in Menominee Park are also revised to the areas as shown on attached Figures COl-1 and CO1~2, respectively. The proposed location and approximate dimensions of the access pier are shown on the attached exhibits A and B to the June 27, 2002 letter from Lunda Construction Company to Kristy Rogers at the Wisconsin Department of Natural Resources (WDNR). All other conditions and requirements of the Contract Documents shall remain unchanged. Reason for change: During the preparation ofbidsl the Contractor had reached a verbal agreement with a property owner to lease a parcel of land for loading and unloading materials' along the river across from the Pioneer Resort. Following the award of Contract, the property owner refused to lease the land to the Contractor. The Contractor diligently pursued acquiring an alternative site, but sites that were technically suitable and within a reasonable distance from the project site were not available. Use of remote sites, would have resulted in a claim for additional costs from the Contractor. The Contractor requested permission from the City to construct the access pier described earlier and offered a credit therefor. The credit offer was reviewed by the Engineer and the Owner, and found to be reasonable. 6/6/2003 COl - 1 Change to CONTRACT PRICE: Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER Total Decrease in CONTRACT PRICE for this CHANGE ORDERNo. 1 The CONTRACT PRICE including this CHANGE ORDER will be Change to CONTRACT TIME: The CONTRACT TIME will be not be changed by this CHANGE ORDER The date for completion of all work remains unchanged. $ 7,304,076.00 $ 7,304,076.00 (7,500.00) $ 7,296,576.00 6/6/2003 CO1 - 2 APPROVALS Recommended by (Engineer): Accepted by (Contractor): Recommended: D{~ector of Public V~orks Date Date By: CITY OF OSHKOSH City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. APPROVED Comptroller City Attorney 6/24/2003 CO1 ~ 3 CHANGE ORDER CITY OF OSHKOSH, WI CITY CONTRACT 02-01, RAW WATER INTAKE AND TRANSMISSION MAIN Order No. 2 Date: June 9, 2003 Agreement Date: May 28, 2002 NAME OF PROJECT: City Contract 02-01, Raw Water Intake and Transmission Main OWNER: City of Oshkosh CONTRACTOR: Lunda Construction Company The following changes are hereby made to the CONTRACT DOCUMENTS: Contractor is hereby author/zed to provide gearbox operators for the t;vo 24-inch diameter gate valves to be installed on the existing raw water intake pipelines. Gearbox operators shall be suitable for buried service. All other conditions and requirements of the Contract Documents shall remain unchanged. Reason for change: Geared operators were requested in order to facilitate operation of the valves under high differential head conditions. The valve manufacturer did not normally furnish this type of opel:ator as standard equipment for a valve of this size. The Contractor's proposal of December 10, 2002 to furnish and install the operators was reviewed by the Engineer and the Owner, and found to be reasonable. A copy of this document is attached hereto. 6/6/2003 C02 - 1 Change to CONTRACT PRICE: Or/ginal CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER Total Increase in CONTRACT PRICE for this CHANGE ORDER No. 2 The CONTRACT PRICE including this CHANGE ORDER will be Chan~e to CONTRACT TIME: The CONTRACT TIME will be not be changed by this CHANGE ORDER The date for completion o£all work remains unchanged. $ 7,304,076.00 $ 7,296,576.00 $ 2,100.00 $ 7,298,676.00 6/6/2003 C02 - 2 APPROVALS Recommended by (Engineer): Accepted by (Contractor): Date Recommended: Director of Public Works CITY OF OSHKOSH By: City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller APPROVED City Attorney 6/24/2003 C02 - 3 CHANGE ORDER CITY OF OSHKOSH, WI CITY CONTRACT 02-01, RAW WATER INTAKE AND TRANSMISSION MAIN Order No. 3 Date: June 9, 2003 Agreement Date: May 28, 2002 NAME OF PROJECT: City Contract 02-01, Raw Water Intake and Transmission Main OWNER: City of Oshkosh CONTRACTOR: Lunda Construction Company The following changes are hereby made to the CONTRACT DOCUMENTS: Contractor is hereby authorized to provide 1,277 lineal feet of deep-water turbidity barrier for the 2002 construction season. The barrier shall be provided at the Contract unit price of $72 per lineal foot. The quantity of deep-water turbidity barrier provided during the 2002 construction season is independent of any future work during the 2003 construction season. This change order in no way implies that additional deep water turbidity barrier will be approved. All other conditions and requirements of the Contract Documents shall remain unchanged. Reason for chan~e: The Wisconsin Department of Natural Resources (WDNR) has been regularly monitoring construction on the lake for compliance with the Section 30 Permit for this project. Based on its assessment of the effectiveness of the construction methods and means being employed by the Contractor to control turbidity, the WDNR ordered that additional deep water turbidity barrier be placed around construction areas in the lake. Extensive discussions were held between the City, the WDNR, the Contractor and the Engineer to limit the extent of the additional barrier to be provided. 6/s/2003 CO3 - 1 Change to CONTRACT PRICE: Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER Total Increase in CONTRACT PRICE for this CHANGE ORDER No. 3 The CONTRACT PRICE including this CHANGE ORDER will be ChanCe to CONTRACT TIME: The CONTRACT TIME will be not be changed by this CHANGE ORDER The date for completion of all work remains unchanged. _ 7,30_4,076._~00 7,298,676.00 $ .___70,344.00 $ 7,369,020.00 6/6/2003 C03 - 2 APPROVALS Recommended by (Engineer): Accepted by (Contractor): Recommended: Director of Public Wdrks Date Date By: CITY OF OSHKOSH City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. APPROVED Comptroller City Attorney 6/24/2003 CO3 - 3 CHANGE ORDER ~ ,. CITY OF OSHKOSH, WI CITY CONTRACT 02-01, RAW WATER INTAKE AND TRANSMISSION MAIN Order No. 4 Date: June 9, 2003 Agreement Date: May 28, 2002 NAME OF PROJECT: City Contract 02-01, Raw Water Intake and Transmission Main OWNER: City of Oshkosh CONTRACTOR: Lunda Construction Company The following changes are hereby made to the CONTRACT DOCUMENTS: In accordance with discussions in the field between the Contractor, the Engineer and the Owner, the Contractor is hereby authorized to reconfigure the site piping in the vicinity of the Low-lift/High-lift Pumping Station to extend the existing north 24-inch diameter intake pipe to reconnect to the previously abandoned portion of the 24-inch intake. This would be done in lieu of removing and capping the two existing 24-inch and two existing 14-inch diameter pipes at the Pumping Station, as provided for in the Contract Documents. In accordance with discussions in the field between the Contractor, the Engineer and the Owner, the Contractor is hereby authorized to reconfigure the site piping in the vicinity of the Low-lift/High-lift Pumping Station to extend the existing 14-inch diameter backflush line together with the 30-inch raw water transmission main so as to allow backflushing of the new 60-inch intake pipeline. This would be done in combination with item No. 1 above and in lieu of the 30-inch raw water transmission ma/n configuration as provided for in the Contract Documents. Contractor shall provide an ISCO, Inc flowmeter and transmitter in accordance with the verbal request in the field on October 1, 2002. This flowmetering system is to be provided in lieu of the Krohne flowmetering system specified in Section 15165 of the Specifications. Contractor shall use fused joints in lieu of quick-cormect couplings at ail locations in the three chemical system manholes along Merr/tt Street where said couplings are shown on the 3-inch diameter HDPE piping. All other conditions and requirements of the Contract Documents shall remain unchanged. 6/6/2003 CO4 - 1 The Contractor has proposed to make the above changes at no change in:fl~e Contract Price in accordance with the attached correspondence dated November 14, 2002 and January 10, 2003. Reason for changes: The Contractor proposed a modification to existing site piping that would provide the City with the capability to use both of the 24-inch diameter intakes, one of which was previously abandoned. The Contractor proposed to do this work concurrently with the work described under item 2 below, which together would result in no change in the Contract Price. The proposal was reviewed by the Engineer and the Owner, and found to be reasonable. The City requested a reconfiguration of the existing 30-inch diameter transmission main and 14-inch diameter intake backflush line to facilitate backflushing of the new 60-inch diameter transmission main. The Contractor proposed to do this work concurrently with the work described under item 1 above, which together would result in no change in the Contract Price. The Contractor's proposal was reviewed by the Engineer and Owner and found to be reasonable. The City requested a change in the brand of flowmeter to be provided for the chemical feed system. This request was based on the excellent performance of a replacement flowmeter and transmitter previously placed in service by the City. The Contractor proposed to make this change at no change in the Contract Price. This proposal was reviewed by the Engineer and the Owner and found to be reasonable. The Contractor proposed using fused joints in lieu of 3-inch quick disconnects for the HDPE piping in the three chemical system manholes along Men'ia Street. The Contractor proposed to do the work at no change in the Contract Price. This proposal was reviewed by the Engineer and the Owner and found to be reasonable. C04 - 2 Change to CONTRACT PRICE: :,; Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER Total Change in CONTRACT PRICE for this CHANGE ORDER No. 4 The CONTRACT PRICE including this CHANGE ORDER will be Change to CONTRACT TIME: The CONTRACT TIME will be not be changed by this CHANGE ORDER The date for completion of all work remains unchanged. $ 7,304,076.00 $ 7,369,020.00 $ 0.00 $ 7,369,020.00 6/6/2003 CO4 - 3 APPROVALS Recommended by {Engineer): Accepted by (Contractor): Recommended: D~rector of Pubhc Works Date Date By: CITY OF OSHKOSH City Manager City Clerk I certify that provision has been made to pay the liability that will accrue io the City of Oshkosh, Wisconsin, under the within Change Order. APPROVED Comptroller City Attorney 6/24/2003 C04 - 4 CHANGE ORDER CITY OF OSHKOSH, WI CITY CONTRACT 02-01, RAW WATER INTAKE AND TRANSMISSION MAIN Order No. 5 Date: June 9, 2003 Agreement Date: May 28, 2002 NAME OF PROJECT: City Contract 02-01, Raw Water Intake and Transmission Main OWNER: City of Oshkosh CONTRACTOR: Lunda Construction Company The following changes are hereby made to the CONTRACT DOCUMENTS: Contractor is hereby authorized to provide tamperproof covers, in lieu of those specified, for the seven manhole covers on the Diversion Vault, for the one chemical system manhole southwest of the Diversion Vault and for the three chemical system manholes located along Merritt Avenue, outside of the north fence line of the water treatment plant site. This change is accordance with ihe request in Field Memorandum No. 4, dated July 15, 2002, and the Contractor's proposal dated January 22, 2003. These documents are attached hereto. All other conditions and requirements of the Contract Documents shall remain unchanged. Reason for change: The City requested this modification to facilitate implementation of measureS to protect the water system from potential terrorist activities. The Contractor's cost proposal for this work was reviewed by the Engineer and the Owner and found to be reasonable. 6/17/2003 CO5 - 1 Change to CONTRACT PRICE: Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER Total Increase in CONTRACT PRICE for this CHANGE ORDER No. 5 The CONTRACT PRICE including this CHANGE ORDER will be Change to CONTRACT TIME: The CONTRACT TIME will be not be changed by this CHANGE ORDER The date for completion of all work remains unchanged. $ 7,304,076.00 $ 7,369,020.00 $ 6,003.59 $ 7,375,023.59 6/17/2003 C05 - 2 APPROVALS Recommended by (Engineer): Accepted by (Contractor): Recommended: Date Date By: CITY OF OSHKOSH City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. APPROVED Comptroller City Attorney 6/24/2003 CO5 - 3 CHANGE ORDER CITY OF OSHKOSH, WI CITY CONTRACT 02-01, RAW WATER INTAKE AND TRANSMISSION MAIN Order No. 6 Date: June 9, 2003 Agreement Date: May 28, 2002 NAME OF PROJECT: City Contract 02-01, Raw Water Intake and Transmission Main OWNER: City of Oskkosh CONTRACTOR: Lunda Construction Company The following changes are hereby made to the CONTRACT DOCUMENTS: Contractor is hereby authorized to provide an 18-inch ring to raise the top elevation of the chemical system manhole at Station 0+16 to match existing grade at approximately El. 752.08. This change is accordance with the verbal request in the field on February 7, 2003 and the Contractor's proposal dated February 10, 2003, a copy of which is attached hereto. All other conditions and requirements of the Contract Documents shall remain unchanged. Reason for chan~e: This modification was requested to limit potential inflow of stormwater drainage into the casing pipe for the chemical feed pipes along Merritt Avenue. The Contractor's cost proposal for this work was reviewed by the Engineer and the Owner and found to be reasonable. 6/6/2003 CO6 - i Change to CONTRACT PRICE: Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER Total Increase in CONTRACT PRICE for this CHANGE ORDER No. 6 The CONT1L4CT PRICE including this CHANGE ORDER will be Chanqe to CONTRACT TIME: The CONTRACT TIME will be not be changed by this CHANGE ORDER The date for completion of all work remains unchanged. $ 7,304,076.00 $ 7,375,023.59 $ 405.30 $ 7,375,428.89 6/6/2003 CO6 - 2 APPROVALS Recommended by (Engineer): Accepted by (Contractor): Recommended: Director of Public 'vX)orks Date o7/o / o Date By: CITY OF OSHKOSH City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. APPROVED Comptroller City Attorney 6/24/2003 C06 - 3